Show Job Controls
Bid Cobra

CORYELL FM0185 (6377-87-001)

Items: 36

County: CORYELL
Length: N/A
Highway: FM0185
District: WACO
Control Number: 6377-87-001
DBE Goal: N/A
Project: RMC - 637787001
Guaranty: N/A
Time: 365 CALENDAR DAYS
Engineer's Estimate: $482,592.60
Date: 08/05/2021 (4 years ago)
Contract Number: N/A
Type: CULVERT REPAIR
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Documents:
Bidders (3)
E
Engineer's Estimate
$482,592.60
$486,782.00
Over/Under Est: 0.87% $4,189.40
Over/Under Est: 21.57% $104,084.40
Amt Left: 20.52% $99,895.00
Over/Under Est: 71.16% $343,433.40
Amt Left: 69.69% $339,244.00
Delta: -40.80% -$239,349.00

Bid Items & Bid Tabulations

36 Total 0 of 36
CORYELL  |  FM0185  |  WACO  |  6377-87-001  |  08/05/2021  |  $482,592.60  |  RMC - 637787001  |  CULVERT REPAIR  |  365 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
CROSS PLUS CONSTRUCTION, LLC
SJ&J CONSTRUCTION, LLC
HODGES AND SON CONSTRUCTION COMPANY, INC.
REMOVING CONC (RIPRAP)
SY 80.000 $20.000 $15.000 $20.000 $250.000
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 147.000 $20.000 $30.000 $25.000 $100.000
BLOCK SODDING
SY 180.000 $5.000 $5.000 $6.000 $20.000
VEGETATIVE WATERING
MG 6.000 $40.000 $100.000 $10.000 $1.000
CEM STABIL BKFL
CY 314.000 $150.000 $200.000 $180.000 $250.000
CUT & RESTORE ASPH PAVING
SY 200.000 $150.000 $175.000 $110.000 $250.000
FLOWABLE BACKFILL
CY 20.000 $220.000 $355.000 $180.000 $250.000
TRENCH EXCAVATION PROTECTION
LF 216.000 $20.000 $15.000 $12.000 $20.000
PNEUMATICALLY PLACED CONC (REPAIR)
CF 8.000 $400.000 $500.000 $100.000 $500.000
RIPRAP (CONC)(5 IN)
CY 75.000 $400.000 $400.000 $650.000 $650.000
RIPRAP (CONC)(CL B)
CY 70.000 $400.000 $400.000 $650.000 $650.000
RIPRAP (STONE PROTECTION)(12 IN)
CY 60.000 $180.000 $275.000 $160.000 $200.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 100.000 $180.000 $275.000 $180.000 $200.000
RIPRAP (STONE PROTECTION)(24 IN)
CY 50.000 $210.000 $275.000 $220.000 $300.000
RC PIPE (CL III)(18 IN)
LF 40.000 $100.000 $99.000 $90.000 $100.000
RC PIPE (CL III)(30 IN)
LF 98.000 $140.000 $156.000 $130.000 $150.000
RC PIPE (CL III)(36 IN)
LF 210.000 $150.000 $185.000 $200.000 $190.000
RC PIPE (CL III)(42 IN)
LF 90.000 $190.000 $225.000 $300.000 $220.000
RC PIPE (CL III)(48 IN)
LF 144.000 $210.000 $225.000 $400.000 $300.000
SET (TY II) (18 IN) (RCP) (3: 1) (C)
EA 4.000 $1,200.000 $1,500.000 $950.000 $2,000.000
SET (TY II) (30 IN) (CMP) (3: 1) (C)
EA 6.000 $3,000.000 $2,000.000 $3,000.000 $3,000.000
SET (TY II) (36 IN) (RCP) (4: 1) (C)
EA 6.000 $3,500.000 $3,900.000 $3,500.000 $6,000.000
SET (TY II) (42 IN) (RCP) (3: 1) (C)
EA 4.000 $4,000.000 $4,200.000 $4,000.000 $10,000.000
SET (TY II) (48 IN) (RCP) (3: 1) (C)
EA 4.000 $4,500.000 $4,300.000 $5,500.000 $10,000.000
REMOV & RE - LAY PIPE (42 IN)
LF 16.000 $80.000 $50.000 $150.000 $200.000
REMOV STR (PIPE)
LF 447.000 $15.000 $50.000 $30.000 $50.000
MOBILIZATION (CALLOUT)
EA 4.000 $8,936.900 $1.000 $5,000.000 $20,000.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 200.000 $30.000 $1.000 $18.000 $45.000
ROCK FILTER DAMS (REMOVE)
LF 200.000 $8.000 $1.000 $12.000 $20.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 900.000 $3.000 $1.000 $3.000 $4.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 900.000 $2.000 $1.000 $1.000 $2.000
DITCH CLEANING AND RESHAPING (FOOT)
LF 900.000 $4.000 $6.000 $5.000 $40.000
THERMOPLASTIC PIPE (24 IN)(PP)(TYPE I)
LF 350.000 $50.000 $50.000 $90.000 $70.000
THERMOPLASTIC PIPE (18 IN)(PP)(TYPE I)
LF 350.000 $40.000 $49.000 $80.000 $50.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 115.000 $60.000 $1.000 $150.000 $115.000
TMA (STATIONARY)
DAY 115.000 $160.000 $1.000 $100.000 $225.000
Totals: $482,592.600 $486,782.000 $586,677.000 $826,026.000