Job Info for 0197-02-133

County: DALLAS Highway: US 175 Date: 05/04/2022 (2 years ago) Engineer's Estimate: $2,293,619 Control Number: 0197-02-133
Project: CM 2022(485) District: DALLAS Time: 200 WORKING DAYS Type: INSTALLATION OF WIRELESS ITS SYSTEM
HCS
Pay Estimates: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14
Plans

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $2,293,618.55
FLORIDA TRAFFIC CONTROL DEVICES, INC.   $2,097,982.43 1
-8.53% | -$195,636.12
MICA CORPORATION   $2,625,368.65 2
14.46% | $331,750.10
25.14% | $527,386.22
SICE, INC.   $2,860,300.37 3
24.71% | $566,681.82
36.34% | $762,317.94
8.95% | $234,931.72
HIGHWAY INTELLIGENT TRAFFIC SOLUTIONS, INC.   $3,558,608.70 4
55.15% | $1,264,990.15
69.62% | $1,460,626.27
24.41% | $698,308.33
Subcontractor Percentage Amount
JR WEST TEXAS CONCRETE LLC 3.69% $77,415.55
FORTSON CONTRACTING, INC. 2.86% $60,002.30
DALLAS FOUNDATION DRILLING CO., INC. 1.69% $35,455.90
TEXAS TRAFFIC AND BARRICADE, LLC 1.51% $31,679.53
MEX DRILLING 0.98% $20,560.23
Total: 10.73% $225,113.51

Bid Items

Items: 44, 0 filtered
DALLAS US 175  |  DALLAS  |  0197-02-133  |  05/04/2022  |  $2,293,619  |  CM 2022(485)  |  INSTL OF WIRELESS ITS SYSTEM  |  200 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate FLORIDA TRAFFIC CONTROL DEVICES, INC. MICA CORPORATION SICE, INC. HIGHWAY INTELLIGENT TRAFFIC SOLUTIONS, INC.
416 6006 DRILL SHAFT (48 IN) LF 441.000 $427.000 $388.760 $459.050 $823.802 $592.400
416 6007 DRILL SHAFT (54 IN) LF 42.000 $485.000 $496.730 $677.000 $898.008 $675.500
432 6001 RIPRAP (CONC)(4 IN) CY 26.250 $1,700.000 $466.630 $683.000 $1,388.249 $1,058.750
432 6045 RIPRAP (MOW STRIP)(4 IN) CY 88.500 $1,150.000 $704.320 $683.000 $808.249 $890.750
500 6001 MOBILIZATION LS 1.000 $125,000.000 $165,614.970 $159,140.000 $148,839.163 $350,060.460
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 10.000 $13,500.000 $7,732.420 $9,085.000 $9,650.640 $10,140.000
506 6042 BIODEG EROSN CONT LOGS (INSTL) (18") LF 300.000 $8.000 $8.610 $12.900 $16.240 $3.340
506 6043 BIODEG EROSN CONT LOGS (REMOVE) LF 300.000 $5.000 $5.060 $6.600 $2.165 $0.840
540 6002 MTL W-BEAM GD FEN (STEEL POST) LF 887.500 $35.000 $39.580 $29.600 $38.732 $37.320
540 6016 DOWNSTREAM ANCHOR TERMINAL SECTION EA 10.000 $1,400.000 $1,863.030 $1,174.000 $1,584.507 $1,488.000
542 6002 REMOVE TERMINAL ANCHOR SECTION EA 1.000 $268.000 $289.890 $210.000 $234.742 $318.000
542 6003 REMOVE DOWNSTREAM ANCHOR TERMINAL EA 1.000 $220.000 $289.890 $210.000 $234.742 $318.000
544 6001 GUARDRAIL END TREATMENT (INSTALL) EA 8.000 $3,000.000 $3,642.960 $3,082.000 $3,579.812 $3,528.000
618 6023 CONDT (PVC) (SCH 40) (2") LF 10,415.000 $11.000 $11.900 $12.880 $23.474 $17.740
618 6024 CONDT (PVC) (SCH 40) (2") (BORE) LF 2,077.000 $22.000 $17.860 $30.530 $35.211 $27.220
618 6029 CONDT (PVC) (SCH 40) (3") LF 234.000 $17.000 $15.710 $15.120 $29.343 $25.430
618 6046 CONDT (PVC) (SCH 80) (2") LF 460.000 $15.000 $16.580 $31.990 $23.474 $17.880
620 6007 ELEC CONDR (NO.8) BARE LF 2,352.000 $1.350 $1.080 $1.390 $0.839 $1.670
620 6008 ELEC CONDR (NO.8) INSULATED LF 4,704.000 $1.500 $1.260 $1.590 $0.965 $1.780
620 6009 ELEC CONDR (NO.6) BARE LF 3,774.000 $1.500 $1.440 $1.620 $1.158 $2.210
620 6010 ELEC CONDR (NO.6) INSULATED LF 8,149.000 $1.650 $1.600 $1.890 $1.226 $2.280
620 6011 ELEC CONDR (NO.4) BARE LF 4,021.000 $2.500 $1.870 $2.000 $1.659 $2.960
620 6012 ELEC CONDR (NO.4) INSULATED LF 8,042.000 $2.500 $2.270 $2.360 $1.967 $3.060
620 6015 ELEC CONDR (NO.2) BARE LF 962.000 $3.500 $2.410 $3.110 $3.011 $4.190
620 6016 ELEC CONDR (NO.2) INSULATED LF 2,886.000 $3.500 $3.210 $3.640 $2.985 $4.290
624 6001 GROUND BOX TY A (122311) EA 19.000 $700.000 $516.340 $852.000 $586.854 $1,027.000
624 6009 GROUND BOX TY D (162922) EA 23.000 $850.000 $666.620 $924.000 $1,701.878 $1,461.750
628 6133 ELC SRV TY D 120/240 060(NS)GS(N)TP(O) EA 6.000 $3,600.000 $2,876.020 $4,270.000 $2,251.597 $7,228.750
628 6151 ELC SRV TY D 120/240 060(NS)SS(N)PS(U) EA 17.000 $6,000.000 $5,110.360 $7,671.000 $8,609.238 $9,497.500
650 6028 INS OH SN SUP(30 FT BAL TEE) EA 2.000 $27,000.000 $30,211.260 $30,225.000 $35,099.800 $33,720.190
654 6006 SIGN WALKWAY (48 IN) WITH HNDRL LF 92.000 $350.000 $525.410 $165.000 $440.481 $469.250
658 6015 INSTL DEL ASSM (D-SW)SZ (BRF)GF1 EA 27.000 $21.500 $59.120 $50.000 $21.714 $30.300
752 6022 TREE TRIMMING AND BRUSH REMOVAL LF 100.000 $10.000 $18.730 $60.000 $19.822 $420.000
6003 6001 ITS SYSTEM SUPPORT EQUIPMENT LS 1.000 $50,000.000 $41,378.830 $61,310.000 $48,832.991 $61,120.000
6010 6002 CCTV FIELD EQUIPMENT (DIGITAL) EA 21.000 $7,000.000 $4,844.400 $7,767.000 $8,860.109 $10,102.500
6010 6005 CCTV MOUNT (POST) EA 21.000 $500.000 $235.310 $482.000 $897.909 $691.000
6028 6002 INSTALL DMS (FOUNDATION MTD CABINET) EA 2.000 $15,000.000 $7,518.040 $25,200.000 $9,381.347 $15,870.000
6032 6001 SYSTEM INTEGRATION LS 1.000 $30,000.000 $11,328.450 $24,075.000 $17,606.808 $81,600.000
6062 6024 ITS RADIO (SNGL)(5 GHZ)-C-P EA 46.000 $4,100.000 $3,397.130 $5,715.000 $3,278.072 $9,835.380
6062 6042 RELOCATE ITS RADIO EA 2.000 $1,580.000 $1,090.030 $3,074.000 $1,686.523 $2,645.000
6064 6055 ITS POLE (60 FT)(90 MPH) EA 21.000 $14,000.000 $19,933.110 $18,873.000 $21,599.826 $24,819.000
6064 6088 ITS POLE MNT CAB (TY 3)(CONF 1) EA 21.000 $6,500.000 $4,008.410 $5,735.000 $4,083.430 $7,460.000
6185 6002 TMA (STATIONARY) DAY 55.000 $200.000 $199.580 $98.450 $816.561 $288.000
6304 6002 ITS RVSD (DATA COLLECT & WWA) SYS EA 24.000 $9,000.000 $7,325.900 $13,830.000 $11,623.778 $13,385.000
Totals: $2,293,618.55 $2,097,982.44 $2,625,368.65 $2,860,300.52 $3,558,608.71