|
|
REMOVING CONC (CURB)
|
LF
|
10.000
|
$5.000
|
$18.000
|
$17.000
|
|
|
FULL - DEPTH REPAIR CPJR (9")
|
SY
|
1,383.000
|
$260.000
|
$202.000
|
$260.000
|
|
|
FULL - DEPTH REPAIR CPJR (10")
|
SY
|
4,398.000
|
$260.000
|
$215.000
|
$260.000
|
|
|
CUT & RESTORE CONC PAVING
|
SY
|
4.000
|
$100.000
|
$1,180.000
|
$500.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
0.500
|
$152.000
|
$21,000.000
|
$1,200.000
|
|
|
APPROACH SLAB (EXTEND)
|
CY
|
9.600
|
$800.000
|
$2,455.000
|
$1,500.000
|
|
|
CONC STR REPAIR(RAPID DECK REP(PRT DPT)
|
SF
|
49.000
|
$12.000
|
$193.000
|
$300.000
|
|
|
CONC STR REPAIR (VERTICAL & OVERHEAD)
|
SF
|
105.000
|
$200.000
|
$213.000
|
$260.000
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
90.000
|
$150.000
|
$800.000
|
$230.000
|
|
|
RIPRAP (CONC)(FLUME)
|
CY
|
11.000
|
$700.000
|
$2,000.000
|
$1,200.000
|
|
|
CLEANING AND SEALING EXISTING JOINTS
|
LF
|
281,776.000
|
$2.000
|
$2.050
|
$1.950
|
|
|
CLEANING AND SEALING JOINTS (CL 7)
|
LF
|
1,616.000
|
$28.000
|
$40.000
|
$23.000
|
|
|
RC PIPE (CL III)(48 IN)
|
LF
|
8.000
|
$250.000
|
$636.000
|
$1,200.000
|
|
|
REMOV STR (DRAINAGE FLUME)
|
EA
|
1.000
|
$300.000
|
$1,825.000
|
$5,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$456,722.360
|
$540,000.000
|
$640,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
12.000
|
$12,500.000
|
$35,900.000
|
$50,000.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
1,989.000
|
$5.000
|
$3.000
|
$3.750
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
1,989.000
|
$1.000
|
$1.000
|
$0.800
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
2,000.000
|
$5.000
|
$4.500
|
$4.180
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
2,000.000
|
$1.000
|
$1.000
|
$0.850
|
|
|
CONC CURB (TY II)
|
LF
|
10.000
|
$30.000
|
$113.000
|
$115.000
|
|
|
WK ZN PAV MRK REMOV (REFL) TY I-C
|
EA
|
1,674.000
|
$4.000
|
$6.000
|
$3.490
|
|
|
WK ZN PAV MRK REMOV (W)4"(BRK)
|
LF
|
28,448.000
|
$1.150
|
$2.000
|
$1.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
9,630.000
|
$1.150
|
$0.750
|
$0.700
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
2,510.000
|
$3.500
|
$2.750
|
$2.490
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
600.000
|
$7.000
|
$6.000
|
$5.590
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
104.000
|
$150.000
|
$121.000
|
$110.000
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
60.000
|
$170.000
|
$121.000
|
$111.000
|
|
|
PAVEMENT SEALER 6"
|
LF
|
167,412.000
|
$0.150
|
$0.200
|
$0.180
|
|
|
PAVEMENT SEALER 8"
|
LF
|
9,630.000
|
$0.250
|
$0.200
|
$0.190
|
|
|
PAVEMENT SEALER 12"
|
LF
|
2,510.000
|
$1.000
|
$0.350
|
$0.300
|
|
|
PAVEMENT SEALER 24"
|
LF
|
600.000
|
$0.500
|
$1.000
|
$0.900
|
|
|
PAVEMENT SEALER (ARROW)
|
EA
|
104.000
|
$20.000
|
$19.000
|
$17.000
|
|
|
PAVEMENT SEALER (WORD)
|
EA
|
60.000
|
$25.000
|
$19.000
|
$17.000
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
|
LF
|
33,482.000
|
$1.000
|
$0.600
|
$0.580
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
66,965.000
|
$1.000
|
$0.600
|
$0.580
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
66,965.000
|
$1.000
|
$0.600
|
$0.580
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
7,177.000
|
$4.000
|
$3.750
|
$3.390
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
167,412.000
|
$0.100
|
$0.200
|
$0.170
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
9,630.000
|
$0.130
|
$0.200
|
$0.190
|
|
|
PAV SURF PREP FOR MRK (12")
|
LF
|
2,510.000
|
$0.350
|
$0.350
|
$0.330
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
600.000
|
$0.750
|
$0.550
|
$0.500
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
104.000
|
$20.000
|
$20.000
|
$18.000
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
60.000
|
$25.000
|
$20.000
|
$18.000
|
|
|
VEH LP DETECT (SAWCUT)
|
LF
|
2,288.000
|
$15.000
|
$56.000
|
$20.000
|
|
|
CRACK CLEANING AND SEALING (JCP)
|
LF
|
1,000.000
|
$8.000
|
$17.000
|
$16.000
|
|
|
SPALLING REPAIR (HYDRAULIC CEMENT)
|
CF
|
350.000
|
$250.000
|
$162.000
|
$175.000
|
|
|
CNC CRACK REPAIR (DISCRETE)(GRAVITY)
|
LF
|
75.000
|
$50.000
|
$50.000
|
$45.000
|
|
|
CNC CRACK REPAIR (DISCRETE)(INJECT)
|
LF
|
7.000
|
$100.000
|
$118.000
|
$150.000
|
|
|
CNC CRACK REPAIR (DISCRETE)(SURF SEAL)
|
LF
|
10.000
|
$94.000
|
$91.000
|
$75.000
|
|
|
BRIDGE JOINT REPAIR (CONCRETE)
|
LF
|
37.000
|
$500.000
|
$460.000
|
$400.000
|
|
|
BRIDGE JOINT REPAIR (ARMOR)
|
LF
|
13.000
|
$510.000
|
$649.000
|
$550.000
|
|
|
CONCRETE BEAM REPAIR (CFRP)
|
EA
|
4.000
|
$15,000.000
|
$85,000.000
|
$115,000.000
|
|
|
CONTINUOUS DIAMOND GRINDING CONC PVMT
|
SY
|
246,032.000
|
$4.500
|
$5.560
|
$6.900
|
|
|
REPLACE ELASTOMERIC BEARING PADS
|
EA
|
4.000
|
$5,000.000
|
$17,000.000
|
$25,000.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
4.000
|
$10,000.000
|
$12,500.000
|
$25,000.000
|
|
|
GROUND BOX (PREPARE)
|
EA
|
9.000
|
$350.000
|
$550.000
|
$1,500.000
|
|
|
TMA (STATIONARY)
|
DAY
|
408.000
|
$250.000
|
$210.000
|
$165.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
204.000
|
$250.000
|
$400.000
|
$450.000
|
|
Totals: |
$4,681,945.960
|
$5,572,514.470
|
$6,398,576.000
|