CROSBY US 62 (0453-02-018)

Items: 52

County: CROSBY
Length: N/A
Highway: US 62
District: LUBBOCK
Control Number: 0453-02-018
DBE Goal: N/A
Project: C 453-2-18
Guaranty: N/A
Time: 92 WORKING DAYS
Engineer's Estimate: $10,520,730.29
Date: 03/07/2018 (8 years ago)
Contract Number: N/A
Type: PAVEMENT REPAIR, LEVEL-UP, OVERLAY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (4)
E
Engineer's Estimate
$10,520,730.29
$8,589,407.73
Over/Under Est: -18.36% -$1,931,322.56
$8,666,814.16
Over/Under Est: -17.62% -$1,853,916.13
Amt Left: 0.9% $77,406.43
$8,905,209.75
Over/Under Est: -15.36% -$1,615,520.54
Amt Left: 3.68% $315,802.02
Delta: -2.75% -$238,395.59
$10,672,015.55
Over/Under Est: 1.44% $151,285.26
Amt Left: 24.25% $2,082,607.82
Delta: -19.84% -$1,766,805.80

Bid Items & Bid Tabulations

52 Total 0 of 52
CROSBY  |  US 62  |  LUBBOCK  |  0453-02-018  |  03/07/2018  |  $10,520,730.29  |  C 453-2-18  |  PAVMT REPAIR, LEVEL-UP, OVERLAY  |  92 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ALLEN BUTLER CONSTRUCTION, INC.
DUININCK, INC.
J. LEE MILLIGAN, INC.
GILVIN-TERRILL, LTD.
REMOVING STAB BASE AND ASPH PAV(8")
SY 15,402.000 $6.000 $2.440 $3.900 $4.550 $5.000
BACKFILL (TY B)
STA 611.000 $250.000 $31.720 $220.000 $160.000 $65.000
SPEC EXCAV WORK (ORIGINAL)
CY 5,097.000 $12.000 $8.620 $10.500 $13.850 $15.000
PROOF ROLLING
HR 25.000 $200.000 $134.670 $155.000 $120.000 $100.000
FL BS (RDWY DEL) (TY A GR 4)
TON 6,004.000 $15.000 $18.450 $22.500 $23.800 $17.000
CEMENT
TON 260.000 $150.000 $149.410 $175.000 $142.000 $150.000
CEMENT TREAT (EXIST MATL) (6")
SY 15,402.000 $3.500 $2.620 $3.300 $2.650 $5.000
CEMENT TREAT (NEW BASE) (6")
SY 15,402.000 $2.500 $2.320 $3.600 $4.550 $6.000
PRIME COAT (AE-P)
GAL 3,711.000 $4.500 $4.020 $4.100 $4.300 $7.000
EMULS ASPH (EROSN CONT)(SS-1)
GAL 8,142.000 $4.500 $3.070 $3.750 $2.850 $5.000
FOG SEAL (CSS-1H)
GAL 3,128.000 $4.500 $2.780 $4.400 $4.100 $5.000
ASPH (AC-20-5TR)
GAL 6,423.000 $4.250 $3.120 $4.100 $3.500 $15.000
ASPH (CRS-1P)
GAL 1,000.000 $4.250 $3.750 $5.000 $4.900 $20.000
AGGR(TY-PB GR-4 SAC-B)
CY 177.000 $100.000 $317.330 $175.000 $225.000 $161.000
D-GR HMA TY-B PG70-28
TON 3,542.000 $90.000 $82.170 $98.000 $90.400 $121.000
D-GR HMA TY-D PG70-28 (LEVEL-UP)
TON 28,315.000 $117.000 $95.290 $95.000 $100.000 $123.000
STONE-MTRX-ASPH SMA-D SAC-A PG70-28
TON 33,983.000 $137.000 $116.950 $115.000 $111.650 $129.000
PLANE ASPH CONC PAV(0" TO 3")
SY 22,026.000 $3.000 $1.550 $2.150 $1.800 $3.000
FLOWABLE BACKFILL
CY 25.000 $250.000 $118.140 $260.000 $370.000 $205.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 15.000 $150.000 $210.580 $210.000 $210.000 $320.000
RIPRAP (MOW STRIP)(4 IN)
CY 50.000 $500.000 $406.020 $680.000 $685.000 $505.000
RETROFIT RAIL (TY T131RC)
LF 110.250 $200.000 $230.880 $190.000 $192.000 $165.000
REMOV STR (PIPE)
LF 88.000 $47.000 $27.890 $26.000 $22.750 $30.000
MOBILIZATION
LS 1.000 $968,705.000 $774,152.130 $530,000.000 $788,000.000 $1,000,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 8.000 $15,000.000 $4,671.090 $25,000.000 $13,000.000 $25,000.000
SANDBAGS FOR EROSION CONTROL
EA 1,340.000 $6.500 $5.260 $12.500 $8.600 $3.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 220.000 $3.000 $3.920 $4.200 $4.000 $10.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 220.000 $1.000 $4.000 $1.050 $1.250 $4.000
CONSTRUCTING DETOURS
SY 1,733.000 $20.000 $3.070 $6.300 $6.000 $12.000
DRIVEWAYS (CONC)
SY 34.000 $80.000 $126.350 $155.000 $215.000 $210.000
RUMBLE STRIPS (SHOULDER)
LF 118,197.000 $0.200 $0.110 $0.100 $0.210 $0.180
RUMBLE STRIPS (CENTERLINE)
LF 57,300.000 $0.220 $0.250 $0.190 $0.300 $0.250
MTL W-BEAM GD FEN (STEEL POST)
LF 300.000 $23.000 $22.110 $26.000 $26.350 $22.000
MTL THRIE-BEAM GD FEN (STEEL POST)
EA 4.000 $1,500.000 $1,526.720 $23.000 $23.200 $1,450.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $2,300.000 $2,095.290 $2,900.000 $2,900.000 $1,990.000
INSTL OM ASSM (OM-2Z)(FLX)GND(BI)
EA 44.000 $50.000 $57.910 $145.000 $145.000 $55.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 6.000 $20.000 $21.060 $42.000 $42.000 $20.000
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
LF 2,400.000 $0.300 $0.150 $0.150 $0.150 $0.140
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 236,394.000 $0.200 $0.150 $0.150 $0.150 $0.140
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
LF 26,210.000 $0.300 $0.150 $0.150 $0.150 $0.140
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 54,474.000 $0.200 $0.150 $0.150 $0.150 $0.140
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 720.000 $1.500 $0.820 $1.050 $1.100 $1.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 10,526.000 $2.000 $0.850 $1.050 $1.150 $1.000
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 490.000 $0.920 $0.590 $0.590 $0.590 $1.000
RE PM W/RET REQ TY I (W)4"(BRK)(090MIL)
LF 1,200.000 $0.360 $0.290 $0.290 $0.300 $1.000
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
LF 118,197.000 $0.360 $0.290 $0.290 $0.300 $0.280
RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL)
LF 13,105.000 $0.360 $0.290 $0.290 $0.290 $0.280
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
LF 27,237.000 $0.360 $0.290 $0.290 $0.300 $0.280
REFL PAV MRKR TY II-A-A
EA 1,467.000 $2.600 $3.690 $3.650 $3.690 $4.000
STRIP MOWING
CYC 2.000 $2,000.000 $2,967.240 $5,200.000 $4,835.000 $1,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 60.000 $120.000 $57.910 $155.000 $325.000 $300.000
TMA (STATIONARY)
EA 2.000 $50,000.000 $39,484.010 $1,300.000 $32,200.000 $50,000.000
Totals: $10,520,730.290 $8,589,407.730 $8,666,814.160 $8,905,209.750 $10,672,015.550