Show Job Controls
Bid Cobra

DALLAS IH 35E (0196-03-262)

Items: 84

County: DALLAS
Length: N/A
Highway: IH 35E
District: DALLAS
Control Number: 0196-03-262
DBE Goal: N/A
Project: NH 2018(582)
Guaranty: N/A
Time: 183 WORKING DAYS
Engineer's Estimate: $4,323,787.17
Date: 03/06/2018 (8 years ago)
Contract Number: N/A
Type: SLOPE FAILURE REPAIR
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (6)
E
Engineer's Estimate
$4,323,787.17
$6,356,006.29
Over/Under Est: 47% $2,032,219.12
Over/Under Est: 49.21% $2,127,812.13
Amt Left: 1.5% $95,593.01
$6,676,669.50
Over/Under Est: 54.42% $2,352,882.33
Amt Left: 5.05% $320,663.21
Delta: -3.49% -$225,070.20
Over/Under Est: 70.08% $3,030,027.83
Amt Left: 15.7% $997,808.71
Delta: -10.14% -$677,145.50
Over/Under Est: 74.6% $3,225,580.68
Amt Left: 18.78% $1,193,361.56
Delta: -2.66% -$195,552.85
Over/Under Est: 76.65% $3,314,201.11
Amt Left: 20.17% $1,281,981.99
Delta: -1.17% -$88,620.43

Bid Items & Bid Tabulations

84 Total 0 of 84
DALLAS  |  IH 35E  |  DALLAS  |  0196-03-262  |  03/06/2018  |  $4,323,787.17  |  NH 2018(582)  |  SLOPE FAILURE REPAIR  |  183 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
SEMA CONSTRUCTION, INC.
RAGLE CONSTRUCTION, INC.
FNH CONSTRUCTION, LLC
IOWA BRIDGE & CULVERT, LC
ED BELL CONSTRUCTION COMPANY
AUSTIN BRIDGE & ROAD SERVICES, LP
PREPARING ROW
STA 51.000 $4,900.000 $11,479.000 $12,000.000 $8,500.000 $7,500.000 $6,300.000 $3,000.000
REMOVING CONC (RIPRAP)
SY 1,681.000 $9.000 $8.500 $4.500 $20.000 $10.000 $15.000 $13.000
REMOVING CONC (CURB)
LF 6,609.000 $4.000 $4.000 $3.500 $12.500 $6.000 $10.000 $12.000
REMOVING CONC (RETAINING WALLS)
SY 10.000 $41.000 $30.000 $65.000 $30.000 $40.000 $250.000 $255.000
REMOVING CONC (FLUME)
SY 993.000 $9.000 $9.500 $7.000 $30.000 $22.000 $15.000 $18.000
REMOVING CONC (MISC)
CY 164.000 $49.000 $50.000 $45.000 $20.000 $100.000 $111.000 $71.000
REMOVING STAB BASE & ASPH PAV (10"-12")
SY 14,300.000 $8.000 $14.500 $10.000 $20.000 $16.000 $28.500 $25.000
EXCAVATION (ROADWAY)
CY 6,416.000 $8.000 $20.000 $26.000 $20.000 $24.000 $31.500 $65.000
EMBANKMENT (FINAL) (DENS CONT) (TY C2)
CY 15,814.000 $3.000 $27.000 $18.000 $25.000 $42.000 $25.200 $65.000
COMPOST MANUF TOPSOIL (4")
SY 2,147.000 $1.000 $2.250 $2.400 $5.500 $4.000 $8.400 $7.000
BLOCK SODDING
SY 2,147.000 $3.000 $4.000 $5.000 $5.500 $5.000 $12.600 $4.300
VEGETATIVE WATERING
MG 53.000 $8.000 $109.000 $25.000 $100.000 $3.000 $210.000 $106.000
SUPERPAVE MIXTURES SP-C SAC-B PG64-22
TON 9,191.000 $75.000 $85.000 $95.000 $87.500 $78.000 $99.000 $95.000
CEM STABIL BKFL
CY 53.000 $71.000 $140.000 $110.000 $250.000 $300.000 $168.000 $375.000
CUT & RESTORING PAV
SY 22.000 $95.000 $115.000 $40.000 $125.000 $150.000 $630.000 $350.000
FLOWABLE BACKFILL
CY 117.000 $140.000 $185.000 $175.000 $350.000 $300.000 $210.000 $205.000
TRENCH EXCAVATION PROTECTION
LF 40.000 $2.000 $12.000 $1.000 $3.500 $5.000 $52.500 $100.000
TEMPORARY SPL SHORING
SF 3,798.000 $60.000 $29.000 $21.000 $25.000 $22.000 $21.000 $23.000
DRILL SHAFT (30 IN)
LF 1,423.000 $100.000 $150.000 $130.000 $125.000 $200.000 $144.000 $115.000
RETAINING WALL (CONC BLOCK)
SF 2,237.000 $34.000 $22.000 $40.000 $40.000 $55.000 $31.500 $32.000
RETAINING WALL (SPREAD FOOTING)
SF 8,966.000 $15.000 $42.000 $55.000 $50.000 $65.000 $73.500 $102.000
RETAINING WALL (DRILL SHAFT) (FACIA)
SF 2,487.000 $55.000 $37.000 $30.000 $60.000 $75.000 $144.000 $102.000
RIPRAP (CONC)(4 IN)
CY 1,463.000 $380.000 $330.000 $435.000 $350.000 $400.000 $420.000 $357.000
RIPRAP (CONC)(FLUME)
CY 247.000 $455.000 $440.000 $420.000 $400.000 $420.000 $525.000 $394.000
RIPRAP (MOW STRIP)(4 IN)
CY 250.000 $445.000 $440.000 $450.000 $350.000 $430.000 $525.000 $412.000
RETROFIT RAIL (TY C221)
LF 190.000 $160.000 $160.000 $205.000 $185.000 $75.000 $315.000 $362.000
RC PIPE (CL III)(18 IN)
LF 39.000 $75.000 $115.000 $80.000 $65.000 $100.000 $210.000 $265.000
INLET (COMPL)(RWI)(TY II)
EA 1.000 $5,000.000 $4,800.000 $4,300.000 $5,000.000 $6,500.000 $8,400.000 $9,500.000
ADJUSTING INLETS
EA 14.000 $1,200.000 $1,500.000 $1,000.000 $1,500.000 $2,000.000 $2,100.000 $2,800.000
REMOV STR (INLET)
EA 1.000 $912.000 $750.000 $450.000 $500.000 $1,500.000 $945.000 $1,900.000
REMOV STR (RET WALL)
LF 508.000 $39.000 $6.000 $15.000 $20.000 $26.000 $42.000 $20.000
MOBILIZATION
LS 1.000 $343,967.770 $635,000.000 $640,000.000 $600,000.000 $730,000.000 $792,000.000 $760,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 9.000 $8,000.000 $45,001.000 $57,000.000 $8,500.000 $15,000.000 $52,500.000 $22,500.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 6,310.000 $2.500 $2.000 $1.750 $4.000 $2.000 $1.420 $2.880
TEMP SEDMT CONT FENCE (REMOVE)
LF 6,310.000 $1.000 $0.500 $0.450 $2.000 $1.000 $0.110 $0.400
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 480.000 $4.500 $3.700 $3.650 $12.000 $4.000 $2.630 $4.300
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 180.000 $5.500 $5.300 $5.750 $16.000 $6.000 $3.680 $5.300
BIODEG EROSN CONT LOGS (REMOVE)
LF 660.000 $1.000 $1.000 $2.250 $8.000 $2.000 $1.050 $1.500
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
LF 6,240.000 $18.500 $25.000 $33.000 $50.000 $35.000 $11.550 $7.000
PORT CTB (MOVE)(F-SHAPE)(TY 1)
LF 5,730.000 $8.000 $7.500 $7.000 $20.000 $6.000 $9.450 $11.000
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
LF 6,240.000 $6.000 $7.500 $7.250 $20.000 $8.000 $8.400 $6.000
CONC CURB (TY II)
LF 210.000 $20.000 $22.000 $12.000 $25.000 $25.000 $15.750 $16.550
MTL W-BEAM GD FEN (TIM POST)
LF 5,207.000 $20.000 $19.000 $18.500 $18.500 $25.000 $19.430 $18.500
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 14.000 $1,500.000 $1,300.000 $1,825.000 $850.000 $1,800.000 $2,177.650 $1,825.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 7.000 $1,100.000 $900.000 $1,000.000 $1,500.000 $1,000.000 $1,050.000 $1,000.000
REMOVE METAL BEAM GUARD FENCE
LF 5,207.000 $3.000 $3.200 $2.850 $3.000 $5.000 $2.990 $2.850
REMOVE TERMINAL ANCHOR SECTION
EA 7.000 $300.000 $220.000 $150.000 $500.000 $500.000 $157.500 $150.000
GUARDRAIL END TREATMENT (REMOVE)
EA 7.000 $270.000 $240.000 $325.000 $500.000 $500.000 $341.250 $325.000
GDRAIL END TRT(INST)(WOOD POST)(TY I)
EA 7.000 $2,300.000 $2,200.000 $2,205.000 $2,500.000 $2,500.000 $236.250 $2,205.000
CRASH CUSH ATTEN (INSTL)
EA 4.000 $9,000.000 $8,500.000 $8,000.000 $12,500.000 $10,000.000 $11,550.000 $8,375.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 4.000 $1,500.000 $1,100.000 $2,500.000 $5,000.000 $1,200.000 $3,150.000 $1,375.000
CRASH CUSH ATTEN (REMOVE)
EA 4.000 $900.000 $600.000 $1,000.000 $2,500.000 $1,500.000 $2,100.000 $775.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 35.000 $300.000 $400.000 $650.000 $650.000 $400.000 $341.250 $500.000
INSTL DEL ASSM (D-SW)SZ 1(FLX)GND
EA 28.000 $50.000 $40.000 $32.000 $100.000 $55.000 $47.250 $50.000
INSTL OM ASSM (OM-2Z)(FLX)GND
EA 3.000 $54.000 $45.000 $40.000 $100.000 $55.000 $50.930 $65.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 61.000 $18.000 $34.000 $33.000 $100.000 $24.000 $34.650 $33.000
WK ZN PAV MRK REMOV (W)4"(BRK)
LF 15,860.000 $1.000 $1.050 $1.000 $0.500 $2.000 $1.050 $1.000
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 16,567.000 $0.700 $0.840 $0.800 $0.500 $1.000 $0.840 $0.770
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 12,102.000 $0.700 $0.840 $0.800 $0.500 $1.000 $0.840 $0.770
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 4,087.000 $1.000 $0.920 $0.860 $0.500 $1.000 $0.900 $0.740
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 134.000 $3.500 $3.650 $3.500 $8.000 $5.000 $3.680 $2.930
PAVEMENT SEALER 4"
LF 36,871.000 $0.200 $0.150 $0.140 $0.500 $1.000 $0.150 $0.160
PAVEMENT SEALER 6"
LF 19,436.000 $0.300 $0.210 $0.200 $0.500 $1.000 $0.210 $0.200
PAVEMENT SEALER 8"
LF 4,087.000 $1.000 $0.320 $0.300 $0.500 $1.000 $0.320 $0.300
PAVEMENT SEALER 12"
LF 134.000 $2.500 $2.100 $2.000 $0.500 $3.000 $2.100 $0.500
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 17,016.000 $0.400 $0.470 $0.440 $0.500 $1.000 $0.460 $0.420
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 19,436.000 $0.600 $0.650 $0.620 $0.500 $1.000 $0.650 $0.450
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 19,855.000 $0.400 $0.500 $0.480 $0.500 $1.000 $0.500 $0.420
REFL PAV MRKR TY II-C-R
EA 1,137.000 $4.000 $3.950 $3.800 $15.000 $5.000 $3.990 $3.400
ELIM EXT PAV MRK & MRKS (4")
LF 44,529.000 $0.400 $0.460 $0.440 $0.500 $1.000 $0.460 $0.350
PAV SURF PREP FOR MRK (4")
LF 36,871.000 $0.100 $0.050 $0.040 $0.500 $1.000 $0.040 $0.120
PAV SURF PREP FOR MRK (6")
LF 19,436.000 $0.100 $0.090 $0.080 $0.500 $1.000 $0.080 $0.150
PAV SURF PREP FOR MRK (8")
LF 4,087.000 $0.100 $0.110 $0.100 $0.500 $1.000 $0.110 $0.200
PAV SURF PREP FOR MRK (12")
LF 134.000 $0.500 $1.050 $1.000 $8.000 $2.000 $1.050 $0.400
PAV SURF PREP FOR MRK (RPM)
EA 1,137.000 $0.300 $0.260 $0.250 $15.000 $1.000 $0.260 $0.750
TREE REMOVAL (4" - 12" DIA)
EA 41.000 $200.000 $210.000 $200.000 $500.000 $400.000 $262.500 $200.000
TREE REMOVAL (12" - 18" DIA)
EA 54.000 $600.000 $330.000 $250.000 $650.000 $440.000 $514.500 $250.000
TREE REMOVAL (18" - 24" DIA)
EA 55.000 $900.000 $370.000 $350.000 $850.000 $500.000 $887.250 $250.000
TREE REMOVAL (24" - 30" DIA)
EA 15.000 $1,400.000 $525.000 $1,000.000 $1,000.000 $550.000 $1,182.300 $250.000
TREE REMOVAL (30" - 36" DIA)
EA 2.000 $5,000.000 $540.000 $1,350.000 $5,000.000 $600.000 $2,608.200 $500.000
INTRLCK ART CONC BLKS (4" MIN)
SF 70,132.000 $5.000 $10.000 $8.000 $10.500 $14.000 $9.450 $8.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $7,000.000 $14,000.000 $1,000.000 $16,500.000 $15,000.000 $21,000.000 $20,000.000
COVER (ADJUST)
EA 27.000 $1,000.000 $250.000 $250.000 $750.000 $1,250.000 $1,260.000 $1,500.000
TMA (STATIONARY)
EA 2.000 $5,000.000 $37,500.000 $500.000 $8,500.000 $10,000.000 $18,000.000 $45,000.000
Totals: $4,323,787.170 $6,356,006.290 $6,451,599.300 $6,676,669.500 $7,353,815.000 $7,549,367.850 $7,637,988.280