REMOVING CONC (CURB)
|
LF
|
1,800.000
|
$5.000
|
$5.000
|
$30.000
|
$10.000
|
|
|
BACKFILL (TY A OR B)
|
STA
|
13.000
|
$157.000
|
$1,280.000
|
$250.000
|
$300.000
|
|
|
COMPOST MANUF TOPSOIL (2")
|
SY
|
454.000
|
$1.720
|
$5.720
|
$8.000
|
$4.000
|
|
|
BLOCK SODDING
|
SY
|
454.000
|
$3.260
|
$6.490
|
$8.500
|
$6.000
|
|
|
VEGETATIVE WATERING
|
MG
|
67.500
|
$4.000
|
$52.800
|
$100.000
|
$35.000
|
|
|
TOM-C (AGGREGATE) SAC-A
|
TON
|
9,471.000
|
$125.000
|
$134.200
|
$122.000
|
$200.000
|
|
|
TOM (ASPHALT) PG 70-22
|
TON
|
605.000
|
$125.000
|
$134.200
|
$122.000
|
$125.000
|
|
|
PLANE ASPH CONC PAV (0" TO 1 1/2")
|
SY
|
146,547.000
|
$1.300
|
$1.380
|
$1.250
|
$3.000
|
|
|
FULL - DEPTH REPAIR CPJR (9")
|
SY
|
250.000
|
$250.000
|
$294.000
|
$220.000
|
$333.000
|
|
|
FULL-DEPTH REPAIR CPCD (9") HES
|
SY
|
1,697.000
|
$200.000
|
$268.000
|
$220.000
|
$333.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
41.000
|
$142.000
|
$488.000
|
$315.000
|
$450.000
|
|
|
CONC STR REPAIR(RAPID DECK REP(PRT DPT)
|
SF
|
200.000
|
$250.000
|
$43.000
|
$120.000
|
$250.000
|
|
|
CONC STR REPR(RAPID DECK REP(FULL DPT))
|
SF
|
75.000
|
$250.000
|
$207.000
|
$120.000
|
$450.000
|
|
|
CONC STR REPAIR (VERTICAL & OVERHEAD)
|
SF
|
80.000
|
$300.000
|
$187.000
|
$300.000
|
$350.000
|
|
|
RIPRAP (CONC)(FLUME)
|
CY
|
9.000
|
$385.000
|
$1,100.000
|
$850.000
|
$400.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
80.000
|
$440.000
|
$580.000
|
$600.000
|
$600.000
|
|
|
CLEANING AND SEALING EXISTING JOINTS
|
LF
|
54,728.000
|
$5.000
|
$1.820
|
$3.000
|
$28.000
|
|
|
LATEX - MODIFIED CONC OVERLAY (1.5 IN)
|
SY
|
600.000
|
$150.000
|
$80.000
|
$120.000
|
$125.000
|
|
|
CLEAN & PAINT EXIST STR (SYSTEM II)
|
LS
|
1.000
|
$8,000.000
|
$44,000.000
|
$55,000.000
|
$450,000.000
|
|
|
RAIL (TY T221)(HPC)
|
LF
|
32.000
|
$500.000
|
$630.000
|
$750.000
|
$55.000
|
|
|
MILLING CONCRETE SLAB (1/2 IN)
|
SY
|
600.000
|
$10.000
|
$17.000
|
$30.000
|
$22.000
|
|
|
HYDRO-DEMOLITION (1 IN)
|
SY
|
600.000
|
$105.000
|
$139.000
|
$120.000
|
$88.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$413,046.000
|
$280,500.000
|
$435,000.000
|
$686,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
9.000
|
$15,000.000
|
$10,000.000
|
$11,000.000
|
$15,000.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
156.000
|
$20.000
|
$18.700
|
$19.000
|
$33.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
156.000
|
$7.000
|
$10.180
|
$10.000
|
$20.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
1,850.000
|
$2.000
|
$1.930
|
$2.000
|
$3.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
3,700.000
|
$0.500
|
$0.460
|
$0.450
|
$3.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
1,850.000
|
$4.000
|
$3.850
|
$3.800
|
$6.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
1,850.000
|
$1.000
|
$0.720
|
$0.700
|
$2.000
|
|
|
TEMP SDMT CONT FENCE (INLET PROTECTION)
|
LF
|
1,850.000
|
$8.250
|
$3.850
|
$3.800
|
$5.000
|
|
|
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
|
LF
|
350.000
|
$26.000
|
$110.000
|
$95.000
|
$100.000
|
|
|
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
|
LF
|
350.000
|
$8.000
|
$110.000
|
$55.000
|
$45.000
|
|
|
CONC CURB (TY I)
|
LF
|
100.000
|
$20.000
|
$26.000
|
$50.000
|
$15.000
|
|
|
CONC CURB (TY II)
|
LF
|
1,700.000
|
$20.000
|
$26.000
|
$45.000
|
$20.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
1,432.500
|
$20.000
|
$21.180
|
$20.500
|
$30.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
2.000
|
$1,600.000
|
$1,628.000
|
$1,600.000
|
$2,200.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
5.000
|
$1,200.000
|
$1,100.000
|
$1,075.000
|
$2,200.000
|
|
|
MTL BM GD FEN TRANS (NON - SYM)
|
EA
|
2.000
|
$760.000
|
$550.000
|
$535.000
|
$2,200.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
1,150.000
|
$2.500
|
$3.300
|
$3.250
|
$5.000
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
5.000
|
$195.000
|
$137.500
|
$135.000
|
$450.000
|
|
|
REMOVE DOWNSTREAM ANCHOR TERMINAL
|
EA
|
1.000
|
$500.000
|
$165.000
|
$160.000
|
$450.000
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$253.000
|
$165.000
|
$160.000
|
$350.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
5.000
|
$2,600.000
|
$2,640.000
|
$2,500.000
|
$3,500.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
6.000
|
$280.000
|
$275.000
|
$270.000
|
$500.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
2.000
|
$650.000
|
$715.000
|
$700.000
|
$1,500.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
2.000
|
$8,500.000
|
$8,593.200
|
$7,500.000
|
$15,000.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
6.000
|
$530.000
|
$750.000
|
$640.000
|
$750.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SB(T)
|
EA
|
8.000
|
$460.000
|
$750.000
|
$700.000
|
$750.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
20.000
|
$30.000
|
$36.300
|
$35.000
|
$50.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
|
LF
|
15,256.000
|
$0.400
|
$0.440
|
$0.400
|
$1.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
49,966.000
|
$0.300
|
$0.440
|
$0.400
|
$1.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
4,580.000
|
$1.000
|
$0.500
|
$1.200
|
$5.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
7,440.000
|
$0.930
|
$0.970
|
$1.200
|
$2.000
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
4,144.000
|
$3.000
|
$2.750
|
$3.600
|
$3.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
1,335.000
|
$6.350
|
$6.160
|
$6.000
|
$8.000
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
24.000
|
$130.000
|
$137.500
|
$152.000
|
$188.000
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
23.000
|
$160.000
|
$170.500
|
$185.000
|
$188.000
|
|
REFL PAV MRK TY I(W)(EXIT GORE)(100MIL)
|
EA
|
1.000
|
$800.000
|
$1,650.000
|
$1,340.000
|
$2,000.000
|
|
RE PV MRK TY I(BLACK)6"(SHADOW)(100MIL)
|
LF
|
2,700.000
|
$0.750
|
$1.100
|
$1.900
|
$2.000
|
|
|
PAVEMENT SEALER 4"
|
LF
|
76,500.000
|
$0.100
|
$0.150
|
$0.200
|
$0.200
|
|
|
PAVEMENT SEALER 8"
|
LF
|
4,360.000
|
$0.300
|
$0.330
|
$0.450
|
$0.500
|
|
|
PAVEMENT SEALER 12"
|
LF
|
2,494.000
|
$1.200
|
$1.490
|
$0.700
|
$2.000
|
|
|
PAVEMENT SEALER 24"
|
LF
|
794.000
|
$2.000
|
$3.300
|
$1.500
|
$4.000
|
|
|
PAVEMENT SEALER (ARROW)
|
EA
|
12.000
|
$27.000
|
$60.500
|
$45.000
|
$88.000
|
|
|
PAVEMENT SEALER (WORD)
|
EA
|
11.000
|
$38.000
|
$82.500
|
$63.000
|
$95.000
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
50,673.000
|
$0.500
|
$0.530
|
$0.500
|
$1.000
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
|
LF
|
2,700.000
|
$0.500
|
$1.100
|
$0.500
|
$2.000
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
80,193.000
|
$0.300
|
$0.460
|
$0.500
|
$1.000
|
|
|
REF PROF PAV MRK TY I(W)4"(SLD)(100MIL)
|
LF
|
79,693.000
|
$1.500
|
$0.830
|
$0.750
|
$1.000
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
1,668.000
|
$4.000
|
$4.400
|
$5.500
|
$6.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
103,525.000
|
$0.500
|
$0.530
|
$0.400
|
$1.000
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
5,505.000
|
$0.750
|
$0.770
|
$0.800
|
$1.000
|
|
|
ELIM EXT PAV MRK & MRKS (12")
|
LF
|
3,246.000
|
$1.250
|
$2.420
|
$1.600
|
$4.000
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
1,003.000
|
$3.000
|
$3.520
|
$3.350
|
$4.000
|
|
|
ELIM EXT PAV MRK & MRKS (ARROW)
|
EA
|
12.000
|
$53.000
|
$82.500
|
$55.000
|
$100.000
|
|
|
ELIM EXT PAV MRK & MRKS (WORD)
|
EA
|
11.000
|
$53.000
|
$82.500
|
$65.000
|
$100.000
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
76,500.000
|
$0.100
|
$0.040
|
$0.180
|
$0.080
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
4,360.000
|
$0.170
|
$0.110
|
$0.340
|
$0.200
|
|
|
PAV SURF PREP FOR MRK (12")
|
LF
|
2,494.000
|
$0.500
|
$0.280
|
$0.500
|
$0.500
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
794.000
|
$1.130
|
$0.550
|
$1.100
|
$1.000
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
12.000
|
$15.000
|
$27.500
|
$28.000
|
$50.000
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
11.000
|
$30.000
|
$38.500
|
$40.000
|
$50.000
|
|
|
VEH LP DETECT (SAWCUT)
|
LF
|
2,312.000
|
$16.000
|
$13.530
|
$31.000
|
$12.000
|
|
|
FIBER REINFORCED POLYMER PATCHING MATLS
|
LB
|
23,352.000
|
$4.000
|
$5.400
|
$4.000
|
$5.000
|
|
|
CONCRETE RAIL REPAIR (MISC)
|
LF
|
10.000
|
$750.000
|
$1,000.000
|
$1,100.000
|
$1,400.000
|
|
|
BRIDGE JOINT REPLACEMENT (ARMOR)
|
LF
|
57.000
|
$140.000
|
$650.000
|
$350.000
|
$1,100.000
|
|
|
MEMBRANE UNDERSEAL
|
GAL
|
29,309.000
|
$2.500
|
$2.920
|
$2.650
|
$4.000
|
|
|
HIGH FRICTION SURFACE COURSE
|
SY
|
21,903.000
|
$23.000
|
$18.310
|
$20.500
|
$33.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
8.000
|
$11,000.000
|
$7,650.000
|
$8,500.000
|
$50.000
|
|
|
GROUND BOX (PREPARE)
|
EA
|
11.000
|
$275.000
|
$550.000
|
$325.000
|
$500.000
|
|
|
TMA (STATIONARY)
|
DAY
|
147.000
|
$200.000
|
$328.000
|
$300.000
|
$10.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
25.000
|
$250.000
|
$200.000
|
$550.000
|
$10.000
|
|
Totals: |
$4,353,933.540
|
$4,268,178.360
|
$4,382,163.050
|
$8,090,836.500
|