DALLAS IH 35E (0196-03-276)

Items: 81

County: DALLAS
Length: N/A
Highway: IH 35E
District: DALLAS
Control Number: 0196-03-276
DBE Goal: N/A
Project: NH 2018(578)
Guaranty: N/A
Time: 252 WORKING DAYS
Engineer's Estimate: $4,465,955.70
Date: 03/06/2018 (8 years ago)
Contract Number: N/A
Type: SLOPE FAILURE REPAIR
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (7)
E
Engineer's Estimate
$4,465,955.70
$6,021,376.81
Over/Under Est: 34.83% $1,555,421.11
Over/Under Est: 39% $1,741,574.10
Amt Left: 3.09% $186,152.99
Over/Under Est: 42.89% $1,915,560.80
Amt Left: 5.98% $360,139.69
Delta: -2.80% -$173,986.70
$6,530,824.25
Over/Under Est: 46.24% $2,064,868.55
Amt Left: 8.46% $509,447.44
Delta: -2.34% -$149,307.75
Over/Under Est: 46.66% $2,083,739.44
Amt Left: 8.77% $528,318.33
Delta: -0.29% -$18,870.89
Over/Under Est: 48.37% $2,160,310.30
Amt Left: 10.05% $604,889.19
Delta: -1.17% -$76,570.86
Over/Under Est: 77.29% $3,451,811.91
Amt Left: 31.49% $1,896,390.80
Delta: -19.49% -$1,291,501.61

Bid Items & Bid Tabulations

81 Total 0 of 81
DALLAS  |  IH 35E  |  DALLAS  |  0196-03-276  |  03/06/2018  |  $4,465,955.70  |  NH 2018(578)  |  SLOPE FAILURE REPAIR  |  252 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ALTUS CONSTRUCTION LLC
SEMA CONSTRUCTION, INC.
RAGLE CONSTRUCTION, INC.
FNH CONSTRUCTION, LLC
ED BELL CONSTRUCTION COMPANY
IOWA BRIDGE & CULVERT, LC
AUSTIN BRIDGE & ROAD SERVICES, LP
PREPARING ROW
STA 49.000 $2,000.000 $715.400 $12,650.000 $12,800.000 $8,500.000 $2,100.000 $6,000.000 $3,000.000
REMOVING CONC (RIPRAP)
SY 250.000 $12.000 $11.710 $7.000 $6.000 $20.000 $15.000 $10.000 $74.910
REMOVING CONC (CURB)
LF 2,259.000 $6.000 $5.090 $4.000 $4.000 $12.500 $10.000 $6.000 $25.090
REMOVING CONC (CTB)
LF 657.000 $10.000 $12.720 $8.000 $17.000 $25.000 $10.000 $40.000 $30.170
REMOVING CONC (FLUME)
SY 1,269.000 $10.000 $15.710 $9.500 $7.000 $20.000 $15.000 $22.000 $22.650
REMOVING STAB BASE & ASPH PAV (10"-12")
SY 15,669.000 $6.000 $35.610 $13.000 $10.000 $30.000 $31.500 $17.000 $33.870
EXCAVATION (ROADWAY)
CY 7,405.000 $8.000 $9.280 $18.000 $28.000 $20.000 $31.500 $18.000 $68.000
EMBANKMENT (FINAL) (DENS CONT) (TY C1)
CY 1,184.000 $5.500 $8.920 $11.000 $20.000 $30.000 $10.500 $16.000 $27.000
EMBANKMENT (FINAL) (DENS CONT) (TY C2)
CY 16,231.000 $10.000 $6.610 $24.000 $12.200 $25.000 $25.200 $42.000 $51.000
COMPOST MANUF TOPSOIL (4")
SY 5,642.000 $1.200 $1.440 $2.250 $2.150 $4.500 $8.400 $3.000 $7.860
BLOCK SODDING
SY 5,642.000 $5.000 $6.590 $5.000 $5.150 $5.500 $12.600 $4.000 $3.900
VEGETATIVE WATERING
MG 210.000 $22.000 $69.250 $51.000 $25.000 $50.000 $210.000 $36.000 $85.770
SUPERPAVE MIXTURES SP-C SAC-B PG64-22
TON 10,193.000 $75.000 $162.270 $85.000 $90.000 $87.500 $86.000 $78.000 $110.000
CEM STABIL BKFL
CY 23.000 $71.000 $169.180 $160.000 $105.000 $250.000 $168.000 $300.000 $728.950
FLOWABLE BACKFILL
CY 56.000 $140.000 $180.440 $190.000 $175.000 $350.000 $210.000 $300.000 $398.490
TEMPORARY SPL SHORING
SF 2,466.000 $20.000 $27.030 $35.000 $21.000 $42.000 $22.000 $22.000 $20.180
DRILL SHAFT (SIGN MTS) (24 IN)
LF 35.000 $150.000 $231.170 $175.000 $150.000 $125.000 $152.250 $200.000 $170.000
RETAINING WALL (CONC BLOCK)
SF 176.000 $34.000 $47.580 $28.000 $35.000 $55.000 $31.500 $55.000 $60.210
RETAINING WALL (SPREAD FOOTING)
SF 3,730.000 $50.000 $46.290 $42.000 $55.000 $55.000 $73.500 $69.000 $114.000
RIPRAP (CONC)(4 IN)
CY 2,840.000 $380.000 $305.140 $350.000 $440.000 $350.000 $390.000 $400.000 $333.880
RIPRAP (CONC)(FLUME)
CY 322.000 $400.000 $364.170 $450.000 $440.000 $400.000 $525.000 $420.000 $390.440
RIPRAP (MOW STRIP)(4 IN)
CY 268.000 $400.000 $381.070 $480.000 $465.000 $400.000 $525.000 $430.000 $420.240
RETROFIT RAIL (TY C221)
LF 160.000 $125.000 $54.750 $140.000 $205.000 $185.000 $315.000 $75.000 $416.350
RC PIPE (CL IV)(18 IN)
LF 33.000 $65.000 $132.570 $125.000 $110.000 $85.000 $210.000 $100.000 $313.140
INLET (COMPL)(RWI)(TY II)
EA 1.000 $5,000.000 $5,714.010 $6,000.000 $4,300.000 $5,000.000 $8,400.000 $2,500.000 $11,408.170
ADJUSTING INLETS
EA 15.000 $600.000 $1,651.460 $1,600.000 $1,000.000 $1,500.000 $2,100.000 $1,500.000 $6,064.990
REMOV STR (PIPE)
LF 20.000 $14.000 $56.570 $50.000 $12.000 $30.000 $31.500 $25.000 $39.140
MOBILIZATION
LS 1.000 $400,000.000 $588,877.980 $620,000.000 $635,000.000 $600,000.000 $632,000.000 $680,000.000 $791,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 12.000 $8,000.000 $9,293.190 $41,546.000 $50,000.000 $8,500.000 $42,000.000 $12,000.000 $37,700.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 7,049.000 $2.500 $3.860 $2.100 $1.550 $4.000 $1.420 $10.000 $2.880
TEMP SEDMT CONT FENCE (REMOVE)
LF 7,049.000 $0.800 $1.110 $1.000 $0.450 $2.000 $0.110 $2.000 $0.400
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 355.000 $4.500 $7.600 $5.100 $3.550 $12.000 $2.630 $4.000 $4.800
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 320.000 $5.500 $10.410 $6.200 $4.750 $16.000 $3.680 $5.000 $5.800
BIODEG EROSN CONT LOGS (REMOVE)
LF 675.000 $1.000 $2.500 $1.000 $0.650 $8.000 $1.050 $2.000 $1.500
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
LF 4,260.000 $20.000 $54.570 $26.000 $35.000 $50.000 $13.650 $35.000 $6.700
PORT CTB (MOVE)(F-SHAPE)(TY 1)
LF 5,820.000 $5.000 $6.560 $7.200 $7.000 $20.000 $8.400 $6.000 $12.000
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
LF 4,260.000 $10.000 $6.710 $7.800 $8.500 $20.000 $7.350 $8.000 $6.000
CONC CURB (TY II)
LF 750.000 $20.000 $16.930 $22.000 $9.000 $35.000 $15.750 $18.000 $15.550
MTL W-BEAM GD FEN (TIM POST)
LF 5,053.000 $18.000 $22.160 $19.000 $18.500 $19.500 $19.430 $20.000 $18.500
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 17.000 $1,500.000 $2,198.160 $1,300.000 $1,825.000 $1,800.000 $2,183.330 $2,000.000 $1,825.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 8.000 $1,000.000 $1,507.730 $900.000 $1,000.000 $1,500.000 $1,050.000 $1,100.000 $1,000.000
REMOVE METAL BEAM GUARD FENCE
LF 4,631.000 $2.000 $4.060 $3.100 $2.950 $3.000 $3.100 $4.000 $2.950
REMOVE TERMINAL ANCHOR SECTION
EA 10.000 $180.000 $234.210 $210.000 $150.000 $500.000 $157.500 $165.000 $150.000
GUARDRAIL END TREATMENT (REMOVE)
EA 9.000 $260.000 $306.150 $230.000 $325.000 $1,000.000 $341.250 $375.000 $325.000
GDRAIL END TRT(INST)(WOOD POST)(TY I)
EA 9.000 $2,400.000 $2,543.750 $2,220.000 $2,205.000 $2,500.000 $2,315.250 $2,500.000 $2,205.000
CRASH CUSH ATTEN (INSTL)
EA 5.000 $9,000.000 $11,154.990 $7,800.000 $8,000.000 $6,000.000 $11,550.000 $10,000.000 $8,375.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 3.000 $1,500.000 $1,605.510 $1,100.000 $2,500.000 $5,000.000 $3,150.000 $1,200.000 $1,375.000
CRASH CUSH ATTEN (REMOVE)
EA 5.000 $900.000 $771.410 $650.000 $1,000.000 $2,500.000 $2,100.000 $1,500.000 $750.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 42.000 $300.000 $496.510 $370.000 $500.000 $650.000 $341.250 $400.000 $450.000
INSTALL LRSS (STRUCT STEEL)
LB 1,430.000 $6.000 $7.760 $5.500 $6.000 $8.000 $4.990 $6.000 $5.750
RELOCATE LRSA
EA 2.000 $2,500.000 $4,573.410 $3,850.000 $2,500.000 $2,500.000 $3,675.000 $4,500.000 $3,500.000
INSTL DEL ASSM (D-SW)SZ 1(FLX)GND
EA 40.000 $50.000 $112.950 $92.000 $31.000 $100.000 $47.250 $39.000 $50.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 81.000 $18.000 $40.240 $33.000 $33.000 $100.000 $34.650 $18.000 $33.000
WK ZN PAV MRK REMOV (W)4"(BRK)
LF 9,690.000 $1.000 $0.760 $1.300 $1.250 $0.500 $1.310 $2.000 $1.180
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 13,407.000 $0.700 $0.780 $0.900 $1.250 $0.500 $1.310 $2.000 $0.840
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 15,087.000 $0.700 $0.860 $0.900 $1.250 $0.250 $1.310 $2.000 $0.840
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 2,553.000 $1.000 $1.250 $0.800 $1.000 $2.000 $1.050 $2.000 $0.740
REFL PAV MRK TY I (W)12"(LNDP)(100MIL)
LF 15.000 $2.500 $4.950 $10.200 $5.000 $8.000 $5.250 $10.000 $10.000
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 263.000 $3.500 $6.310 $3.100 $4.000 $8.000 $4.200 $5.000 $3.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 289.000 $5.500 $11.810 $6.400 $5.500 $20.000 $5.780 $6.000 $6.200
PAVEMENT SEALER 4"
LF 27,696.000 $0.250 $0.280 $0.190 $0.150 $0.500 $0.160 $1.000 $0.180
PAVEMENT SEALER 6"
LF 9,720.000 $0.300 $0.260 $0.250 $0.500 $0.500 $0.530 $1.000 $0.240
PAVEMENT SEALER 8"
LF 2,553.000 $0.800 $0.710 $0.350 $0.500 $0.500 $0.530 $1.000 $0.330
PAVEMENT SEALER 12"
LF 278.000 $2.500 $1.920 $0.620 $2.000 $0.500 $2.100 $3.000 $0.600
PAVEMENT SEALER 24"
LF 289.000 $2.500 $3.690 $1.250 $2.000 $0.500 $2.100 $3.000 $1.200
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 12,614.000 $0.400 $0.560 $0.470 $0.600 $0.500 $0.630 $1.000 $0.450
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 9,720.000 $0.600 $1.120 $0.480 $0.600 $0.500 $0.630 $1.000 $0.460
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 15,082.000 $0.400 $0.580 $0.470 $0.600 $0.500 $0.630 $1.000 $0.450
REFL PAV MRKR TY II-C-R
EA 610.000 $4.000 $6.860 $3.700 $3.850 $15.000 $4.040 $5.000 $3.600
ELIM EXT PAV MRK & MRKS (4")
LF 38,184.000 $0.400 $0.680 $0.370 $0.480 $0.500 $0.500 $1.000 $0.360
PAV SURF PREP FOR MRK (4")
LF 27,696.000 $0.100 $0.120 $0.140 $0.040 $0.500 $0.040 $1.000 $0.130
PAV SURF PREP FOR MRK (6")
LF 9,720.000 $0.100 $0.120 $0.170 $0.060 $0.500 $0.060 $1.000 $0.160
PAV SURF PREP FOR MRK (8")
LF 2,553.000 $0.100 $0.360 $0.230 $0.080 $0.500 $0.080 $1.000 $0.220
PAV SURF PREP FOR MRK (12")
LF 278.000 $0.500 $1.280 $0.460 $1.000 $0.500 $1.050 $2.000 $0.440
PAV SURF PREP FOR MRK (24")
LF 289.000 $1.000 $1.660 $0.910 $1.000 $0.500 $1.050 $2.000 $0.880
PAV SURF PREP FOR MRK (RPM)
EA 610.000 $0.500 $2.430 $0.830 $0.250 $150.000 $0.260 $1.000 $0.800
TREE REMOVAL (4" - 12" DIA)
EA 155.000 $50.000 $198.470 $250.000 $370.530 $500.000 $262.500 $500.000 $165.000
INTRLCK ART CONC BLKS (4" MIN)
SF 49,421.000 $10.000 $9.820 $10.000 $8.000 $10.500 $9.450 $14.000 $11.960
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $7,000.000 $10,586.270 $16,000.000 $1,500.000 $16,500.000 $21,000.000 $15,000.000 $42,763.670
COVER (ADJUST)
EA 33.000 $1,400.000 $1,513.840 $250.000 $250.000 $750.000 $1,260.000 $1,250.000 $1,257.180
TMA (STATIONARY)
EA 2.000 $5,000.000 $1,736.300 $24,000.000 $500.000 $8,000.000 $18,000.000 $10,000.000 $76,224.130
Totals: $4,465,955.700 $6,021,376.810 $6,207,529.800 $6,381,516.500 $6,530,824.250 $6,549,695.140 $6,626,266.000 $7,917,767.610