PREPARING ROW
|
STA
|
325.350
|
$1,000.000
|
$325.000
|
$600.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
3,495.000
|
$10.000
|
$14.000
|
$13.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
52,361.000
|
$10.000
|
$12.000
|
$16.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY A)
|
CY
|
41,306.000
|
$15.000
|
$26.000
|
$65.000
|
|
|
PROOF ROLLING
|
HR
|
10.000
|
$90.000
|
$130.000
|
$90.000
|
|
|
FL BS (RDWY DEL)(TY A GR 5)
|
TON
|
79,320.000
|
$35.000
|
$32.000
|
$46.500
|
|
|
FLY ASH (CLASS CS)
|
TON
|
6,528.000
|
$85.000
|
$215.000
|
$260.000
|
|
|
FA TRT FOR BS CRS (NEW BASE)(10")
|
SY
|
154,902.000
|
$2.500
|
$3.000
|
$7.700
|
|
|
PRIME COAT (CSS-1H)
|
GAL
|
30,981.000
|
$5.000
|
$4.500
|
$6.700
|
|
|
EMULS ASPH (BS OR SUBGR TRT)(CSS-1H)
|
GAL
|
5,219.000
|
$4.000
|
$4.500
|
$6.000
|
|
|
EMULS ASPH (EROSN CONT)(MULTI)
|
GAL
|
2,901.000
|
$4.500
|
$4.500
|
$6.000
|
|
|
SUPERPAVE MIXTURES SP-B PG64-22
|
TON
|
5,741.000
|
$90.000
|
$100.000
|
$150.000
|
|
|
SUPERPAVE MIXTURES SP-C SAC-A PG70-22
|
TON
|
16,253.000
|
$90.000
|
$100.000
|
$135.000
|
|
|
PLANE ASPH CONC PAV(0" TO 1")
|
SY
|
93,999.000
|
$1.500
|
$2.200
|
$1.750
|
|
|
PLANE ASPH CONC PAV(0" TO 6")
|
SY
|
17,395.000
|
$2.000
|
$5.000
|
$8.600
|
|
|
STRUCT EXCAV (PIPE)
|
CY
|
655.000
|
$5.000
|
$4.000
|
$46.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
665.000
|
$100.000
|
$170.000
|
$220.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
254.000
|
$2.000
|
$10.000
|
$1.500
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
227.000
|
$400.000
|
$400.000
|
$925.000
|
|
|
RIPRAP (CONC)(CL B)(RR8&RR9)
|
CY
|
48.000
|
$475.000
|
$400.000
|
$1,400.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
74.000
|
$450.000
|
$400.000
|
$930.000
|
|
|
CONC BOX CULV (5 FT X 4 FT)
|
LF
|
150.000
|
$315.000
|
$400.000
|
$760.000
|
|
|
CONC BOX CULV (8 FT X 7 FT)
|
LF
|
154.000
|
$800.000
|
$600.000
|
$1,200.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
444.000
|
$70.000
|
$80.000
|
$150.000
|
|
|
RC PIPE (CL III)(48 IN)
|
LF
|
514.000
|
$205.000
|
$200.000
|
$320.000
|
|
|
WINGWALL (FW - 0) (HW=7 FT)
|
EA
|
2.000
|
$10,000.000
|
$13,000.000
|
$20,000.000
|
|
|
SET (PIPE RUNNER ASSEMBLY)
|
EA
|
14.000
|
$3,000.000
|
$3,000.000
|
$1,300.000
|
|
|
SET (TY I)(S= 5 FT)(HW= 4 FT)(3:1) (C)
|
EA
|
2.000
|
$7,000.000
|
$8,000.000
|
$16,000.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (C)
|
EA
|
12.000
|
$1,500.000
|
$1,800.000
|
$3,000.000
|
|
|
SET (TY II) (48 IN) (RCP) (3: 1) (C)
|
EA
|
12.000
|
$4,000.000
|
$3,000.000
|
$9,100.000
|
|
|
REMOV STR (PIPE)
|
LF
|
132.000
|
$30.000
|
$25.000
|
$80.000
|
|
|
REMOV STR (PIPE)
|
EA
|
4.000
|
$350.000
|
$1,000.000
|
$376.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$400,000.000
|
$1,150,000.000
|
$1,867,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
12.000
|
$10,000.000
|
$13,000.000
|
$30,225.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
666.000
|
$20.000
|
$20.000
|
$61.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
666.000
|
$8.000
|
$15.000
|
$17.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
36,598.000
|
$2.500
|
$3.500
|
$4.200
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
36,598.000
|
$0.750
|
$1.250
|
$0.900
|
|
|
ONE-WAY TRAF CONT (FLAGGER CONT)
|
HR
|
80.000
|
$75.000
|
$200.000
|
$75.000
|
|
|
ONE-WAY TRAF CONT (PILOT CAR)
|
HR
|
400.000
|
$75.000
|
$150.000
|
$200.000
|
|
|
ONE-WAY TRAF CONT (PORT TRAF SIG)
|
MO
|
11.000
|
$8,000.000
|
$6,500.000
|
$20,000.000
|
|
|
PORT CTB (DES SOURCE)(F-SHAPE)(TY 1)
|
LF
|
2,250.000
|
$15.000
|
$22.000
|
$50.000
|
|
|
PORT CTB (MOVE)(F-SHAPE)(TY 1)
|
LF
|
8,400.000
|
$5.000
|
$8.000
|
$12.000
|
|
|
PORT CTB (STKPL)(F-SHAPE)(TY 1)
|
LF
|
2,250.000
|
$5.000
|
$26.000
|
$45.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
1,093.000
|
$40.000
|
$70.000
|
$107.000
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
65,050.000
|
$0.150
|
$0.550
|
$0.150
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
32,525.000
|
$0.200
|
$0.550
|
$0.180
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
1,200.000
|
$30.000
|
$27.000
|
$28.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$2,750.000
|
$3,200.000
|
$3,100.000
|
|
|
CRASH CUSH ATTEN (INSTL)
|
EA
|
1.000
|
$12,000.000
|
$25,000.000
|
$13,200.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
8.000
|
$1,500.000
|
$800.000
|
$2,000.000
|
|
|
CRASH CUSH ATTEN (STKPL)
|
EA
|
1.000
|
$1,000.000
|
$1,800.000
|
$1,500.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
15.000
|
$650.000
|
$780.000
|
$520.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
2.000
|
$650.000
|
$850.000
|
$520.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
18.000
|
$100.000
|
$170.000
|
$80.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 2(WC)GND(BI)
|
EA
|
78.000
|
$55.000
|
$90.000
|
$52.000
|
|
|
INSTL OM ASSM (OM-2Y)(WC)GND
|
EA
|
20.000
|
$75.000
|
$95.000
|
$78.000
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
57.000
|
$50.000
|
$45.000
|
$11.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y
|
EA
|
6,915.000
|
$1.000
|
$1.300
|
$2.000
|
|
REFL PAV MRK TY II (W) 4" (SLD)
|
LF
|
65,370.000
|
$0.150
|
$0.450
|
$0.200
|
|
REFL PAV MRK TY II (Y) 4" (BRK)
|
LF
|
4,750.000
|
$0.150
|
$0.450
|
$0.220
|
|
REFL PAV MRK TY II (Y) 4" (SLD)
|
LF
|
36,344.000
|
$0.150
|
$0.450
|
$0.220
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
65,370.000
|
$0.500
|
$0.700
|
$0.400
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
4,750.000
|
$0.500
|
$0.700
|
$0.400
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
36,344.000
|
$0.500
|
$0.700
|
$0.400
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
694.000
|
$3.000
|
$15.000
|
$4.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$10,000.000
|
$14,000.000
|
$25,000.000
|
|
|
TMA (STATIONARY)
|
EA
|
2.000
|
$25,000.000
|
$16,500.000
|
$100,000.000
|
|
Totals: |
$9,408,524.600
|
$11,896,484.900
|
$18,914,399.430
|