County: DALLAS Highway: IH 20 Date: 03/05/2019 (5 years ago) Engineer's Estimate: $29,314,199 Control Number: 0095-13-043
Project: NH 2019(668) District: DALLAS Time: 0 X Type: MILL EB, FDCR, & OVERLAY EB & WB

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $29,314,198.80
AUSTIN BRIDGE & ROAD SERVICES, LP   $25,641,956.19 1
-12.53% | -$3,672,242.61
TEXAS MATERIALS GROUP, INC.   $32,750,170.93 2
11.72% | $3,435,972.13
27.72% | $7,108,214.74
JOHNSON BROS. CORPORATION, A SOUTHLAND COMPANY   $35,209,658.26 3
20.11% | $5,895,459.46
37.31% | $9,567,702.07
7.51% | $2,459,487.33
J.D. ABRAMS, L.P.   $36,129,708.70 4
23.25% | $6,815,509.90
40.9% | $10,487,752.51
2.61% | $920,050.44

Bid Items

Items: 70, 0 filtered
DALLAS IH 20  |  DALLAS  |  0095-13-043  |  03/05/2019  |  $29,314,199  |  NH 2019(668)  |  MILL EB, FDCR, & OVERLAY EB & WB  |  0 X
Item code Description Unit Quantity Engineer's Estimate AUSTIN BRIDGE & ROAD SERVICES, LP TEXAS MATERIALS GROUP, INC. JOHNSON BROS. CORPORATION, A SOUTHLAND COMPANY J.D. ABRAMS, L.P.
104 6054 REMOVING CONCRETE(MOW STRIP) LF 19,375.000 $3.000 $7.150 $8.000 $7.000 $4.250
134 6004 BACKFILL (TY A OR B) STA 1,795.890 $150.000 $140.000 $275.000 $225.000 $345.000
150 6001 BLADING STA 1,795.890 $90.000 $0.100 $68.000 $75.000 $25.000
161 6017 COMPOST MANUF TOPSOIL (4") SY 199,555.000 $1.000 $0.010 $1.050 $2.000 $0.820
164 6035 DRILL SEEDING (PERM) (RURAL) (CLAY) SY 131,222.000 $0.120 $0.110 $0.120 $0.120 $0.240
164 6039 DRILL SEEDING (PERM) (URBAN) (CLAY) SY 68,333.000 $0.120 $0.110 $0.120 $0.120 $0.210
168 6001 VEGETATIVE WATERING MG 17,126.000 $12.000 $0.100 $0.010 $24.000 $8.500
346 6014 STONE-MTRX-ASPH SMA-D SAC-A PG76-22 TON 104,826.400 $100.000 $89.000 $118.000 $102.000 $130.000
351 6008 FLEXIBLE PAVEMENT STRUCTURE REPAIR(12") SY 1,000.000 $30.000 $119.000 $95.000 $42.000 $104.000
354 6003 PLAN & TEXT ASPH CONC PAV(0" TO 3") SY 237,981.000 $3.000 $1.540 $2.000 $2.000 $1.250
354 6006 PLAN & TEXT ASPH CONC PAV(4" TO 6") SY 192,034.000 $7.000 $1.030 $1.220 $3.000 $2.000
354 6017 PLAN & TEXT CONC PAV(0" TO 2") SY 51,843.000 $2.500 $5.150 $4.000 $2.850 $2.250
361 6037 FULL - DEPTH REPAIR CPCD (12") SY 12,800.000 $160.000 $154.840 $174.000 $314.500 $154.000
361 6038 FULL - DEPTH REPAIR CPCD (13") SY 7,600.000 $180.000 $166.490 $187.000 $339.500 $167.000
432 6045 RIPRAP (MOW STRIP)(4 IN) CY 1,145.000 $430.000 $525.000 $520.000 $412.000 $450.000
500 6001 MOBILIZATION LS 1.000 $2,500,000.000 $2,435,000.000 $3,072,785.000 $3,500,000.000 $3,490,000.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 15.000 $15,000.000 $23,000.000 $23,000.000 $5,000.000 $96,750.000
506 6020 CONSTRUCTION EXITS (INSTALL) (TY 1) SY 312.000 $20.000 $27.430 $29.000 $28.000 $25.000
506 6024 CONSTRUCTION EXITS (REMOVE) SY 312.000 $7.000 $8.970 $9.250 $9.000 $6.250
506 6038 TEMP SEDMT CONT FENCE (INSTALL) LF 30,460.000 $2.500 $1.620 $1.750 $1.750 $2.150
506 6039 TEMP SEDMT CONT FENCE (REMOVE) LF 30,460.000 $0.500 $0.320 $0.350 $0.400 $0.440
506 6041 BIODEG EROSN CONT LOGS (INSTL) (12") LF 2,751.000 $4.000 $3.170 $3.250 $4.000 $3.450
506 6043 BIODEG EROSN CONT LOGS (REMOVE) LF 2,751.000 $1.000 $0.480 $0.550 $0.500 $0.440
533 6003 RUMBLE STRIPS (SHOULDER) ASPHALT LF 285,340.000 $0.120 $0.130 $0.130 $0.140 $0.240
540 6001 MTL W-BEAM GD FEN (TIM POST) LF 20,612.500 $20.000 $17.100 $18.000 $19.000 $19.500
540 6006 MTL BEAM GD FEN TRANS (THRIE-BEAM) EA 62.000 $1,725.000 $1,325.000 $1,394.737 $1,400.000 $1,470.000
540 6016 DOWNSTREAM ANCHOR TERMINAL SECTION EA 38.000 $1,250.000 $925.000 $973.684 $995.000 $1,040.000
542 6001 REMOVE METAL BEAM GUARD FENCE LF 18,750.000 $2.750 $1.450 $1.526 $1.750 $1.800
542 6002 REMOVE TERMINAL ANCHOR SECTION EA 64.000 $260.000 $100.000 $105.263 $150.000 $158.000
542 6004 RM MTL BM GD FENCE TRANS (THRIE-BEAM) EA 2.000 $260.000 $100.000 $105.263 $170.000 $176.000
544 6001 GUARDRAIL END TREATMENT (INSTALL) EA 88.000 $2,500.000 $2,475.000 $2,605.263 $2,400.000 $2,520.000
544 6003 GUARDRAIL END TREATMENT (REMOVE) EA 84.000 $240.000 $225.000 $236.842 $200.000 $210.000
644 6004 IN SM RD SN SUP&AM TY10BWG(1)SA(T) EA 8.000 $600.000 $425.000 $894.737 $490.000 $615.000
644 6064 IN BRIDGE MNT CLEARANCE SGN ASSM(TY N) EA 2.000 $2,000.000 $1,700.000 $2,342.105 $2,100.000 $2,050.000
644 6065 IN BRIDGE MNT CLEARANCE SGN ASSM(TY S) EA 6.000 $2,000.000 $1,700.000 $2,526.316 $2,000.000 $2,260.000
644 6076 REMOVE SM RD SN SUP&AM EA 8.000 $80.000 $75.000 $105.263 $75.000 $105.000
644 6077 REMOVE BRDG MNT CLEARANCE SIGN ASSM EA 8.000 $500.000 $400.000 $684.211 $500.000 $525.000
658 6001 INSTL DEL ASSM (D-SW)SZ 1(FLX)GND EA 227.000 $70.000 $55.000 $63.158 $55.000 $48.000
658 6013 INSTL DEL ASSM (D-SW)SZ (BRF)CTB EA 70.000 $25.000 $20.000 $24.211 $20.000 $16.000
658 6018 INSTL DEL ASSM (D-SY)SZ 1(FLX)GND EA 79.000 $70.000 $55.000 $63.158 $55.000 $51.000
658 6026 INSTL DEL ASSM (D-SY)SZ (BRF)CTB EA 70.000 $19.000 $20.000 $24.211 $20.000 $16.000
658 6036 INSTL DEL ASSM (D-DW)SZ 1(FLX)GND EA 251.000 $70.000 $55.000 $63.158 $58.000 $47.500
658 6061 INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2 EA 212.000 $27.000 $25.000 $27.368 $22.000 $23.100
658 6064 INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2 EA 185.000 $23.000 $25.000 $27.368 $22.000 $23.100
662 6001 WK ZN PAV MRK NON-REMOV (W)4"(BRK) LF 1,704.000 $0.480 $0.550 $0.310 $0.350 $0.500
662 6004 WK ZN PAV MRK NON-REMOV (W)4"(SLD) LF 65,047.000 $0.290 $0.310 $0.310 $0.350 $0.500
662 6034 WK ZN PAV MRK NON-REMOV (Y)4"(SLD) LF 65,047.000 $0.310 $0.310 $0.310 $0.350 $0.500
662 6109 WK ZN PAV MRK SHT TERM (TAB)TY W EA 11,257.000 $0.730 $0.840 $1.000 $1.150 $1.700
666 6036 REFL PAV MRK TY I (W)8"(SLD)(100MIL) LF 20,462.000 $1.100 $1.000 $0.870 $1.000 $0.950
666 6042 REFL PAV MRK TY I (W)12"(SLD)(100MIL) LF 1,512.000 $3.000 $3.000 $3.400 $3.250 $3.450
666 6224 PAVEMENT SEALER 4" LF 21,000.000 $0.150 $0.180 $0.210 $0.210 $0.220
666 6225 PAVEMENT SEALER 6" LF 5,280.000 $0.200 $0.250 $0.310 $0.350 $0.330
666 6303 RE PM W/RET REQ TY I (W)4"(SLD)(100MIL) LF 164,660.000 $0.320 $0.380 $0.470 $0.460 $0.490
666 6306 RE PM W/RET REQ TY I (W)6"(BRK)(100MIL) LF 58,030.000 $0.480 $0.550 $0.580 $0.600 $0.590
666 6315 RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL) LF 162,480.000 $0.320 $0.380 $0.480 $0.460 $0.490
666 6350 REFL PAV MRK TY I (W)12"(DOT)(100MIL) LF 2,292.000 $2.860 $2.750 $3.400 $3.250 $3.500
672 6010 REFL PAV MRKR TY II-C-R EA 6,519.000 $3.000 $3.250 $3.750 $3.550 $3.750
677 6001 ELIM EXT PAV MRK & MRKS (4") LF 26,280.000 $0.400 $0.450 $0.510 $0.500 $0.520
678 6001 PAV SURF PREP FOR MRK (4") LF 21,000.000 $0.100 $0.050 $0.085 $0.100 $0.090
678 6002 PAV SURF PREP FOR MRK (6") LF 5,280.000 $0.100 $0.050 $0.210 $0.250 $0.220
734 6002 LITTER REMOVAL CYC 6.000 $2,500.000 $1,900.000 $1,200.000 $1,200.000 $16,700.000
735 6001 DEBRIS REMOVAL (CNTR MEDIANS/MAINLANES) CYC 50.000 $2,300.000 $855.000 $4,000.000 $1,195.000 $9,600.000
738 6001 CLEANING / SWEEPING (CENTER MEDIAN) CYC 10.000 $2,000.000 $1,800.000 $3,000.000 $1,775.000 $9,600.000
800 6001 NO. OF WORKING DAYS $/D 4,000.000 $310.000 $300.000 $310.000 $310.000 $300.000
3000 6003 CAM (ASPHALT) PG(76-22) TON 3,868.800 $110.000 $97.750 $138.000 $140.500 $151.000
3000 6004 CAM (AGGREGATE) TON 48,360.060 $110.000 $97.750 $138.000 $140.500 $151.000
3002 6001 MEMBRANE UNDERSEAL GAL 166,302.780 $2.500 $2.600 $3.000 $6.000 $3.500
6001 6002 PORTABLE CHANGEABLE MESSAGE SIGN EA 6.000 $11,000.000 $17,750.000 $13,000.000 $13,250.000 $6,000.000
6185 6001 TMA (STATIONARY) EA 6.000 $14,000.000 $31,000.000 $22,000.000 $10,000.000 $0.010
6185 6003 TMA (MOBILE OPERATION) HR 144.000 $65.000 $110.000 $28.000 $50.000 $75.000
Totals: $29,314,198.80 $25,641,956.21 $32,750,171.00 $35,209,658.26 $36,129,708.70