Job Info for 0197-02-121

County: DALLAS Highway: US 175 Date: 06/05/2018 (6 years ago) Engineer's Estimate: $13,537,206 Control Number: 0197-02-121
Project: C 197-2-121 District: DALLAS Time: 225 WORKING DAYS Type: SLOPE FAILURE REPAIRS

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $13,537,206.26
AUSTIN BRIDGE & ROAD SERVICES, LP   $11,432,222.08 1
-15.55% | -$2,104,984.18
OLDCASTLE MATERIALS TEXAS, INC.   $11,590,645.35 2
-14.38% | -$1,946,560.91
1.39% | $158,423.27
A. L. HELMCAMP, INC.   $13,792,710.24 3
1.89% | $255,503.98
20.65% | $2,360,488.16
19.00% | $2,202,064.89
FNH CONSTRUCTION, LLC   $16,442,987.68 4
21.47% | $2,905,781.42
43.83% | $5,010,765.60
19.22% | $2,650,277.44

Bid Items

Items: 91, 0 filtered
DALLAS US 175  |  DALLAS  |  0197-02-121  |  06/05/2018  |  $13,537,206  |  C 197-2-121  |  SLOPE FAILURE REPAIRS  |  225 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate AUSTIN BRIDGE & ROAD SERVICES, LP OLDCASTLE MATERIALS TEXAS, INC. A. L. HELMCAMP, INC. FNH CONSTRUCTION, LLC
100 6002 PREPARING ROW STA 375.510 $500.000 $630.000 $400.000 $500.000 $4,000.000
104 6009 REMOVING CONC (RIPRAP) SY 297.000 $12.000 $14.000 $18.000 $65.000 $20.000
104 6044 REMOVING CONC (FLUME) SY 108.000 $11.000 $21.000 $24.000 $65.000 $20.000
105 6019 REMOVING STAB BASE & ASPH PAV(14") SY 6,495.000 $6.000 $6.500 $6.550 $8.000 $20.000
105 6020 REMOVING STAB BASE & ASPH PAV (12") SY 5,680.000 $5.500 $8.000 $5.850 $7.000 $20.000
110 6001 EXCAVATION (ROADWAY) CY 5,888.000 $8.750 $18.000 $17.000 $16.000 $20.000
132 6026 EMBANKMENT (FINAL) (DENS CONT) (TY C2) CY 3,553.000 $20.000 $26.000 $24.000 $26.000 $35.000
134 6004 BACKFILL (TY A OR B) STA 617.550 $150.000 $80.000 $160.000 $125.000 $250.000
150 6001 BLADING STA 616.510 $80.000 $47.000 $68.000 $50.000 $300.000
161 6017 COMPOST MANUF TOPSOIL (4") SY 122,028.000 $1.250 $0.700 $0.850 $1.100 $2.250
164 6051 DRILL SEED (TEMP)(WARM OR COOL) SY 122,028.000 $0.200 $0.120 $0.080 $0.120 $0.500
168 6001 VEGETATIVE WATERING MG 3,906.000 $10.000 $0.050 $0.010 $20.000 $30.000
344 6011 SUPERPAVE MIXTURES SP-B PG64-22 TON 19,700.000 $70.000 $73.000 $73.000 $80.000 $85.000
344 6031 SUPERPAVE MIXTURES SP-C SAC-A PG64-22 TON 21,006.000 $90.000 $82.000 $85.500 $86.000 $90.000
344 6032 SUPERPAVE MIXTURES SP-C SAC-B PG64-22 TON 13,088.000 $85.000 $70.000 $72.500 $81.000 $90.000
354 6004 PLAN & TEXT ASPH CONC PAV(0" TO 4") SY 5,680.000 $4.000 $1.950 $1.550 $2.900 $10.000
354 6010 PLAN & TEXT ASPH CONC PAV(0" TO 6") SY 245,360.000 $7.000 $1.700 $1.300 $3.000 $2.750
354 6048 PLANE ASPH CONC PAV (3") SY 9,245.000 $2.750 $2.200 $2.000 $2.300 $10.000
356 6021 PAV JT UNDERSEAL (24") LF 736.000 $40.000 $36.000 $33.000 $35.000 $100.000
361 6075 FULL-DEPTH REPAIR CPCD (9") HES SY 3,000.000 $175.000 $152.000 $165.000 $230.000 $200.000
416 6001 DRILL SHAFT (18 IN) LF 8,694.000 $73.000 $55.000 $90.000 $86.000 $68.000
420 6135 CL C CONC (RAIL FOUNDATION)(HPC) CY 1,470.000 $425.000 $625.000 $600.000 $460.000 $400.000
429 6005 CONC STR REPAIR(DECK REP (FULL DEPTH)) SF 240.000 $200.000 $350.000 $385.000 $30.000 $450.000
432 6001 RIPRAP (CONC)(4 IN) CY 49.000 $400.000 $470.000 $535.000 $980.000 $550.000
432 6044 RIPRAP (CONC)(FLUME) CY 21.000 $400.000 $700.000 $535.000 $550.000 $550.000
432 6045 RIPRAP (MOW STRIP)(4 IN) CY 163.200 $475.000 $550.000 $485.000 $580.000 $550.000
438 6001 CLEANING AND SEALING EXISTING JOINTS LF 308.000 $4.500 $37.000 $45.000 $48.000 $100.000
450 6014 RAIL (TY T551) LF 6,615.000 $45.000 $45.000 $56.000 $78.000 $86.000
451 6019 RETROFIT RAIL (TY T631) LF 1,620.000 $200.000 $65.000 $62.000 $80.000 $165.000
500 6001 MOBILIZATION LS 1.000 $915,000.000 $1,150,000.000 $851,625.000 $1,300,000.000 $1,500,000.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 11.000 $11,000.000 $4,500.000 $17,000.000 $24,000.000 $8,500.000
506 6001 ROCK FILTER DAMS (INSTALL) (TY 1) LF 260.000 $26.000 $22.000 $21.500 $35.000 $30.000
506 6011 ROCK FILTER DAMS (REMOVE) LF 260.000 $8.000 $7.000 $12.000 $4.000 $20.000
506 6038 TEMP SEDMT CONT FENCE (INSTALL) LF 1,000.000 $2.050 $3.000 $3.000 $6.000 $4.000
506 6039 TEMP SEDMT CONT FENCE (REMOVE) LF 1,000.000 $0.650 $0.500 $1.000 $2.000 $2.000
506 6041 BIODEG EROSN CONT LOGS (INSTL) (12") LF 14,646.000 $4.250 $3.000 $2.200 $3.500 $12.000
506 6043 BIODEG EROSN CONT LOGS (REMOVE) LF 14,646.000 $0.850 $0.800 $0.500 $1.000 $5.000
508 6001 CONSTRUCTING DETOURS SY 5,680.000 $70.000 $55.000 $47.000 $66.000 $40.000
512 6005 PORT CTB (FUR & INST)(F-SHAPE)(TY 1) LF 5,010.000 $20.000 $12.500 $30.000 $65.000 $55.000
512 6029 PORT CTB (MOVE)(F-SHAPE)(TY 1) LF 8,010.000 $10.000 $6.500 $6.000 $6.000 $20.000
512 6053 PORT CTB (REMOVE)(F-SHAPE)(TY 1) LF 5,010.000 $10.000 $6.000 $8.000 $16.000 $20.000
533 6001 RUMBLE STRIPS (SHOULDER) LF 109,824.000 $0.250 $0.120 $0.100 $0.130 $0.500
540 6001 MTL W-BEAM GD FEN (TIM POST) LF 7,575.000 $22.500 $18.000 $20.000 $20.000 $23.500
540 6006 MTL BEAM GD FEN TRANS (THRIE-BEAM) EA 26.000 $1,500.000 $1,500.000 $1,450.000 $1,600.000 $1,850.000
540 6016 DOWNSTREAM ANCHOR TERMINAL SECTION EA 21.000 $650.000 $950.000 $1,020.000 $1,100.000 $1,850.000
542 6001 REMOVE METAL BEAM GUARD FENCE LF 14,507.500 $3.250 $2.500 $2.000 $3.000 $3.000
542 6004 RM MTL BM GD FENCE TRANS (THRIE-BEAM) EA 19.000 $260.000 $225.000 $180.000 $250.000 $500.000
544 6003 GUARDRAIL END TREATMENT (REMOVE) EA 44.000 $225.000 $275.000 $285.000 $300.000 $1,500.000
544 6004 GDRAIL END TRT(INST)(WOOD POST)(TY I) EA 23.000 $2,400.000 $2,125.000 $2,600.000 $2,500.000 $2,850.000
545 6001 CRASH CUSH ATTEN (INSTL) EA 4.000 $11,000.000 $8,475.000 $8,100.000 $12,000.000 $15,000.000
545 6003 CRASH CUSH ATTEN (MOVE & RESET) EA 14.000 $1,500.000 $1,500.000 $1,550.000 $2,500.000 $5,000.000
545 6005 CRASH CUSH ATTEN (REMOVE) EA 4.000 $300.000 $900.000 $1,800.000 $2,500.000 $2,500.000
644 6068 RELOCATE SM RD SN SUP&AM TY 10BWG EA 3.000 $325.000 $350.000 $365.000 $560.000 $650.000
658 6013 INSTL DEL ASSM (D-SW)SZ (BRF)CTB EA 76.000 $15.000 $20.000 $26.000 $30.000 $100.000
658 6063 INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BR) EA 131.000 $25.000 $25.000 $29.000 $30.000 $100.000
662 6004 WK ZN PAV MRK NON-REMOV (W)4"(SLD) LF 101,261.000 $0.300 $0.250 $0.260 $0.280 $0.330
662 6005 WK ZN PAV MRK NON-REMOV (W)6"(BRK) LF 35,849.000 $0.450 $0.300 $0.310 $0.320 $0.390
662 6012 WK ZN PAV MRK NON-REMOV (W)8"(SLD) LF 22,022.000 $0.800 $0.350 $0.360 $0.370 $0.460
662 6034 WK ZN PAV MRK NON-REMOV (Y)4"(SLD) LF 111,766.000 $0.300 $0.250 $0.260 $0.270 $0.330
662 6060 WK ZN PAV MRK REMOV (W)4"(BRK) LF 5,606.000 $1.000 $1.000 $1.020 $1.070 $1.300
662 6063 WK ZN PAV MRK REMOV (W)4"(SLD) LF 22,308.000 $0.650 $1.000 $1.020 $1.070 $1.300
662 6095 WK ZN PAV MRK REMOV (Y)4"(SLD) LF 22,368.000 $0.650 $1.000 $1.020 $1.070 $1.300
662 6109 WK ZN PAV MRK SHT TERM (TAB)TY W EA 39,763.000 $1.000 $0.750 $1.020 $0.500 $2.000
662 6110 WK ZN PAV MRK SHT TERM (TAB)TY Y EA 29,381.000 $1.000 $0.700 $1.020 $0.500 $2.000
666 6036 REFL PAV MRK TY I (W)8"(SLD)(100MIL) LF 23,871.000 $1.250 $0.850 $0.860 $0.900 $1.090
666 6039 REFL PAV MRK TY I (W)12"(LNDP)(100MIL) LF 49.000 $2.150 $5.000 $5.100 $5.350 $6.500
666 6224 PAVEMENT SEALER 4" LF 35,019.000 $0.120 $0.120 $0.120 $0.130 $0.160
666 6225 PAVEMENT SEALER 6" LF 4,736.000 $0.160 $0.200 $0.180 $0.190 $0.230
666 6226 PAVEMENT SEALER 8" LF 12,860.000 $0.320 $0.250 $0.250 $0.270 $0.330
666 6228 PAVEMENT SEALER 12" LF 49.000 $0.950 $3.000 $3.000 $3.210 $3.900
666 6303 RE PM W/RET REQ TY I (W)4"(SLD)(100MIL) LF 72,259.000 $0.380 $0.400 $0.390 $0.410 $0.490
666 6306 RE PM W/RET REQ TY I (W)6"(BRK)(100MIL) LF 18,485.000 $0.650 $0.550 $0.560 $0.580 $0.700
666 6315 RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL) LF 73,448.000 $0.400 $0.400 $0.400 $0.410 $0.490
672 6010 REFL PAV MRKR TY II-C-R EA 926.000 $4.500 $3.800 $4.000 $4.070 $4.940
677 6001 ELIM EXT PAV MRK & MRKS (4") LF 35,019.000 $0.420 $0.460 $0.470 $0.490 $0.600
677 6002 ELIM EXT PAV MRK & MRKS (6") LF 4,736.000 $0.750 $0.600 $0.620 $0.640 $0.780
677 6003 ELIM EXT PAV MRK & MRKS (8") LF 12,860.000 $0.700 $0.700 $0.720 $0.750 $0.910
677 6005 ELIM EXT PAV MRK & MRKS (12") LF 49.000 $1.750 $2.000 $2.050 $2.140 $2.600
678 6001 PAV SURF PREP FOR MRK (4") LF 35,019.000 $0.080 $0.050 $0.050 $0.050 $0.070
678 6002 PAV SURF PREP FOR MRK (6") LF 4,736.000 $0.100 $0.050 $0.050 $0.050 $0.070
678 6004 PAV SURF PREP FOR MRK (8") LF 12,860.000 $0.170 $0.050 $0.050 $0.050 $0.070
678 6006 PAV SURF PREP FOR MRK (12") LF 49.000 $0.620 $0.050 $0.050 $0.050 $0.070
730 6107 FULL - WIDTH MOWING CYC 3.000 $950.000 $2,900.000 $2,900.000 $2,500.000 $3,500.000
734 6002 LITTER REMOVAL CYC 6.000 $1,500.000 $1,250.000 $1,347.000 $3,600.000 $3,500.000
738 6003 CLEANING / SWEEPING (OUTSIDE MAIN LANE) CYC 6.000 $1,700.000 $800.000 $1,250.000 $5,000.000 $3,500.000
3000 6003 CAM (ASPHALT) PG(76-22) TON 654.000 $145.000 $110.000 $108.000 $138.000 $110.000
3000 6004 CAM (AGGREGATE) TON 8,072.000 $145.000 $110.000 $108.000 $138.000 $95.000
3002 6001 MEMBRANE UNDERSEAL GAL 49,412.000 $2.400 $2.900 $3.120 $4.000 $6.000
6001 6002 PORTABLE CHANGEABLE MESSAGE SIGN EA 4.000 $12,000.000 $18,500.000 $7,000.000 $6,000.000 $16,500.000
6185 6001 TMA (STATIONARY) EA 2.000 $9,000.000 $30,000.000 $13,200.000 $20,000.000 $25,000.000
6185 6003 TMA (MOBILE OPERATION) HR 480.000 $100.000 $71.000 $33.000 $65.000 $150.000
Totals: $13,537,206.27 $11,432,222.08 $11,590,645.35 $13,792,710.24 $16,442,987.68