PREPARING ROW
|
STA
|
375.510
|
$500.000
|
$630.000
|
$400.000
|
$500.000
|
$4,000.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
297.000
|
$12.000
|
$14.000
|
$18.000
|
$65.000
|
$20.000
|
|
|
REMOVING CONC (FLUME)
|
SY
|
108.000
|
$11.000
|
$21.000
|
$24.000
|
$65.000
|
$20.000
|
|
|
REMOVING STAB BASE & ASPH PAV(14")
|
SY
|
6,495.000
|
$6.000
|
$6.500
|
$6.550
|
$8.000
|
$20.000
|
|
|
REMOVING STAB BASE & ASPH PAV (12")
|
SY
|
5,680.000
|
$5.500
|
$8.000
|
$5.850
|
$7.000
|
$20.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
5,888.000
|
$8.750
|
$18.000
|
$17.000
|
$16.000
|
$20.000
|
|
|
EMBANKMENT (FINAL) (DENS CONT) (TY C2)
|
CY
|
3,553.000
|
$20.000
|
$26.000
|
$24.000
|
$26.000
|
$35.000
|
|
|
BACKFILL (TY A OR B)
|
STA
|
617.550
|
$150.000
|
$80.000
|
$160.000
|
$125.000
|
$250.000
|
|
|
BLADING
|
STA
|
616.510
|
$80.000
|
$47.000
|
$68.000
|
$50.000
|
$300.000
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
122,028.000
|
$1.250
|
$0.700
|
$0.850
|
$1.100
|
$2.250
|
|
|
DRILL SEED (TEMP)(WARM OR COOL)
|
SY
|
122,028.000
|
$0.200
|
$0.120
|
$0.080
|
$0.120
|
$0.500
|
|
|
VEGETATIVE WATERING
|
MG
|
3,906.000
|
$10.000
|
$0.050
|
$0.010
|
$20.000
|
$30.000
|
|
|
SUPERPAVE MIXTURES SP-B PG64-22
|
TON
|
19,700.000
|
$70.000
|
$73.000
|
$73.000
|
$80.000
|
$85.000
|
|
|
SUPERPAVE MIXTURES SP-C SAC-A PG64-22
|
TON
|
21,006.000
|
$90.000
|
$82.000
|
$85.500
|
$86.000
|
$90.000
|
|
|
SUPERPAVE MIXTURES SP-C SAC-B PG64-22
|
TON
|
13,088.000
|
$85.000
|
$70.000
|
$72.500
|
$81.000
|
$90.000
|
|
|
PLAN & TEXT ASPH CONC PAV(0" TO 4")
|
SY
|
5,680.000
|
$4.000
|
$1.950
|
$1.550
|
$2.900
|
$10.000
|
|
|
PLAN & TEXT ASPH CONC PAV(0" TO 6")
|
SY
|
245,360.000
|
$7.000
|
$1.700
|
$1.300
|
$3.000
|
$2.750
|
|
|
PLANE ASPH CONC PAV (3")
|
SY
|
9,245.000
|
$2.750
|
$2.200
|
$2.000
|
$2.300
|
$10.000
|
|
|
PAV JT UNDERSEAL (24")
|
LF
|
736.000
|
$40.000
|
$36.000
|
$33.000
|
$35.000
|
$100.000
|
|
|
FULL-DEPTH REPAIR CPCD (9") HES
|
SY
|
3,000.000
|
$175.000
|
$152.000
|
$165.000
|
$230.000
|
$200.000
|
|
|
DRILL SHAFT (18 IN)
|
LF
|
8,694.000
|
$73.000
|
$55.000
|
$90.000
|
$86.000
|
$68.000
|
|
|
CL C CONC (RAIL FOUNDATION)(HPC)
|
CY
|
1,470.000
|
$425.000
|
$625.000
|
$600.000
|
$460.000
|
$400.000
|
|
|
CONC STR REPAIR(DECK REP (FULL DEPTH))
|
SF
|
240.000
|
$200.000
|
$350.000
|
$385.000
|
$30.000
|
$450.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
49.000
|
$400.000
|
$470.000
|
$535.000
|
$980.000
|
$550.000
|
|
|
RIPRAP (CONC)(FLUME)
|
CY
|
21.000
|
$400.000
|
$700.000
|
$535.000
|
$550.000
|
$550.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
163.200
|
$475.000
|
$550.000
|
$485.000
|
$580.000
|
$550.000
|
|
|
CLEANING AND SEALING EXISTING JOINTS
|
LF
|
308.000
|
$4.500
|
$37.000
|
$45.000
|
$48.000
|
$100.000
|
|
|
RAIL (TY T551)
|
LF
|
6,615.000
|
$45.000
|
$45.000
|
$56.000
|
$78.000
|
$86.000
|
|
|
RETROFIT RAIL (TY T631)
|
LF
|
1,620.000
|
$200.000
|
$65.000
|
$62.000
|
$80.000
|
$165.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$915,000.000
|
$1,150,000.000
|
$851,625.000
|
$1,300,000.000
|
$1,500,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
11.000
|
$11,000.000
|
$4,500.000
|
$17,000.000
|
$24,000.000
|
$8,500.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
260.000
|
$26.000
|
$22.000
|
$21.500
|
$35.000
|
$30.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
260.000
|
$8.000
|
$7.000
|
$12.000
|
$4.000
|
$20.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
1,000.000
|
$2.050
|
$3.000
|
$3.000
|
$6.000
|
$4.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
1,000.000
|
$0.650
|
$0.500
|
$1.000
|
$2.000
|
$2.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
14,646.000
|
$4.250
|
$3.000
|
$2.200
|
$3.500
|
$12.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
14,646.000
|
$0.850
|
$0.800
|
$0.500
|
$1.000
|
$5.000
|
|
|
CONSTRUCTING DETOURS
|
SY
|
5,680.000
|
$70.000
|
$55.000
|
$47.000
|
$66.000
|
$40.000
|
|
|
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
|
LF
|
5,010.000
|
$20.000
|
$12.500
|
$30.000
|
$65.000
|
$55.000
|
|
|
PORT CTB (MOVE)(F-SHAPE)(TY 1)
|
LF
|
8,010.000
|
$10.000
|
$6.500
|
$6.000
|
$6.000
|
$20.000
|
|
|
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
|
LF
|
5,010.000
|
$10.000
|
$6.000
|
$8.000
|
$16.000
|
$20.000
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
109,824.000
|
$0.250
|
$0.120
|
$0.100
|
$0.130
|
$0.500
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
7,575.000
|
$22.500
|
$18.000
|
$20.000
|
$20.000
|
$23.500
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
26.000
|
$1,500.000
|
$1,500.000
|
$1,450.000
|
$1,600.000
|
$1,850.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
21.000
|
$650.000
|
$950.000
|
$1,020.000
|
$1,100.000
|
$1,850.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
14,507.500
|
$3.250
|
$2.500
|
$2.000
|
$3.000
|
$3.000
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
19.000
|
$260.000
|
$225.000
|
$180.000
|
$250.000
|
$500.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
44.000
|
$225.000
|
$275.000
|
$285.000
|
$300.000
|
$1,500.000
|
|
|
GDRAIL END TRT(INST)(WOOD POST)(TY I)
|
EA
|
23.000
|
$2,400.000
|
$2,125.000
|
$2,600.000
|
$2,500.000
|
$2,850.000
|
|
|
CRASH CUSH ATTEN (INSTL)
|
EA
|
4.000
|
$11,000.000
|
$8,475.000
|
$8,100.000
|
$12,000.000
|
$15,000.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
14.000
|
$1,500.000
|
$1,500.000
|
$1,550.000
|
$2,500.000
|
$5,000.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
4.000
|
$300.000
|
$900.000
|
$1,800.000
|
$2,500.000
|
$2,500.000
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
3.000
|
$325.000
|
$350.000
|
$365.000
|
$560.000
|
$650.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
|
EA
|
76.000
|
$15.000
|
$20.000
|
$26.000
|
$30.000
|
$100.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BR)
|
EA
|
131.000
|
$25.000
|
$25.000
|
$29.000
|
$30.000
|
$100.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
101,261.000
|
$0.300
|
$0.250
|
$0.260
|
$0.280
|
$0.330
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
|
LF
|
35,849.000
|
$0.450
|
$0.300
|
$0.310
|
$0.320
|
$0.390
|
|
|
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
|
LF
|
22,022.000
|
$0.800
|
$0.350
|
$0.360
|
$0.370
|
$0.460
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
111,766.000
|
$0.300
|
$0.250
|
$0.260
|
$0.270
|
$0.330
|
|
|
WK ZN PAV MRK REMOV (W)4"(BRK)
|
LF
|
5,606.000
|
$1.000
|
$1.000
|
$1.020
|
$1.070
|
$1.300
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
22,308.000
|
$0.650
|
$1.000
|
$1.020
|
$1.070
|
$1.300
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
22,368.000
|
$0.650
|
$1.000
|
$1.020
|
$1.070
|
$1.300
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
39,763.000
|
$1.000
|
$0.750
|
$1.020
|
$0.500
|
$2.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y
|
EA
|
29,381.000
|
$1.000
|
$0.700
|
$1.020
|
$0.500
|
$2.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
23,871.000
|
$1.250
|
$0.850
|
$0.860
|
$0.900
|
$1.090
|
|
REFL PAV MRK TY I (W)12"(LNDP)(100MIL)
|
LF
|
49.000
|
$2.150
|
$5.000
|
$5.100
|
$5.350
|
$6.500
|
|
|
PAVEMENT SEALER 4"
|
LF
|
35,019.000
|
$0.120
|
$0.120
|
$0.120
|
$0.130
|
$0.160
|
|
|
PAVEMENT SEALER 6"
|
LF
|
4,736.000
|
$0.160
|
$0.200
|
$0.180
|
$0.190
|
$0.230
|
|
|
PAVEMENT SEALER 8"
|
LF
|
12,860.000
|
$0.320
|
$0.250
|
$0.250
|
$0.270
|
$0.330
|
|
|
PAVEMENT SEALER 12"
|
LF
|
49.000
|
$0.950
|
$3.000
|
$3.000
|
$3.210
|
$3.900
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
72,259.000
|
$0.380
|
$0.400
|
$0.390
|
$0.410
|
$0.490
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
|
LF
|
18,485.000
|
$0.650
|
$0.550
|
$0.560
|
$0.580
|
$0.700
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
73,448.000
|
$0.400
|
$0.400
|
$0.400
|
$0.410
|
$0.490
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
926.000
|
$4.500
|
$3.800
|
$4.000
|
$4.070
|
$4.940
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
35,019.000
|
$0.420
|
$0.460
|
$0.470
|
$0.490
|
$0.600
|
|
|
ELIM EXT PAV MRK & MRKS (6")
|
LF
|
4,736.000
|
$0.750
|
$0.600
|
$0.620
|
$0.640
|
$0.780
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
12,860.000
|
$0.700
|
$0.700
|
$0.720
|
$0.750
|
$0.910
|
|
|
ELIM EXT PAV MRK & MRKS (12")
|
LF
|
49.000
|
$1.750
|
$2.000
|
$2.050
|
$2.140
|
$2.600
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
35,019.000
|
$0.080
|
$0.050
|
$0.050
|
$0.050
|
$0.070
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
4,736.000
|
$0.100
|
$0.050
|
$0.050
|
$0.050
|
$0.070
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
12,860.000
|
$0.170
|
$0.050
|
$0.050
|
$0.050
|
$0.070
|
|
|
PAV SURF PREP FOR MRK (12")
|
LF
|
49.000
|
$0.620
|
$0.050
|
$0.050
|
$0.050
|
$0.070
|
|
|
FULL - WIDTH MOWING
|
CYC
|
3.000
|
$950.000
|
$2,900.000
|
$2,900.000
|
$2,500.000
|
$3,500.000
|
|
|
LITTER REMOVAL
|
CYC
|
6.000
|
$1,500.000
|
$1,250.000
|
$1,347.000
|
$3,600.000
|
$3,500.000
|
|
|
CLEANING / SWEEPING (OUTSIDE MAIN LANE)
|
CYC
|
6.000
|
$1,700.000
|
$800.000
|
$1,250.000
|
$5,000.000
|
$3,500.000
|
|
|
CAM (ASPHALT) PG(76-22)
|
TON
|
654.000
|
$145.000
|
$110.000
|
$108.000
|
$138.000
|
$110.000
|
|
|
CAM (AGGREGATE)
|
TON
|
8,072.000
|
$145.000
|
$110.000
|
$108.000
|
$138.000
|
$95.000
|
|
|
MEMBRANE UNDERSEAL
|
GAL
|
49,412.000
|
$2.400
|
$2.900
|
$3.120
|
$4.000
|
$6.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
4.000
|
$12,000.000
|
$18,500.000
|
$7,000.000
|
$6,000.000
|
$16,500.000
|
|
|
TMA (STATIONARY)
|
EA
|
2.000
|
$9,000.000
|
$30,000.000
|
$13,200.000
|
$20,000.000
|
$25,000.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
480.000
|
$100.000
|
$71.000
|
$33.000
|
$65.000
|
$150.000
|
|
Totals: |
$13,537,206.265
|
$11,432,222.080
|
$11,590,645.350
|
$13,792,710.240
|
$16,442,987.680
|