CROCKETT US 190 (0558-10-042)

Items: 53

County: CROCKETT
Length: N/A
Highway: US 190
District: SAN ANGELO
Control Number: 0558-10-042
DBE Goal: N/A
Project: STP 2022(879)HES
Guaranty: N/A
Time: 152 WORKING DAYS
Engineer's Estimate: $1,349,210.53
Date: 03/07/2023 (3 years ago)
Contract Number: N/A
Type: INTERSECTION IMPROVEMENT
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (2)
E
Engineer's Estimate
$1,349,210.53
$2,124,528.00
Over/Under Est: 57.46% $775,317.47
$3,974,776.25
Over/Under Est: 194.6% $2,625,565.72
Amt Left: 87.09% $1,850,248.25
Subcontractor Percentage Amount
DK CONTRACTING, LLC 7.69% $183,501.05
TRP CONSTRUCTION GROUP, LLC 2.53% $60,371.61
J. H. ODEN CONTRACTING COMPANY 1.66% $39,611.41
BARRICADES UNLIMITED 0.74% $17,658.10
BEAVER BOYS SERVICES LLC 0.44% $10,499.41
FIBERTEX, LLC 0.31% $7,397.31
Total: 13.37% $319,038.89

Bid Items & Bid Tabulations

53 Total 0 of 53
CROCKETT  |  US 190  |  SAN ANGELO  |  0558-10-042  |  03/07/2023  |  $1,349,210.53  |  STP 2022(879)HES  |  INTERS IMPRV  |  152 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
CK NEWBERRY, LLC
RK HALL, LLC
PREPARING ROW
STA 69.000 $2,000.000 $500.000 $3,314.440
REMOVING STAB BASE AND ASPH PAV(8")
SY 8,993.000 $6.000 $10.000 $8.200
OBLITERATING ABANDONED ROAD
STA 21.000 $1,750.000 $500.000 $2,354.450
EXCAVATION (ROADWAY)
CY 4,510.000 $10.000 $25.000 $76.900
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 1,332.000 $20.000 $16.000 $84.680
DRILL SEEDING (PERM) (RURAL) (CLAY)
SY 8,953.000 $0.200 $1.000 $0.980
PROOF ROLLING
HR 12.000 $80.000 $70.000 $161.890
FL BS (CMP IN PLC)(TY A GR 1-2)(18")
SY 11,797.000 $25.000 $58.000 $71.030
PRIME COAT (MC-30)
GAL 2,359.000 $5.000 $7.000 $10.910
AGGR(TY-PB GR-3 SAC-B)
CY 348.000 $115.000 $200.000 $513.070
AGGR(TY-PB GR-4 SAC-B)
CY 293.000 $115.000 $225.000 $581.540
ASPH (AC-20-5TR OR AC-20XP)
GAL 19,557.000 $4.000 $5.000 $6.640
MOBILIZATION
LS 1.000 $96,809.000 $200,000.000 $397,400.280
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 9.000 $7,500.000 $10,000.000 $17,840.140
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 112.000 $23.980 $20.000 $109.560
CONSTRUCTION EXITS (REMOVE)
SY 112.000 $7.520 $10.000 $87.390
SANDBAGS FOR EROSION CONTROL
EA 30.000 $9.730 $35.000 $271.420
TEMP SEDMT CONT FENCE (INSTALL)
LF 3,940.000 $2.730 $7.000 $10.240
TEMP SEDMT CONT FENCE (REMOVE)
LF 3,940.000 $0.670 $2.000 $4.690
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 350.000 $4.500 $10.000 $15.600
BIODEG EROSN CONT LOGS (REMOVE)
LF 350.000 $1.150 $2.000 $4.690
CONSTRUCTING DETOURS
SY 1,674.000 $62.170 $125.000 $355.910
CONDT (PVC) (SCH 40) (2")
LF 192.000 $20.000 $30.000 $26.400
ELEC CONDR (NO.10) INSULATED
LF 384.000 $1.750 $6.000 $5.500
ALUMINUM SIGNS (TY A)
SF 104.000 $38.000 $35.000 $33.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 19.000 $675.000 $1,000.000 $932.800
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 6.000 $800.000 $1,400.000 $1,266.100
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 24.000 $1,050.000 $1,500.000 $1,414.600
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
EA 2.000 $1,150.000 $1,800.000 $1,691.800
REMOVE SM RD SN SUP&AM
EA 50.000 $150.000 $250.000 $227.910
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 8,257.000 $0.300 $1.000 $2.750
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 133.000 $2.500 $12.000 $13.200
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 4,599.000 $0.300 $1.000 $2.750
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 32.000 $3.000 $5.000 $4.190
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 1,549.000 $0.350 $1.500 $3.300
REFL PAV MRK TY I (W)24"(SLD)(090MIL)
LF 31.000 $8.000 $18.000 $33.000
REFL PAV MRK TY II (W) 4" (SLD)
LF 11,746.000 $0.150 $0.500 $0.330
REFL PAV MRK TY II (Y) 4" (SLD)
LF 16,789.000 $0.150 $0.500 $0.330
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
LF 11,746.000 $0.350 $1.000 $1.650
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
LF 16,789.000 $0.350 $1.000 $1.650
PREFAB PAV MRK TY C (W) (ARROW)
EA 4.000 $250.000 $300.000 $440.000
PREFAB PAV MRK TY C (W) (WORD)
EA 4.000 $300.000 $350.000 $550.000
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
EA 12.000 $35.000 $80.000 $126.500
REFL PAV MRKR TY I-C
EA 84.000 $4.000 $8.000 $13.200
REFL PAV MRKR TY II-A-A
EA 533.000 $4.000 $8.000 $9.900
REFL PAV MRKR TY II-C-R
EA 11.000 $4.000 $8.000 $27.500
VEH SIG SEC (12")LED(YEL)
EA 12.000 $275.000 $500.000 $419.100
VEH SIG SEC (12")LED(RED)
EA 4.000 $275.000 $500.000 $443.300
INSTL RDSD FLSH BCN ASSM (SOLAR PWRD)
EA 8.000 $11,500.000 $15,000.000 $13,368.300
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 620.000 $100.000 $40.000 $194.310
PREFORMED IN-LANE(TRANS) RUMBLE STRIP
LF 320.000 $13.000 $12.000 $13.200
TMA (STATIONARY)
DAY 252.000 $200.000 $200.000 $482.720
TMA (MOBILE OPERATION)
DAY 5.000 $250.000 $250.000 $682.200
Totals: $1,349,210.530 $2,124,528.000 $3,974,776.250