DALLAS US 175 (0197-02-133)

Items: 44

County: DALLAS
Length: N/A
Highway: US 175
District: DALLAS
Control Number: 0197-02-133
DBE Goal: N/A
Project: CM 2022(485)
Guaranty: N/A
Time: 200 WORKING DAYS
Engineer's Estimate: $2,293,618.55
Date: 05/04/2022 (4 years ago)
Contract Number: N/A
Type: INSTALLATION OF WIRELESS ITS SYSTEM
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Documents:
Bidders (4)
E
Engineer's Estimate
$2,293,618.55
Over/Under Est: -8.53% -$195,636.12
$2,625,368.65
Over/Under Est: 14.46% $331,750.10
Amt Left: 25.14% $527,386.22
$2,860,300.37
Over/Under Est: 24.71% $566,681.82
Amt Left: 36.34% $762,317.94
Delta: -8.95% -$234,931.72
Over/Under Est: 55.15% $1,264,990.15
Amt Left: 69.62% $1,460,626.27
Delta: -24.41% -$698,308.33
Subcontractor Percentage Amount
JR WEST TEXAS CONCRETE LLC 3.70% $77,625.35
FORTSON CONTRACTING, INC. 2.86% $60,002.30
DALLAS FOUNDATION DRILLING CO., INC. 1.69% $35,455.90
TEXAS TRAFFIC AND BARRICADE, LLC 1.51% $31,679.53
MEX DRILLING 0.99% $20,770.03
Total: 10.75% $225,533.11

Bid Items & Bid Tabulations

44 Total 0 of 44
DALLAS  |  US 175  |  DALLAS  |  0197-02-133  |  05/04/2022  |  $2,293,618.55  |  CM 2022(485)  |  INSTL OF WIRELESS ITS SYSTEM  |  200 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
FLORIDA TRAFFIC CONTROL DEVICES, INC.
MICA CORPORATION
SICE, INC.
HIGHWAY INTELLIGENT TRAFFIC SOLUTIONS, INC.
DRILL SHAFT (48 IN)
LF 441.000 $427.000 $388.760 $459.050 $823.802 $592.400
DRILL SHAFT (54 IN)
LF 42.000 $485.000 $496.730 $677.000 $898.008 $675.500
RIPRAP (CONC)(4 IN)
CY 26.250 $1,700.000 $466.630 $683.000 $1,388.249 $1,058.750
RIPRAP (MOW STRIP)(4 IN)
CY 88.500 $1,150.000 $704.320 $683.000 $808.249 $890.750
MOBILIZATION
LS 1.000 $125,000.000 $165,614.970 $159,140.000 $148,839.163 $350,060.460
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 10.000 $13,500.000 $7,732.420 $9,085.000 $9,650.640 $10,140.000
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 300.000 $8.000 $8.610 $12.900 $16.240 $3.340
BIODEG EROSN CONT LOGS (REMOVE)
LF 300.000 $5.000 $5.060 $6.600 $2.165 $0.840
MTL W-BEAM GD FEN (STEEL POST)
LF 887.500 $35.000 $39.580 $29.600 $38.732 $37.320
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 10.000 $1,400.000 $1,863.030 $1,174.000 $1,584.507 $1,488.000
REMOVE TERMINAL ANCHOR SECTION
EA 1.000 $268.000 $289.890 $210.000 $234.742 $318.000
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 1.000 $220.000 $289.890 $210.000 $234.742 $318.000
GUARDRAIL END TREATMENT (INSTALL)
EA 8.000 $3,000.000 $3,642.960 $3,082.000 $3,579.812 $3,528.000
CONDT (PVC) (SCH 40) (2")
LF 10,415.000 $11.000 $11.900 $12.880 $23.474 $17.740
CONDT (PVC) (SCH 40) (2") (BORE)
LF 2,077.000 $22.000 $17.860 $30.530 $35.211 $27.220
CONDT (PVC) (SCH 40) (3")
LF 234.000 $17.000 $15.710 $15.120 $29.343 $25.430
CONDT (PVC) (SCH 80) (2")
LF 460.000 $15.000 $16.580 $31.990 $23.474 $17.880
ELEC CONDR (NO.8) BARE
LF 2,352.000 $1.350 $1.080 $1.390 $0.839 $1.670
ELEC CONDR (NO.8) INSULATED
LF 4,704.000 $1.500 $1.260 $1.590 $0.965 $1.780
ELEC CONDR (NO.6) BARE
LF 3,774.000 $1.500 $1.440 $1.620 $1.158 $2.210
ELEC CONDR (NO.6) INSULATED
LF 8,149.000 $1.650 $1.600 $1.890 $1.226 $2.280
ELEC CONDR (NO.4) BARE
LF 4,021.000 $2.500 $1.870 $2.000 $1.659 $2.960
ELEC CONDR (NO.4) INSULATED
LF 8,042.000 $2.500 $2.270 $2.360 $1.967 $3.060
ELEC CONDR (NO.2) BARE
LF 962.000 $3.500 $2.410 $3.110 $3.011 $4.190
ELEC CONDR (NO.2) INSULATED
LF 2,886.000 $3.500 $3.210 $3.640 $2.985 $4.290
GROUND BOX TY A (122311)
EA 19.000 $700.000 $516.340 $852.000 $586.854 $1,027.000
GROUND BOX TY D (162922)
EA 23.000 $850.000 $666.620 $924.000 $1,701.878 $1,461.750
ELC SRV TY D 120/240 060(NS)GS(N)TP(O)
EA 6.000 $3,600.000 $2,876.020 $4,270.000 $2,251.597 $7,228.750
ELC SRV TY D 120/240 060(NS)SS(N)PS(U)
EA 17.000 $6,000.000 $5,110.360 $7,671.000 $8,609.238 $9,497.500
INS OH SN SUP(30 FT BAL TEE)
EA 2.000 $27,000.000 $30,211.260 $30,225.000 $35,099.800 $33,720.190
SIGN WALKWAY (48 IN) WITH HNDRL
LF 92.000 $350.000 $525.410 $165.000 $440.481 $469.250
INSTL DEL ASSM (D-SW)SZ (BRF)GF1
EA 27.000 $21.500 $59.120 $50.000 $21.714 $30.300
TREE TRIMMING AND BRUSH REMOVAL
LF 100.000 $10.000 $18.730 $60.000 $19.822 $420.000
ITS SYSTEM SUPPORT EQUIPMENT
LS 1.000 $50,000.000 $41,378.830 $61,310.000 $48,832.991 $61,120.000
CCTV FIELD EQUIPMENT (DIGITAL)
EA 21.000 $7,000.000 $4,844.400 $7,767.000 $8,860.109 $10,102.500
CCTV MOUNT (POST)
EA 21.000 $500.000 $235.310 $482.000 $897.909 $691.000
INSTALL DMS (FOUNDATION MTD CABINET)
EA 2.000 $15,000.000 $7,518.040 $25,200.000 $9,381.347 $15,870.000
SYSTEM INTEGRATION
LS 1.000 $30,000.000 $11,328.450 $24,075.000 $17,606.808 $81,600.000
ITS RADIO (SNGL)(5 GHZ)-C-P
EA 46.000 $4,100.000 $3,397.130 $5,715.000 $3,278.072 $9,835.380
RELOCATE ITS RADIO
EA 2.000 $1,580.000 $1,090.030 $3,074.000 $1,686.523 $2,645.000
ITS POLE (60 FT)(90 MPH)
EA 21.000 $14,000.000 $19,933.110 $18,873.000 $21,599.826 $24,819.000
ITS POLE MNT CAB (TY 3)(CONF 1)
EA 21.000 $6,500.000 $4,008.410 $5,735.000 $4,083.430 $7,460.000
TMA (STATIONARY)
DAY 55.000 $200.000 $199.580 $98.450 $816.561 $288.000
ITS RVSD (DATA COLLECT & WWA) SYS
EA 24.000 $9,000.000 $7,325.900 $13,830.000 $11,623.778 $13,385.000
Totals: $2,293,618.550 $2,097,982.438 $2,625,368.650 $2,860,300.522 $3,558,608.712