Show Job Controls
Bid Cobra

DALLAS US 175 (0197-02-121)

Items: 91

County: DALLAS
Length: N/A
Highway: US 175
District: DALLAS
Control Number: 0197-02-121
DBE Goal: N/A
Project: C 197-2-121
Guaranty: N/A
Time: 225 WORKING DAYS
Engineer's Estimate: $13,537,206.26
Date: 06/05/2018 (8 years ago)
Contract Number: N/A
Type: SLOPE FAILURE REPAIRS
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (4)
E
Engineer's Estimate
$13,537,206.26
$11,432,222.08
Over/Under Est: -15.55% -$2,104,984.18
Over/Under Est: -14.38% -$1,946,560.91
Amt Left: 1.39% $158,423.27
$13,792,710.24
Over/Under Est: 1.89% $255,503.98
Amt Left: 20.65% $2,360,488.16
Delta: -19.00% -$2,202,064.89
$16,442,987.68
Over/Under Est: 21.47% $2,905,781.42
Amt Left: 43.83% $5,010,765.60
Delta: -19.22% -$2,650,277.44

Bid Items & Bid Tabulations

91 Total 0 of 91
DALLAS  |  US 175  |  DALLAS  |  0197-02-121  |  06/05/2018  |  $13,537,206.26  |  C 197-2-121  |  SLOPE FAILURE REPAIRS  |  225 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
AUSTIN BRIDGE & ROAD SERVICES, LP
OLDCASTLE MATERIALS TEXAS, INC.
A. L. HELMCAMP, INC.
FNH CONSTRUCTION, LLC
PREPARING ROW
STA 375.510 $500.000 $630.000 $400.000 $500.000 $4,000.000
REMOVING CONC (RIPRAP)
SY 297.000 $12.000 $14.000 $18.000 $65.000 $20.000
REMOVING CONC (FLUME)
SY 108.000 $11.000 $21.000 $24.000 $65.000 $20.000
REMOVING STAB BASE & ASPH PAV(14")
SY 6,495.000 $6.000 $6.500 $6.550 $8.000 $20.000
REMOVING STAB BASE & ASPH PAV (12")
SY 5,680.000 $5.500 $8.000 $5.850 $7.000 $20.000
EXCAVATION (ROADWAY)
CY 5,888.000 $8.750 $18.000 $17.000 $16.000 $20.000
EMBANKMENT (FINAL) (DENS CONT) (TY C2)
CY 3,553.000 $20.000 $26.000 $24.000 $26.000 $35.000
BACKFILL (TY A OR B)
STA 617.550 $150.000 $80.000 $160.000 $125.000 $250.000
BLADING
STA 616.510 $80.000 $47.000 $68.000 $50.000 $300.000
COMPOST MANUF TOPSOIL (4")
SY 122,028.000 $1.250 $0.700 $0.850 $1.100 $2.250
DRILL SEED (TEMP)(WARM OR COOL)
SY 122,028.000 $0.200 $0.120 $0.080 $0.120 $0.500
VEGETATIVE WATERING
MG 3,906.000 $10.000 $0.050 $0.010 $20.000 $30.000
SUPERPAVE MIXTURES SP-B PG64-22
TON 19,700.000 $70.000 $73.000 $73.000 $80.000 $85.000
SUPERPAVE MIXTURES SP-C SAC-A PG64-22
TON 21,006.000 $90.000 $82.000 $85.500 $86.000 $90.000
SUPERPAVE MIXTURES SP-C SAC-B PG64-22
TON 13,088.000 $85.000 $70.000 $72.500 $81.000 $90.000
PLAN & TEXT ASPH CONC PAV(0" TO 4")
SY 5,680.000 $4.000 $1.950 $1.550 $2.900 $10.000
PLAN & TEXT ASPH CONC PAV(0" TO 6")
SY 245,360.000 $7.000 $1.700 $1.300 $3.000 $2.750
PLANE ASPH CONC PAV (3")
SY 9,245.000 $2.750 $2.200 $2.000 $2.300 $10.000
PAV JT UNDERSEAL (24")
LF 736.000 $40.000 $36.000 $33.000 $35.000 $100.000
FULL-DEPTH REPAIR CPCD (9") HES
SY 3,000.000 $175.000 $152.000 $165.000 $230.000 $200.000
DRILL SHAFT (18 IN)
LF 8,694.000 $73.000 $55.000 $90.000 $86.000 $68.000
CL C CONC (RAIL FOUNDATION)(HPC)
CY 1,470.000 $425.000 $625.000 $600.000 $460.000 $400.000
CONC STR REPAIR(DECK REP (FULL DEPTH))
SF 240.000 $200.000 $350.000 $385.000 $30.000 $450.000
RIPRAP (CONC)(4 IN)
CY 49.000 $400.000 $470.000 $535.000 $980.000 $550.000
RIPRAP (CONC)(FLUME)
CY 21.000 $400.000 $700.000 $535.000 $550.000 $550.000
RIPRAP (MOW STRIP)(4 IN)
CY 163.200 $475.000 $550.000 $485.000 $580.000 $550.000
CLEANING AND SEALING EXISTING JOINTS
LF 308.000 $4.500 $37.000 $45.000 $48.000 $100.000
RAIL (TY T551)
LF 6,615.000 $45.000 $45.000 $56.000 $78.000 $86.000
RETROFIT RAIL (TY T631)
LF 1,620.000 $200.000 $65.000 $62.000 $80.000 $165.000
MOBILIZATION
LS 1.000 $915,000.000 $1,150,000.000 $851,625.000 $1,300,000.000 $1,500,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 11.000 $11,000.000 $4,500.000 $17,000.000 $24,000.000 $8,500.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 260.000 $26.000 $22.000 $21.500 $35.000 $30.000
ROCK FILTER DAMS (REMOVE)
LF 260.000 $8.000 $7.000 $12.000 $4.000 $20.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,000.000 $2.050 $3.000 $3.000 $6.000 $4.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,000.000 $0.650 $0.500 $1.000 $2.000 $2.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 14,646.000 $4.250 $3.000 $2.200 $3.500 $12.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 14,646.000 $0.850 $0.800 $0.500 $1.000 $5.000
CONSTRUCTING DETOURS
SY 5,680.000 $70.000 $55.000 $47.000 $66.000 $40.000
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
LF 5,010.000 $20.000 $12.500 $30.000 $65.000 $55.000
PORT CTB (MOVE)(F-SHAPE)(TY 1)
LF 8,010.000 $10.000 $6.500 $6.000 $6.000 $20.000
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
LF 5,010.000 $10.000 $6.000 $8.000 $16.000 $20.000
RUMBLE STRIPS (SHOULDER)
LF 109,824.000 $0.250 $0.120 $0.100 $0.130 $0.500
MTL W-BEAM GD FEN (TIM POST)
LF 7,575.000 $22.500 $18.000 $20.000 $20.000 $23.500
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 26.000 $1,500.000 $1,500.000 $1,450.000 $1,600.000 $1,850.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 21.000 $650.000 $950.000 $1,020.000 $1,100.000 $1,850.000
REMOVE METAL BEAM GUARD FENCE
LF 14,507.500 $3.250 $2.500 $2.000 $3.000 $3.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 19.000 $260.000 $225.000 $180.000 $250.000 $500.000
GUARDRAIL END TREATMENT (REMOVE)
EA 44.000 $225.000 $275.000 $285.000 $300.000 $1,500.000
GDRAIL END TRT(INST)(WOOD POST)(TY I)
EA 23.000 $2,400.000 $2,125.000 $2,600.000 $2,500.000 $2,850.000
CRASH CUSH ATTEN (INSTL)
EA 4.000 $11,000.000 $8,475.000 $8,100.000 $12,000.000 $15,000.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 14.000 $1,500.000 $1,500.000 $1,550.000 $2,500.000 $5,000.000
CRASH CUSH ATTEN (REMOVE)
EA 4.000 $300.000 $900.000 $1,800.000 $2,500.000 $2,500.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 3.000 $325.000 $350.000 $365.000 $560.000 $650.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 76.000 $15.000 $20.000 $26.000 $30.000 $100.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BR)
EA 131.000 $25.000 $25.000 $29.000 $30.000 $100.000
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 101,261.000 $0.300 $0.250 $0.260 $0.280 $0.330
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
LF 35,849.000 $0.450 $0.300 $0.310 $0.320 $0.390
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 22,022.000 $0.800 $0.350 $0.360 $0.370 $0.460
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 111,766.000 $0.300 $0.250 $0.260 $0.270 $0.330
WK ZN PAV MRK REMOV (W)4"(BRK)
LF 5,606.000 $1.000 $1.000 $1.020 $1.070 $1.300
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 22,308.000 $0.650 $1.000 $1.020 $1.070 $1.300
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 22,368.000 $0.650 $1.000 $1.020 $1.070 $1.300
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 39,763.000 $1.000 $0.750 $1.020 $0.500 $2.000
WK ZN PAV MRK SHT TERM (TAB)TY Y
EA 29,381.000 $1.000 $0.700 $1.020 $0.500 $2.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 23,871.000 $1.250 $0.850 $0.860 $0.900 $1.090
REFL PAV MRK TY I (W)12"(LNDP)(100MIL)
LF 49.000 $2.150 $5.000 $5.100 $5.350 $6.500
PAVEMENT SEALER 4"
LF 35,019.000 $0.120 $0.120 $0.120 $0.130 $0.160
PAVEMENT SEALER 6"
LF 4,736.000 $0.160 $0.200 $0.180 $0.190 $0.230
PAVEMENT SEALER 8"
LF 12,860.000 $0.320 $0.250 $0.250 $0.270 $0.330
PAVEMENT SEALER 12"
LF 49.000 $0.950 $3.000 $3.000 $3.210 $3.900
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 72,259.000 $0.380 $0.400 $0.390 $0.410 $0.490
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 18,485.000 $0.650 $0.550 $0.560 $0.580 $0.700
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 73,448.000 $0.400 $0.400 $0.400 $0.410 $0.490
REFL PAV MRKR TY II-C-R
EA 926.000 $4.500 $3.800 $4.000 $4.070 $4.940
ELIM EXT PAV MRK & MRKS (4")
LF 35,019.000 $0.420 $0.460 $0.470 $0.490 $0.600
ELIM EXT PAV MRK & MRKS (6")
LF 4,736.000 $0.750 $0.600 $0.620 $0.640 $0.780
ELIM EXT PAV MRK & MRKS (8")
LF 12,860.000 $0.700 $0.700 $0.720 $0.750 $0.910
ELIM EXT PAV MRK & MRKS (12")
LF 49.000 $1.750 $2.000 $2.050 $2.140 $2.600
PAV SURF PREP FOR MRK (4")
LF 35,019.000 $0.080 $0.050 $0.050 $0.050 $0.070
PAV SURF PREP FOR MRK (6")
LF 4,736.000 $0.100 $0.050 $0.050 $0.050 $0.070
PAV SURF PREP FOR MRK (8")
LF 12,860.000 $0.170 $0.050 $0.050 $0.050 $0.070
PAV SURF PREP FOR MRK (12")
LF 49.000 $0.620 $0.050 $0.050 $0.050 $0.070
FULL - WIDTH MOWING
CYC 3.000 $950.000 $2,900.000 $2,900.000 $2,500.000 $3,500.000
LITTER REMOVAL
CYC 6.000 $1,500.000 $1,250.000 $1,347.000 $3,600.000 $3,500.000
CLEANING / SWEEPING (OUTSIDE MAIN LANE)
CYC 6.000 $1,700.000 $800.000 $1,250.000 $5,000.000 $3,500.000
CAM (ASPHALT) PG(76-22)
TON 654.000 $145.000 $110.000 $108.000 $138.000 $110.000
CAM (AGGREGATE)
TON 8,072.000 $145.000 $110.000 $108.000 $138.000 $95.000
MEMBRANE UNDERSEAL
GAL 49,412.000 $2.400 $2.900 $3.120 $4.000 $6.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $12,000.000 $18,500.000 $7,000.000 $6,000.000 $16,500.000
TMA (STATIONARY)
EA 2.000 $9,000.000 $30,000.000 $13,200.000 $20,000.000 $25,000.000
TMA (MOBILE OPERATION)
HR 480.000 $100.000 $71.000 $33.000 $65.000 $150.000
Totals: $13,537,206.265 $11,432,222.080 $11,590,645.350 $13,792,710.240 $16,442,987.680