CROCKETT US 190 (2279-02-019)

Items: 71

County: CROCKETT
Length: N/A
Highway: US 190
District: SAN ANGELO
Control Number: 2279-02-019
DBE Goal: N/A
Project: STP 1902(009)
Guaranty: N/A
Time: 234 WORKING DAYS
Engineer's Estimate: $2,500,861.88
Date: 06/04/2019 (7 years ago)
Contract Number: N/A
Type: REPLACE BRIDGE AND APPROACHES
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (4)
E
Engineer's Estimate
$2,500,861.88
$2,965,511.05
Over/Under Est: 18.58% $464,649.17
Over/Under Est: 38.53% $963,677.12
Amt Left: 16.83% $499,027.95
$3,951,926.20
Over/Under Est: 58.02% $1,451,064.32
Amt Left: 33.26% $986,415.15
Delta: -14.07% -$487,387.20
$3,959,791.81
Over/Under Est: 58.34% $1,458,929.93
Amt Left: 33.53% $994,280.76
Delta: -0.20% -$7,865.61

Bid Items & Bid Tabulations

71 Total 0 of 71
CROCKETT  |  US 190  |  SAN ANGELO  |  2279-02-019  |  06/04/2019  |  $2,500,861.88  |  STP 1902(009)  |  REPLACE BRIDGE AND APPROACHES  |  234 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
STATELINE CONSTRUCTION, LLC
HODGES AND SON CONSTRUCTION COMPANY, INC.
EARTH BUILDERS, L.P.
RELMCO, INC.
PREPARING ROW
STA 21.900 $1,000.000 $9,500.000 $5,300.000 $7,000.000 $6,500.000
REMOVING CONC (RIPRAP)
SY 540.000 $25.000 $12.000 $20.000 $20.000 $40.000
EXCAVATION (ROADWAY)
CY 360.000 $15.000 $22.000 $30.000 $25.000 $30.000
EXCAVATION (CHANNEL)
CY 828.000 $20.000 $31.000 $20.000 $20.000 $45.000
EMBANKMENT (FINAL)(DENS CONT)(TY B)
CY 4,524.000 $15.000 $16.000 $30.000 $35.000 $42.000
BROADCAST SEED (TEMP) (WARM)
SY 5,316.000 $0.150 $1.000 $1.000 $0.800 $0.500
BROADCAST SEED (TEMP) (COOL)
SY 5,316.000 $0.150 $1.000 $1.000 $0.800 $0.500
DRILL SEEDING (PERM) (RURAL) (SANDY)
SY 10,632.000 $0.250 $0.650 $1.000 $0.800 $1.000
SOIL RETENTION BLANKETS (CL 1) (TY C)
SY 2,510.000 $1.750 $1.950 $2.000 $4.000 $3.000
FL BS (CMP IN PLACE)(TY A GR 1-2)(10")
SY 3,995.000 $25.000 $33.000 $40.000 $50.000 $40.000
ASPH (AC-20-5TR)
GAL 4,881.000 $5.000 $14.000 $10.000 $6.000 $8.000
ASPH (RC-250)
GAL 880.000 $5.000 $14.000 $10.000 $10.000 $12.000
AGGR(TY-PB GR-3 SAC-B)
CY 47.000 $140.000 $400.000 $700.000 $400.000 $450.000
AGGR(TY-PB GR-4 SAC-B)
CY 72.000 $85.000 $400.000 $600.000 $400.000 $260.000
AGGR(TY-PB GR-5 SAC-B)
CY 29.000 $125.000 $400.000 $700.000 $400.000 $700.000
CEM STABIL BKFL
CY 144.000 $140.000 $225.000 $250.000 $250.000 $185.000
TEMPORARY SPL SHORING
SF 449.000 $15.000 $32.000 $50.000 $25.000 $65.000
DRILL SHAFT (18 IN)
LF 128.000 $250.000 $135.000 $220.000 $150.000 $125.000
DRILL SHAFT (36 IN)
LF 764.000 $210.000 $362.000 $340.000 $435.000 $450.000
CL C CONC (ABUT)
CY 58.600 $1,300.000 $1,050.000 $2,500.000 $1,800.000 $1,491.100
CL C CONC (CAP)
CY 64.500 $1,550.000 $1,125.000 $2,500.000 $1,800.000 $1,500.200
CL C CONC (COLUMN)
CY 43.800 $1,250.000 $1,125.000 $2,000.000 $1,800.000 $1,826.500
REINF CONC SLAB
SF 15,040.000 $25.500 $18.250 $30.000 $30.000 $35.000
APPROACH SLAB
CY 72.200 $600.000 $625.000 $900.000 $800.000 $650.000
PRESTR CONC GIRDER (TX34)
LF 1,908.000 $170.000 $215.000 $190.000 $160.000 $195.000
RIPRAP (CONC)(5 IN)
CY 159.000 $650.000 $460.000 $800.000 $700.000 $625.000
RIPRAP (MOW STRIP)(4 IN)
CY 4.000 $750.000 $425.000 $1,000.000 $1,000.000 $2,500.000
RAIL (TY SSTR)
LF 692.000 $100.000 $115.000 $120.000 $140.000 $70.000
SEALED EXPANSION JOINT (4 IN) (SEJ - A)
LF 141.000 $80.000 $90.000 $80.000 $150.000 $90.000
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
EA 1.000 $75,000.000 $36,000.000 $100,000.000 $450,000.000 $300,000.000
REMOV STR (SMALL FENCE)
LF 71.000 $5.000 $15.000 $10.000 $10.000 $30.000
REMOV STR (PIPE GATE)
LF 14.000 $50.000 $100.000 $110.000 $10.000 $150.000
MOBILIZATION
LS 1.000 $227,351.080 $290,000.000 $300,000.000 $390,000.000 $375,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 13.000 $10,000.000 $6,500.000 $2,000.000 $2,500.000 $9,500.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 28.000 $50.000 $32.000 $40.000 $60.000 $30.000
ROCK FILTER DAMS (REMOVE)
LF 28.000 $15.000 $12.000 $20.000 $10.000 $25.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 156.000 $30.000 $32.000 $10.000 $35.000 $35.000
CONSTRUCTION EXITS (REMOVE)
SY 156.000 $8.000 $15.000 $5.000 $10.000 $15.000
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 3,128.000 $5.000 $6.000 $4.000 $8.000 $9.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 3,128.000 $1.000 $2.000 $2.000 $1.000 $5.000
ONE-WAY TRAF CONT (PORT TRAF SIG)
MO 15.000 $3,000.000 $2,550.000 $5,000.000 $10,000.000 $3,500.000
PTB(FRN&INSTL)(SSCB OR CSB)(TY1)OR(STL)
LF 1,050.000 $50.000 $95.000 $70.000 $90.000 $105.000
PTB(MOVE)(SSCB OR CSB)(TY1)OR(STL)
LF 935.000 $10.000 $16.000 $30.000 $15.000 $12.000
PTB(REMOVE)(SSCB OR CSB)(TY1)OR(STL)
LF 1,050.000 $20.000 $16.000 $40.000 $15.000 $25.000
MTL W-BEAM GD FEN (STEEL POST)
LF 400.000 $25.000 $29.000 $30.000 $30.000 $30.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $1,850.000 $1,900.000 $1,200.000 $1,600.000 $1,500.000
REMOVE METAL BEAM GUARD FENCE
LF 500.000 $5.000 $3.000 $5.000 $3.000 $4.000
REMOVE TERMINAL ANCHOR SECTION
EA 2.000 $300.000 $300.000 $800.000 $200.000 $300.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $2,750.000 $2,950.000 $2,800.000 $2,800.000 $2,800.000
GUARDRAIL END TREATMENT (REMOVE)
EA 2.000 $300.000 $300.000 $1,000.000 $200.000 $900.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 2.000 $2,000.000 $2,500.000 $5,000.000 $2,000.000 $2,000.000
CRASH CUSH ATTEN (REMOVE)
EA 2.000 $250.000 $2,500.000 $5,000.000 $600.000 $1,000.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 2.000 $10,000.000 $28,500.000 $20,000.000 $9,000.000 $12,500.000
WIRE FENCE (TY C)
LF 69.000 $15.000 $22.000 $30.000 $20.000 $40.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 6.000 $700.000 $800.000 $600.000 $500.000 $300.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 5.000 $800.000 $800.000 $600.000 $600.000 $300.000
REMOVE SM RD SN SUP&AM
EA 17.000 $100.000 $200.000 $200.000 $65.000 $100.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 8.000 $25.000 $22.000 $80.000 $12.000 $30.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 8.000 $27.000 $35.000 $60.000 $12.000 $30.000
WK ZN PAV MRK REMOV (REFL) TY II-A-A
EA 60.000 $4.000 $5.000 $25.000 $21.000 $22.000
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 3,805.000 $0.700 $1.000 $2.000 $2.500 $1.320
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 24.000 $15.000 $1.000 $20.000 $21.000 $22.000
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 2,400.000 $0.700 $1.000 $2.000 $2.500 $1.320
REF PROF PAV MRK TY I(W)4"(SLD)(100MIL)
LF 7,430.000 $0.750 $1.500 $2.000 $2.200 $1.650
REF PROF PAV MRK TY I(Y)4"(SLD)(100MIL)
LF 7,430.000 $0.750 $1.500 $2.000 $2.200 $1.650
REFL PAV MRKR TY II-A-A
EA 93.000 $3.000 $5.000 $25.000 $21.000 $11.000
ELIM EXT PAV MRK & MRKS (4")
LF 1,911.000 $1.000 $0.750 $2.000 $3.500 $1.650
TEMP TRAF SIGNALS
EA 1.000 $50,000.000 $45,000.000 $25,000.000 $100,000.000 $150,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 668.000 $90.000 $95.000 $95.000 $75.000 $150.000
TMA (STATIONARY)
DAY 240.000 $200.000 $175.000 $300.000 $300.000 $200.000
TMA (MOBILE OPERATION)
HR 32.000 $50.000 $550.000 $30.000 $120.000 $100.000
Totals: $2,500,861.880 $2,965,511.050 $3,464,539.000 $3,951,926.200 $3,959,791.810