PREPARING ROW
|
STA
|
50.000
|
$90.000
|
$1,500.000
|
$22,875.000
|
$895.000
|
$1,000.000
|
$2,543.670
|
|
|
REMOVING STAB BASE & ASPH PAV (8"-10")
|
SY
|
32,185.000
|
$6.000
|
$5.000
|
$3.270
|
$3.500
|
$5.240
|
$5.940
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
66,511.000
|
$13.500
|
$8.000
|
$3.550
|
$5.500
|
$18.000
|
$17.310
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY B)
|
CY
|
122,470.000
|
$16.000
|
$12.500
|
$9.500
|
$12.650
|
$12.000
|
$19.220
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
56,683.000
|
$1.300
|
$1.000
|
$0.350
|
$3.000
|
$2.250
|
$0.930
|
|
|
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
|
SY
|
56,683.000
|
$0.400
|
$0.350
|
$0.320
|
$0.320
|
$0.340
|
$0.410
|
|
|
DRILL SEED (TEMP)(WARM OR COOL)
|
SY
|
56,683.000
|
$0.200
|
$0.100
|
$0.100
|
$0.100
|
$0.110
|
$0.110
|
|
|
VEGETATIVE WATERING
|
MG
|
2,817.600
|
$25.000
|
$12.000
|
$22.880
|
$0.010
|
$20.000
|
$1.270
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY A)
|
SY
|
23,788.000
|
$1.250
|
$1.250
|
$0.880
|
$0.880
|
$1.250
|
$1.270
|
|
|
PROOF ROLLING
|
HR
|
13.000
|
$70.000
|
$125.000
|
$102.970
|
$160.000
|
$75.000
|
$108.690
|
|
|
FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS)
|
CY
|
11,443.000
|
$50.000
|
$44.000
|
$48.440
|
$59.850
|
$49.500
|
$49.290
|
|
|
LIME (HYD, COM, OR QK(SLURRY))
|
TON
|
307.000
|
$180.000
|
$200.000
|
$188.000
|
$188.000
|
$150.000
|
$241.550
|
|
|
LIME TRT (SUBGRADE)(8")
|
SY
|
12,782.000
|
$3.000
|
$3.500
|
$11.650
|
$9.200
|
$3.000
|
$6.580
|
|
|
PRIME COAT(MC-30 OR AE-P)
|
GAL
|
7,938.000
|
$4.000
|
$4.000
|
$3.500
|
$4.200
|
$3.800
|
$4.320
|
|
|
PLANE ASPH CONC PAV (2")
|
SY
|
29,411.000
|
$2.000
|
$2.000
|
$1.300
|
$2.400
|
$1.940
|
$3.050
|
|
|
CONC PVMT (CONT REINF) (FAST TRK) (9")
|
SY
|
12,126.000
|
$175.000
|
$87.000
|
$71.710
|
$115.000
|
$92.000
|
$83.090
|
|
|
CEM STABIL BKFL
|
CY
|
1,080.000
|
$150.000
|
$125.000
|
$116.610
|
$180.000
|
$171.000
|
$66.040
|
|
|
CUT & RESTORE ASPH PAVING
|
SY
|
76.000
|
$100.000
|
$100.000
|
$40.410
|
$223.390
|
$135.000
|
$103.180
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
772.000
|
$15.000
|
$8.000
|
$2.670
|
$1.000
|
$6.500
|
$3.660
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
620.000
|
$200.000
|
$200.000
|
$177.200
|
$250.000
|
$220.000
|
$237.190
|
|
|
DRILL SHAFT (RDWY ILL POLE) (30 IN)
|
LF
|
90.000
|
$260.000
|
$300.000
|
$275.000
|
$275.000
|
$360.000
|
$267.090
|
|
|
DRILL SHAFT (TRF SIG POLE) (30 IN)
|
LF
|
36.000
|
$400.000
|
$300.000
|
$275.000
|
$275.000
|
$386.000
|
$305.240
|
|
|
CL B CONC (FLUME)
|
CY
|
17.800
|
$800.000
|
$650.000
|
$1,500.000
|
$520.000
|
$700.000
|
$575.180
|
|
|
CL C CONC (ABUT)(HPC)
|
CY
|
103.600
|
$975.000
|
$1,250.000
|
$1,500.000
|
$1,800.000
|
$805.000
|
$1,391.340
|
|
|
CL C CONC (CAP)(HPC)
|
CY
|
71.000
|
$1,000.000
|
$1,250.000
|
$1,500.000
|
$2,100.000
|
$1,105.000
|
$1,848.510
|
|
|
CL C CONC (COLUMN)(HPC)
|
CY
|
166.800
|
$1,000.000
|
$1,250.000
|
$1,500.000
|
$2,500.000
|
$1,725.000
|
$1,387.240
|
|
|
REINF CONC SLAB
|
SF
|
19,600.000
|
$16.000
|
$17.000
|
$33.000
|
$26.000
|
$20.000
|
$46.710
|
|
|
APPROACH SLAB
|
CY
|
122.000
|
$500.000
|
$750.000
|
$538.080
|
$770.000
|
$520.000
|
$2,649.860
|
|
|
RETAINING WALL (TEMP WALL)
|
SF
|
12,693.000
|
$30.000
|
$16.000
|
$16.460
|
$17.000
|
$25.000
|
$24.980
|
|
|
PRESTR CONC GIRDER (TX40)
|
LF
|
2,436.000
|
$150.000
|
$150.000
|
$138.690
|
$190.000
|
$170.000
|
$233.960
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
16.000
|
$450.000
|
$550.000
|
$492.080
|
$510.000
|
$425.000
|
$358.770
|
|
|
RIPRAP (CONC)(CL B)
|
CY
|
5.250
|
$500.000
|
$750.000
|
$1,296.090
|
$510.000
|
$850.000
|
$472.180
|
|
|
RIPRAP (CONC)(CL B)(RR8&RR9)
|
CY
|
512.000
|
$500.000
|
$450.000
|
$288.760
|
$490.000
|
$500.000
|
$350.380
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
149.000
|
$500.000
|
$550.000
|
$455.090
|
$510.000
|
$500.000
|
$358.770
|
|
|
RAIL (TY SSTR)
|
LF
|
1,060.000
|
$40.000
|
$65.000
|
$49.170
|
$91.970
|
$79.000
|
$51.120
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
|
LF
|
156.000
|
$120.000
|
$130.000
|
$110.400
|
$179.690
|
$153.000
|
$115.830
|
|
|
CONC BOX CULV (3 FT X 2 FT)
|
LF
|
152.000
|
$228.400
|
$275.000
|
$245.260
|
$335.000
|
$310.000
|
$345.780
|
|
|
CONC BOX CULV (4 FT X 2 FT)(EXTEND)
|
LF
|
40.000
|
$500.000
|
$500.000
|
$313.700
|
$400.000
|
$690.000
|
$566.180
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
1,211.000
|
$100.000
|
$70.000
|
$65.240
|
$62.000
|
$100.000
|
$64.270
|
|
|
INLET (COMPL)(PCO)(3FT)(BOTH)
|
EA
|
8.000
|
$6,500.000
|
$6,000.000
|
$7,221.040
|
$6,000.000
|
$5,200.000
|
$7,405.830
|
|
|
INLET(COMPL)(PAZD)(FG)(4FTX4FT-4FTX4FT)
|
EA
|
2.000
|
$100.000
|
$6,500.000
|
$5,328.410
|
$6,925.000
|
$6,600.000
|
$10,914.510
|
|
|
SET (TY I)(S=3 FT)(HW=3FT)(4:1)(C)
|
EA
|
1.000
|
$7,000.000
|
$5,500.000
|
$8,505.590
|
$8,000.000
|
$9,400.000
|
$11,985.200
|
|
|
SET (TY I)(S=3 FT)(HW= 3 FT)(6:1)(C)
|
EA
|
1.000
|
$7,000.000
|
$8,000.000
|
$9,533.010
|
$8,500.000
|
$9,500.000
|
$12,871.450
|
|
|
SET (TY I)(S= 4 FT)(HW= 3 FT)(3:1) (C)
|
EA
|
2.000
|
$6,000.000
|
$6,500.000
|
$8,583.850
|
$9,600.000
|
$9,000.000
|
$10,482.350
|
|
|
SET (TY I)(S= 4 FT)(HW= 3 FT)(6:1) (P)
|
EA
|
2.000
|
$7,000.000
|
$10,000.000
|
$10,487.030
|
$8,300.000
|
$11,300.000
|
$12,157.790
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
2.000
|
$1,250.000
|
$900.000
|
$1,300.400
|
$1,300.000
|
$1,500.000
|
$1,895.030
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (C)
|
EA
|
2.000
|
$1,900.000
|
$950.000
|
$1,456.960
|
$1,550.000
|
$1,850.000
|
$2,302.020
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
1.000
|
$1,300.000
|
$1,000.000
|
$1,458.200
|
$1,550.000
|
$1,850.000
|
$2,302.020
|
|
|
REMOV STR (SET)
|
EA
|
8.000
|
$700.000
|
$500.000
|
$237.760
|
$250.000
|
$750.000
|
$394.270
|
|
|
REMOV STR (WINGWALL)
|
EA
|
2.000
|
$1,500.000
|
$1,500.000
|
$891.630
|
$1,000.000
|
$1,250.000
|
$1,271.840
|
|
|
REMOV STR (PIPE)
|
LF
|
455.000
|
$20.000
|
$20.000
|
$7.950
|
$9.000
|
$9.500
|
$7.270
|
|
|
REMOV STR (BOX CULVERT)
|
LF
|
27.000
|
$90.000
|
$50.000
|
$40.220
|
$150.000
|
$94.000
|
$59.590
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$700,000.000
|
$1,000,000.000
|
$1,132,392.710
|
$1,250,000.000
|
$1,280,000.000
|
$1,494,406.310
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
36.000
|
$10,000.000
|
$5,000.000
|
$1,938.230
|
$5,000.000
|
$3,500.000
|
$19,077.530
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
460.000
|
$20.000
|
$25.000
|
$28.000
|
$28.000
|
$30.000
|
$32.040
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 3)
|
LF
|
20.000
|
$56.000
|
$50.000
|
$55.000
|
$55.000
|
$59.000
|
$61.150
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
480.000
|
$4.000
|
$5.000
|
$9.000
|
$9.000
|
$9.500
|
$9.540
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
222.000
|
$10.000
|
$15.000
|
$25.000
|
$25.000
|
$15.000
|
$23.630
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
222.000
|
$6.000
|
$7.000
|
$12.000
|
$12.000
|
$5.000
|
$8.060
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
5,570.000
|
$3.000
|
$3.000
|
$2.900
|
$2.900
|
$5.350
|
$1.540
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
5,570.000
|
$0.580
|
$1.000
|
$0.750
|
$0.750
|
$0.750
|
$0.810
|
|
|
CONSTRUCTING DETOURS
|
SY
|
749.000
|
$50.000
|
$100.000
|
$78.080
|
$85.000
|
$90.000
|
$82.670
|
|
|
PORT CTB (DES SOURCE)(SGL SLP)(TY 1)
|
LF
|
3,900.000
|
$8.000
|
$12.000
|
$9.060
|
$12.000
|
$18.000
|
$10.080
|
|
|
PORT CTB (DES SOURCE)(LOW PROF)(TY 1)
|
LF
|
1,160.000
|
$15.000
|
$16.000
|
$8.150
|
$12.000
|
$15.000
|
$10.080
|
|
|
PORT CTB (DES SOURCE)(LOW PROF)(TY 2)
|
LF
|
20.000
|
$15.000
|
$16.000
|
$3.920
|
$42.000
|
$15.000
|
$10.080
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
7,530.000
|
$5.000
|
$6.000
|
$3.570
|
$6.000
|
$13.000
|
$8.480
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 1)
|
LF
|
1,380.000
|
$10.000
|
$10.000
|
$2.760
|
$8.000
|
$12.500
|
$8.480
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 2)
|
LF
|
40.000
|
$6.500
|
$10.000
|
$3.510
|
$25.000
|
$12.500
|
$8.480
|
|
|
PORT CTB (STKPL)(SGL SLP)(TY 1)
|
LF
|
3,900.000
|
$6.500
|
$10.000
|
$9.230
|
$11.000
|
$16.000
|
$10.080
|
|
|
PORT CTB (STKPL)(LOW PROF)(TY 1)
|
LF
|
1,160.000
|
$8.000
|
$15.000
|
$8.050
|
$11.000
|
$12.000
|
$10.080
|
|
|
PORT CTB (STKPL)(LOW PROF)(TY 2)
|
LF
|
20.000
|
$13.000
|
$15.000
|
$3.740
|
$41.000
|
$12.000
|
$10.080
|
|
|
LANDSCAPE PAVERS
|
SY
|
4,598.000
|
$65.000
|
$80.000
|
$82.920
|
$82.000
|
$85.000
|
$71.540
|
|
|
CONC CURB (MONO) (TY II)
|
LF
|
3,454.000
|
$10.000
|
$8.000
|
$15.230
|
$8.000
|
$10.000
|
$7.210
|
|
|
DRIVEWAYS (ACP)
|
SY
|
147.000
|
$25.000
|
$50.000
|
$75.310
|
$66.850
|
$55.000
|
$74.140
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
2,375.000
|
$30.000
|
$35.000
|
$32.500
|
$28.500
|
$30.000
|
$30.810
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
8.000
|
$2,000.000
|
$2,200.000
|
$2,300.000
|
$2,150.000
|
$2,800.000
|
$1,640.880
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
8.000
|
$2,750.000
|
$3,000.000
|
$2,950.000
|
$2,800.000
|
$3,000.000
|
$2,806.350
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
13.000
|
$1,700.000
|
$1,500.000
|
$1,500.000
|
$1,500.000
|
$3,200.000
|
$1,569.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
3.000
|
$780.000
|
$1,000.000
|
$1,000.000
|
$1,000.000
|
$1,400.000
|
$849.480
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(N)(TL2)
|
EA
|
3.000
|
$20,000.000
|
$20,000.000
|
$19,500.000
|
$19,500.000
|
$23,000.000
|
$10,051.310
|
|
|
REMOVE RD IL ASM (TRANS-BASE)
|
EA
|
4.000
|
$750.000
|
$500.000
|
$750.000
|
$750.000
|
$1,087.000
|
$572.330
|
|
|
IN RD IL (U/P) (TY 1) (150W EQ) LED
|
EA
|
8.000
|
$2,000.000
|
$1,200.000
|
$1,800.000
|
$1,800.000
|
$1,469.000
|
$1,399.020
|
|
|
IN RD IL (TY SA) 40T-8 (250W EQ) LED
|
EA
|
15.000
|
$3,500.000
|
$6,000.000
|
$4,250.000
|
$4,250.000
|
$4,880.000
|
$7,441.510
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
6,725.000
|
$15.000
|
$11.000
|
$15.000
|
$15.000
|
$22.000
|
$13.990
|
|
|
CONDT (PVC) (SCH 40) (3")
|
LF
|
900.000
|
$11.000
|
$14.000
|
$22.000
|
$22.000
|
$29.000
|
$17.490
|
|
|
CONDT (PVC) (SCH 80) (2") (BORE)
|
LF
|
1,825.000
|
$25.000
|
$26.000
|
$32.000
|
$32.000
|
$34.000
|
$31.800
|
|
|
CONDT (PVC) (SCH 80) (3") (BORE)
|
LF
|
400.000
|
$29.000
|
$30.000
|
$41.000
|
$41.000
|
$44.000
|
$34.340
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
8,375.000
|
$1.400
|
$2.000
|
$1.000
|
$1.000
|
$2.000
|
$1.920
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
20,020.000
|
$1.700
|
$2.000
|
$1.500
|
$1.500
|
$2.000
|
$2.020
|
|
|
ELEC CONDR (NO.4) BARE
|
LF
|
35.000
|
$2.000
|
$4.000
|
$2.500
|
$2.500
|
$4.500
|
$2.930
|
|
|
ELEC CONDR (NO.4) INSULATED
|
LF
|
70.000
|
$2.200
|
$4.000
|
$3.000
|
$3.000
|
$4.750
|
$3.460
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
19.000
|
$975.000
|
$1,000.000
|
$1,400.000
|
$1,400.000
|
$1,150.000
|
$1,125.570
|
|
|
GROUND BOX TY D (162922)
|
EA
|
7.000
|
$1,000.000
|
$1,000.000
|
$1,700.000
|
$1,700.000
|
$1,050.000
|
$1,144.650
|
|
|
REMOVE GROUND BOX
|
EA
|
18.000
|
$300.000
|
$200.000
|
$350.000
|
$350.000
|
$270.000
|
$235.290
|
|
|
ELC SRV TY A 240/480 060(NS)SS(E)PS(U)
|
EA
|
1.000
|
$7,000.000
|
$7,000.000
|
$6,500.000
|
$6,500.000
|
$7,400.000
|
$7,992.210
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
47.000
|
$500.000
|
$500.000
|
$525.000
|
$500.000
|
$540.000
|
$705.870
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
2.000
|
$620.000
|
$600.000
|
$700.000
|
$600.000
|
$650.000
|
$890.280
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
3.000
|
$900.000
|
$750.000
|
$1,015.000
|
$750.000
|
$800.000
|
$1,240.040
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
|
EA
|
4.000
|
$1,000.000
|
$900.000
|
$570.000
|
$900.000
|
$975.000
|
$1,462.610
|
|
|
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
|
EA
|
2.000
|
$2,000.000
|
$2,000.000
|
$1,850.000
|
$2,300.000
|
$2,500.000
|
$2,416.490
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
24.000
|
$90.000
|
$200.000
|
$125.000
|
$200.000
|
$200.000
|
$120.820
|
|
|
REMOVE LRSA
|
EA
|
2.000
|
$1,000.000
|
$1,000.000
|
$500.000
|
$500.000
|
$1,000.000
|
$826.690
|
|
|
INSTL OM ASSM (OM-2Y)(WC)GND
|
EA
|
2.000
|
$75.000
|
$100.000
|
$80.000
|
$80.000
|
$86.000
|
$66.730
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
20.000
|
$30.000
|
$40.000
|
$35.000
|
$35.000
|
$38.000
|
$30.750
|
|
|
WK ZN PAV MRK REMOV (W)4"(BRK)
|
LF
|
790.000
|
$1.000
|
$2.000
|
$1.900
|
$1.900
|
$1.090
|
$27.980
|
|
|
WK ZN PAV MRK REMOV (W)4"(DOT)
|
LF
|
911.000
|
$1.250
|
$3.000
|
$3.000
|
$3.000
|
$1.090
|
$2.540
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
32,635.000
|
$0.600
|
$0.600
|
$0.600
|
$0.600
|
$0.730
|
$1.270
|
|
|
WK ZN PAV MRK REMOV (W)8"(SLD)
|
LF
|
6,650.000
|
$1.000
|
$1.500
|
$1.200
|
$1.200
|
$1.520
|
$2.540
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
228.000
|
$7.500
|
$15.000
|
$14.000
|
$14.000
|
$8.700
|
$11.130
|
|
|
WK ZN PAV MRK REMOV (W)(ARROW)
|
EA
|
7.000
|
$175.000
|
$250.000
|
$230.000
|
$230.000
|
$244.000
|
$286.160
|
|
|
WK ZN PAV MRK REMOV (W)(DBL ARROW)
|
EA
|
2.000
|
$200.000
|
$250.000
|
$250.000
|
$250.000
|
$380.000
|
$572.133
|
|
|
WK ZN PAV MRK REMOV (W)(WORD)
|
EA
|
7.000
|
$200.000
|
$250.000
|
$250.000
|
$250.000
|
$244.000
|
$381.550
|
|
|
WK ZN PAV MRK REMOV (W)36"(YLD TRI)
|
EA
|
4.000
|
$11.500
|
$40.000
|
$30.000
|
$30.000
|
$54.000
|
$69.950
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
28,510.000
|
$0.650
|
$0.600
|
$0.600
|
$0.600
|
$0.730
|
$1.270
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
2,180.000
|
$1.000
|
$1.100
|
$1.250
|
$1.120
|
$1.480
|
$1.130
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y
|
EA
|
800.000
|
$2.000
|
$1.100
|
$1.000
|
$1.120
|
$1.480
|
$1.260
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
200.000
|
$1.000
|
$1.100
|
$1.000
|
$1.120
|
$1.480
|
$1.390
|
|
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
|
LF
|
285.000
|
$1.000
|
$1.000
|
$1.000
|
$1.000
|
$1.090
|
$2.860
|
|
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
|
LF
|
247.000
|
$1.250
|
$1.000
|
$1.000
|
$1.000
|
$2.170
|
$3.240
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
7,187.000
|
$1.000
|
$1.250
|
$1.250
|
$1.250
|
$0.910
|
$1.970
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
139.000
|
$6.000
|
$8.000
|
$8.000
|
$8.000
|
$7.610
|
$9.350
|
|
REFL PAV MRK TY I (Y)24"(SLD)(100MIL)
|
LF
|
426.000
|
$6.000
|
$8.000
|
$8.000
|
$8.000
|
$7.610
|
$9.350
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
1,571.000
|
$0.500
|
$0.600
|
$0.600
|
$0.600
|
$0.540
|
$0.700
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
17,403.000
|
$0.500
|
$0.600
|
$0.560
|
$0.560
|
$0.490
|
$0.610
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
18,849.000
|
$0.500
|
$0.600
|
$0.560
|
$0.560
|
$0.490
|
$0.610
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
17.000
|
$220.000
|
$250.000
|
$240.000
|
$240.000
|
$239.000
|
$315.420
|
|
PREFAB PAV MRK TY C (W) (DBL ARROW)
|
EA
|
5.000
|
$380.000
|
$400.000
|
$385.000
|
$385.000
|
$373.000
|
$479.480
|
|
PREFAB PAV MRK TY C (W) (UTURN ARROW)
|
EA
|
3.000
|
$350.840
|
$630.000
|
$630.000
|
$630.000
|
$482.000
|
$508.730
|
|
PREFAB PAV MRK TY C (W) (LNDP ARROW)
|
EA
|
7.000
|
$675.000
|
$715.000
|
$715.000
|
$715.000
|
$640.000
|
$763.100
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
15.000
|
$263.200
|
$350.000
|
$340.000
|
$340.000
|
$250.000
|
$317.960
|
|
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
|
EA
|
12.000
|
$50.000
|
$60.000
|
$60.000
|
$60.000
|
$52.000
|
$50.870
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
143.000
|
$3.250
|
$5.000
|
$4.750
|
$4.750
|
$7.610
|
$4.770
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
530.000
|
$3.750
|
$5.000
|
$4.750
|
$4.750
|
$6.520
|
$4.450
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
10,050.000
|
$0.750
|
$1.500
|
$1.100
|
$1.100
|
$0.840
|
$0.510
|
|
|
INSTALL HWY TRF SIG (ISOLATED)
|
EA
|
1.000
|
$25,000.000
|
$17,500.000
|
$19,000.000
|
$19,000.000
|
$15,000.000
|
$20,667.320
|
|
|
REMOVING TRAFFIC SIGNALS
|
EA
|
1.000
|
$3,500.000
|
$4,000.000
|
$3,300.000
|
$9,635.000
|
$5,400.000
|
$3,988.000
|
|
|
TEMP TRAF SIGNALS
|
EA
|
1.000
|
$48,000.000
|
$60,000.000
|
$52,000.000
|
$52,000.000
|
$42,000.000
|
$74,084.400
|
|
|
VEH SIG SEC (12")LED(GRN)
|
EA
|
6.000
|
$300.000
|
$250.000
|
$300.000
|
$300.000
|
$375.000
|
$311.600
|
|
|
VEH SIG SEC (12")LED(YEL)
|
EA
|
6.000
|
$300.000
|
$250.000
|
$300.000
|
$300.000
|
$375.000
|
$311.600
|
|
|
VEH SIG SEC (12")LED(RED)
|
EA
|
6.000
|
$300.000
|
$250.000
|
$300.000
|
$300.000
|
$375.000
|
$311.600
|
|
|
BACKPLATE W/REF BRDR(3 SEC)(VENT)ALUM
|
EA
|
6.000
|
$100.000
|
$175.000
|
$75.000
|
$75.000
|
$185.000
|
$195.860
|
|
|
TRF SIG CBL (TY A)(14 AWG)(5 CONDR)
|
LF
|
150.000
|
$2.000
|
$3.000
|
$2.000
|
$2.000
|
$2.670
|
$2.570
|
|
|
TRF SIG CBL (TY A)(14 AWG)(20 CONDR)
|
LF
|
1,600.000
|
$5.000
|
$6.000
|
$4.000
|
$4.000
|
$10.410
|
$6.380
|
|
|
INS TRF SIG PL AM(S)1 ARM(28')LUM
|
EA
|
3.000
|
$7,666.670
|
$10,000.000
|
$10,500.000
|
$10,500.000
|
$13,600.000
|
$12,273.210
|
|
|
D-GR HMA TY-B PG64-22
|
TON
|
9,320.000
|
$70.000
|
$77.000
|
$82.000
|
$95.000
|
$92.000
|
$101.750
|
|
|
SP MIXES SP-C SAC-A PG70-22
|
TON
|
7,509.000
|
$75.000
|
$82.000
|
$103.000
|
$110.000
|
$120.000
|
$134.810
|
|
|
BONDING COURSE
|
GAL
|
13,652.000
|
$3.250
|
$3.500
|
$0.010
|
$0.010
|
$0.010
|
$3.180
|
|
|
TMA (STATIONARY)
|
DAY
|
40.000
|
$200.000
|
$250.000
|
$200.000
|
$290.000
|
$250.000
|
$317.960
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
200.000
|
$75.000
|
$25.000
|
$94.640
|
$25.000
|
$50.000
|
$95.390
|
|
|
RVDS(PRESENCE DETECTION ONLY)
|
EA
|
3.000
|
$6,473.240
|
$1,500.000
|
$6,500.000
|
$6,500.000
|
$8,750.000
|
$1,399.020
|
|
|
RVDS(ADVANCE DETECTION ONLY)
|
EA
|
2.000
|
$7,250.590
|
$1,000.000
|
$6,500.000
|
$6,500.000
|
$9,500.000
|
$1,240.040
|
|
|
VIVDS TEMPORARY
|
EA
|
1.000
|
$12,078.910
|
$15,000.000
|
$6,500.000
|
$6,500.000
|
$17,500.000
|
$18,441.610
|
|
Totals: |
$12,373,652.190
|
$10,787,639.600
|
$11,447,987.000
|
$12,579,198.696
|
$12,855,753.810
|
$15,206,733.043
|