CROSBY FM 261 (0949-02-011)

Items: 58

County: CROSBY
Length: N/A
Highway: FM 261
District: LUBBOCK
Control Number: 0949-02-011
DBE Goal: N/A
Project: BR 2023(565)
Guaranty: N/A
Time: 289 WORKING DAYS
Engineer's Estimate: $6,074,225.00
Date: 03/08/2023 (3 years ago)
Contract Number: N/A
Type: HBP BRIDGE REPLACEMENT PROJECT ON FM 261.
Mail/Deliver Bids To: N/A
HEATH BOZEMAN
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (1)
E
Engineer's Estimate
$6,074,225.00
$7,482,764.60
Over/Under Est: 23.19% $1,408,539.60
Subcontractor Percentage Amount
M & D FOUNDATION DRILLING INDUSTRIES, INC. 2.69% $201,286.38
TORO BRAVO CONSTRUCTION, LLC 0.71% $53,127.63
TRP CONSTRUCTION GROUP, LLC 0.65% $48,637.97
MORRIS COUNTY CONTRACTORS, L.L.C. 0.52% $38,910.38
1 PRIORITY ENVIRONMENTAL SERVICES, LLC 0.36% $26,937.95
LANCO TURF & SEEDING, INC. 0.33% $24,693.12
FC TRAFFIC CONTROL, INC. 0.22% $16,462.08
TORO BRAVO CONSTRUCTION, LLC 0.18% $13,468.98
Total: 5.66% $423,524.49

Bid Items & Bid Tabulations

58 Total 0 of 58
CROSBY  |  FM 261  |  LUBBOCK  |  0949-02-011  |  03/08/2023  |  $6,074,225.00  |  BR 2023(565)  |  HBP BRIDGE REPL PROJECT ON FM 261.  |  289 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
EARTH BUILDERS, L.P.
PREPARING ROW
STA 14.000 $2,000.000 $20,000.000
REMOVING CONCRETE(MOW STRIP)
LF 520.000 $10.000 $10.000
REMOVING STAB BASE AND ASPH PAV (2"-6")
SY 844.000 $20.000 $25.000
EXCAVATION (ROADWAY AND CHANNEL)
CY 1,606.000 $20.000 $25.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 293.000 $20.000 $25.000
DRILL SEEDING (PERM) (RURAL) (CLAY)
SY 11,376.000 $1.000 $0.500
PROOF ROLLING
HR 10.000 $300.000 $90.000
EMULS ASPH (EROSN CONT)(CSS-1H)
GAL 1,593.000 $10.000 $12.000
CONC PVMT (CONT REINF - CRCP) (8")
SY 1,070.000 $140.000 $210.000
CONC PVMT (CRCP)(JCT TERMINAL)(8")
SY 67.000 $200.000 $230.000
CEM STABIL BKFL
CY 195.600 $250.000 $450.000
TEMPORARY SPL SHORING (COFFERDAM)
SF 3,200.000 $20.000 $3.000
DRILL SHAFT (18 IN)
LF 150.000 $300.000 $220.000
DRILL SHAFT (36 IN)
LF 1,415.000 $400.000 $500.000
CL C CONC (ABUT)(HPC)
CY 66.000 $1,800.000 $2,500.000
CL C CONC (CAP)(HPC)
CY 119.400 $1,800.000 $2,500.000
CL C CONC (COLUMN)(HPC)
CY 37.700 $2,000.000 $2,500.000
REINF CONC SLAB
SF 31,050.000 $40.000 $35.000
APPROACH SLAB
CY 84.200 $1,000.000 $1,200.000
PRESTR CONC GIRDER (TX46)
LF 4,029.000 $270.000 $270.000
EPOXY WATERPROOF FINISH (TY X)
SF 4,456.200 $15.000 $15.000
RIPRAP (CONC)(CL B)(RR8&RR9)
CY 130.000 $600.000 $750.000
RIPRAP (MOW STRIP)(5 IN)
CY 220.000 $600.000 $750.000
CLEANING AND SEALING JOINTS
LF 658.000 $25.000 $45.000
RAIL (TY T223)(HPC)
LF 1,414.000 $220.000 $210.000
ARMOR JOINT (SEALED)
LF 336.000 $100.000 $150.000
REMOV STR (BRIDGE 500 - 999 FT LENGTH)
EA 1.000 $600,000.000 $1,250,000.000
MOBILIZATION
LS 1.000 $552,000.000 $700,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 18.000 $3,000.000 $2,000.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 260.000 $50.000 $60.000
ROCK FILTER DAMS (REMOVE)
LF 260.000 $15.000 $10.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 444.000 $50.000 $60.000
CONSTRUCTION EXITS (REMOVE)
SY 444.000 $10.000 $10.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 3,923.000 $6.000 $4.200
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,962.000 $2.000 $1.600
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 768.000 $10.000 $9.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 384.000 $2.000 $1.600
MTL W-BEAM GD FEN (STEEL POST)
LF 500.000 $50.000 $42.000
MTL THRIE-BEAM GD FEN (STEEL POST)
EA 4.000 $3,500.000 $2,900.000
REMOVE METAL BEAM GUARD FENCE
LF 300.000 $12.000 $5.000
REMOVE TERMINAL ANCHOR SECTION
EA 2.000 $1,000.000 $350.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $4,000.000 $4,000.000
GUARDRAIL END TREATMENT (REMOVE)
EA 2.000 $1,500.000 $350.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 4.000 $1,200.000 $950.000
REMOVE SM RD SN SUP&AM
EA 5.000 $300.000 $150.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 14.000 $60.000 $35.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 12.000 $90.000 $60.000
PREFAB PAV MRK TY B (W)(6")(SLD)
LF 1,946.000 $10.000 $15.000
PREFAB PAV MRK TY B (Y)(6")(SLD)
LF 1,946.000 $10.000 $15.000
REFL PAV MRKR TY II-A-A
EA 26.000 $15.000 $11.000
PAV SURF PREP FOR MRK (6")
LF 3,892.000 $3.000 $0.700
FULL - WIDTH MOWING
CYC 2.000 $3,000.000 $2,500.000
LITTER REMOVAL
CYC 2.000 $2,000.000 $2,500.000
TACK COAT
GAL 168.000 $10.000 $15.000
D-GR HMA TY-C PG 70-28 (EXEMPT)
TON 275.000 $300.000 $300.000
TEMP CONSTRUCTION ACCESS
LS 1.000 $50,000.000 $100,000.000
INSTALL BRIDGE IDENTIFICATION NUMBERS
EA 2.000 $600.000 $650.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 1,080.000 $50.000 $100.000
Totals: $6,074,225.000 $7,482,764.600