PREPARING ROW
|
STA
|
20.900
|
$4,262.000
|
$4,350.000
|
$6,277.600
|
|
|
REMOV STAB BASE AND ASPH PAV (10"-18")
|
SY
|
4,890.000
|
$10.000
|
$6.000
|
$13.080
|
|
|
REMOVING STAB BASE & ASP PAV (18"-24")
|
SY
|
1,506.000
|
$10.000
|
$9.750
|
$17.550
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
831.000
|
$20.000
|
$31.000
|
$69.210
|
|
|
EXCAVATION (CHANNEL)
|
CY
|
568.000
|
$10.000
|
$42.000
|
$78.560
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY B)
|
CY
|
3,384.000
|
$15.000
|
$24.000
|
$37.950
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
8,403.000
|
$1.000
|
$1.500
|
$3.210
|
|
|
BROADCAST SEED (PERM) (RURAL) (CLAY)
|
SY
|
8,403.000
|
$2.300
|
$1.000
|
$1.310
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
4,202.000
|
$0.970
|
$1.160
|
$1.680
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
4,202.000
|
$0.580
|
$1.160
|
$1.680
|
|
|
VEGETATIVE WATERING
|
MG
|
136.000
|
$43.000
|
$25.000
|
$34.370
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY B)
|
SY
|
8,403.000
|
$4.000
|
$1.750
|
$2.180
|
|
|
FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS)
|
CY
|
1,776.000
|
$67.000
|
$75.000
|
$93.920
|
|
|
PRIME COAT(MC-30 OR AE-P)
|
GAL
|
1,253.000
|
$6.000
|
$9.500
|
$8.710
|
|
|
ASPH (CRS-2P)
|
GAL
|
3,759.000
|
$8.000
|
$5.500
|
$8.710
|
|
|
AGGR(TY D GR 3 OR TY L GR 3)
|
CY
|
67.000
|
$500.000
|
$400.000
|
$943.940
|
|
|
CEM STABIL BKFL
|
CY
|
274.000
|
$264.000
|
$295.000
|
$301.080
|
|
|
DRILL SHAFT (24 IN)
|
LF
|
705.000
|
$228.000
|
$310.000
|
$239.810
|
|
|
CL C CONC (ABUT)(HPC)
|
CY
|
66.800
|
$1,200.000
|
$1,850.000
|
$1,857.600
|
|
|
CL C CONC (CAP)(HPC)
|
CY
|
41.300
|
$1,300.000
|
$2,000.000
|
$2,973.890
|
|
|
CL C CONC (COLUMN)(HPC)
|
CY
|
16.200
|
$1,180.000
|
$2,250.000
|
$5,599.560
|
|
|
REINF CONC SLAB (SLAB BEAM)
|
SF
|
10,278.000
|
$26.000
|
$25.000
|
$35.620
|
|
|
APPROACH SLAB
|
CY
|
165.200
|
$637.000
|
$700.000
|
$904.590
|
|
|
PRESTR CONC SLAB BEAM (4SB12)
|
LF
|
1,736.000
|
$244.000
|
$215.000
|
$293.950
|
|
|
PRESTR CONC SLAB BEAM (4SB15)
|
LF
|
791.380
|
$255.000
|
$225.000
|
$262.270
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
2,340.000
|
$227.000
|
$148.000
|
$186.270
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
109.000
|
$626.000
|
$700.000
|
$623.240
|
|
|
RAIL (TY T223)
|
LF
|
228.000
|
$168.000
|
$170.000
|
$123.100
|
|
|
RAIL (TY SSTR)
|
LF
|
488.000
|
$95.000
|
$170.000
|
$136.370
|
|
|
ARMOR JOINT (SEALED)
|
LF
|
178.000
|
$152.000
|
$130.000
|
$128.310
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
50.000
|
$80.000
|
$110.000
|
$134.580
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
80.000
|
$99.000
|
$125.000
|
$178.850
|
|
|
RC PIPE (ARCH)(CL III)(DES 1)
|
LF
|
50.000
|
$189.000
|
$245.000
|
$256.870
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$1,343.000
|
$1,500.000
|
$2,607.700
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
4.000
|
$1,832.000
|
$2,000.000
|
$2,832.090
|
|
|
SET (TY II) (DES 1) (RCP) (6: 1) (P)
|
EA
|
4.000
|
$2,038.000
|
$2,000.000
|
$2,323.130
|
|
|
REMOV STR (SET)
|
EA
|
2.000
|
$661.000
|
$750.000
|
$650.960
|
|
|
REMOV STR (PIPE)
|
LF
|
77.000
|
$21.000
|
$50.000
|
$32.510
|
|
|
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
|
EA
|
2.000
|
$30,990.000
|
$35,000.000
|
$18,332.400
|
|
|
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
|
EA
|
1.000
|
$96,990.000
|
$42,000.000
|
$36,664.800
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$650,000.000
|
$350,000.000
|
$225,225.900
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
18.000
|
$9,500.000
|
$3,450.000
|
$3,607.990
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
503.000
|
$50.000
|
$42.000
|
$58.810
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
503.000
|
$10.000
|
$12.000
|
$43.570
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
4,435.000
|
$4.000
|
$7.000
|
$5.080
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
4,435.000
|
$1.000
|
$1.150
|
$1.450
|
|
|
DRIVEWAYS (ACP)
|
SY
|
366.000
|
$45.000
|
$95.000
|
$146.540
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
975.000
|
$29.000
|
$35.000
|
$42.840
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
12.000
|
$2,452.000
|
$3,500.000
|
$3,485.310
|
|
|
SHORT RADIUS
|
LF
|
72.000
|
$101.000
|
$35.000
|
$43.570
|
|
|
DRIVEWAY TERMINAL ANCHOR SECTION
|
EA
|
1.000
|
$927.000
|
$950.000
|
$1,161.770
|
|
|
MTL BM GD FEN TRANS (31"-28")(25')
|
EA
|
1.000
|
$549.700
|
$1,000.000
|
$1,270.690
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
11.000
|
$3,106.000
|
$3,400.000
|
$4,284.030
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(P)
|
EA
|
2.000
|
$483.000
|
$1,750.000
|
$649.140
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
18.000
|
$22.000
|
$35.000
|
$43.350
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
66.000
|
$4.000
|
$30.000
|
$77.970
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
4,240.000
|
$1.000
|
$3.750
|
$1.580
|
|
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
|
LF
|
716.000
|
$1.000
|
$0.180
|
$1.580
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
3,524.000
|
$1.000
|
$3.750
|
$1.580
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
55.000
|
$11.000
|
$29.000
|
$10.890
|
|
|
D-GR HMA TY-C SAC-B PG64-22 (EXEMPT)
|
TON
|
689.000
|
$575.000
|
$175.000
|
$252.690
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
168.000
|
$131.000
|
$100.000
|
$78.830
|
|
Totals: |
$4,205,680.800
|
$3,507,187.520
|
$4,150,750.000
|