COOKE FM 371 (0822-01-021)

Items: 118

County: COOKE
Length: N/A
Highway: FM 371
District: WICHITA FALLS
Control Number: 0822-01-021
DBE Goal: N/A
Project: STP 2021(711)HES
Guaranty: N/A
Time: 260 WORKING DAYS
Engineer's Estimate: $7,914,757.91
Date: 07/01/2021 (4 years ago)
Contract Number: N/A
Type: WIDEN ROAD - ADD SHOULDERS
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Documents:
Bidders (6)
E
Engineer's Estimate
$7,914,757.91
$7,175,268.12
Over/Under Est: -9.34% -$739,489.79
$7,914,340.71
Over/Under Est: -0.01% -$417.20
Amt Left: 10.3% $739,072.59
$7,989,318.60
Over/Under Est: 0.94% $74,560.69
Amt Left: 11.35% $814,050.48
Delta: -0.95% -$74,977.89
Over/Under Est: 1.99% $157,216.63
Amt Left: 12.5% $896,706.42
Delta: -1.03% -$82,655.94
Over/Under Est: 23.19% $1,835,227.65
Amt Left: 35.88% $2,574,717.44
Delta: -20.79% -$1,678,011.02
$10,168,646.71
Over/Under Est: 28.48% $2,253,888.80
Amt Left: 41.72% $2,993,378.59
Delta: -4.29% -$418,661.15

Bid Items & Bid Tabulations

118 Total 0 of 118
COOKE  |  FM 371  |  WICHITA FALLS  |  0822-01-021  |  07/01/2021  |  $7,914,757.91  |  STP 2021(711)HES  |  WIDEN ROAD - ADD SHOULDERS  |  260 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
EUROVIA ATLANTIC COAST LLC
A. L. HELMCAMP, INC.
JAGOE-PUBLIC COMPANY
FOUTSCO PAVING COMPANY, LLC
ED BELL CONSTRUCTION COMPANY
RK HALL, LLC
PREPARING ROW
STA 12.000 $27,000.000 $4,450.000 $4,000.000 $1,000.000 $500.000 $8,000.000 $3,465.000
REMOVING CONC (MISC)
SY 78.000 $31.500 $76.000 $20.000 $22.500 $20.000 $45.000 $29.140
EXCAVATION (ROADWAY)
CY 4,765.000 $8.250 $27.000 $14.000 $13.500 $14.000 $10.000 $56.950
EXCAVATION (CHANNEL)
CY 69.000 $8.500 $50.000 $100.000 $15.000 $20.000 $25.000 $65.740
EMBANKMENT (FINAL)(ORD COMP)(TY A)
CY 10,007.000 $16.000 $22.000 $38.000 $13.500 $20.000 $15.000 $23.550
BROADCAST SEED (TEMP) (WARM)
SY 87,576.000 $0.100 $0.080 $0.090 $0.050 $0.100 $0.080 $0.250
BROADCAST SEED (TEMP) (COOL)
SY 87,576.000 $0.100 $0.080 $0.090 $0.050 $0.020 $0.080 $0.250
DRILL SEEDING (PERM) (RURAL) (CLAY)
SY 175,152.000 $0.150 $0.120 $0.090 $0.120 $0.100 $0.140 $0.280
VEGETATIVE WATERING
MG 1,069.000 $20.000 $37.000 $10.000 $50.000 $35.000 $36.500 $30.800
SOIL RETENTION BLANKETS (CL 1) (TY B)
SY 22,030.000 $1.250 $0.910 $1.470 $1.500 $0.900 $1.650 $0.760
PROOF ROLLING
HR 103.000 $80.000 $125.000 $60.000 $45.000 $100.000 $150.000 $281.780
CEMENT
TON 1,038.000 $170.000 $180.000 $175.430 $170.000 $165.000 $250.000 $187.850
CEMENT TREAT(EXIST MATL)(8")
SY 71,757.000 $5.000 $3.250 $3.250 $4.000 $4.000 $4.000 $6.990
EMULS ASPH (EROSN CONT)(SS-1)
GAL 30,957.000 $3.800 $3.150 $3.000 $3.000 $2.500 $9.210 $3.660
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
SY 16,121.000 $40.000 $38.000 $49.000 $54.000 $60.000 $60.000 $52.200
PLANE ASPH CONC PAV(0" TO 2")
SY 6,914.000 $1.500 $3.000 $2.000 $2.500 $2.250 $2.300 $2.530
CEM STABIL BKFL
CY 46.000 $85.000 $150.000 $168.000 $175.000 $150.000 $157.500 $173.250
CUT & RESTORING PAV
SY 46.000 $115.000 $150.000 $50.000 $50.000 $291.000 $194.250 $213.680
TRENCH EXCAVATION PROTECTION
LF 10.000 $50.000 $1.000 $1.100 $1.000 $20.000 $21.000 $23.100
TEMPORARY SPL SHORING
SF 337.000 $35.000 $50.000 $55.000 $55.000 $85.000 $89.250 $98.180
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 14.000 $250.000 $250.000 $135.000 $350.000 $150.000 $315.000 $1,100.000
RIPRAP (STONE TY R)(DRY)(12 IN)
CY 113.500 $190.000 $280.000 $195.000 $200.000 $120.000 $126.000 $138.600
RIPRAP (MOW STRIP)(4 IN)
CY 54.000 $450.000 $610.000 $560.000 $625.000 $650.000 $735.000 $750.750
STR STEEL (MISCELLANEOUS BRIDGE)
LB 4,800.000 $6.000 $6.730 $5.300 $7.000 $5.000 $7.350 $27.500
CMP (GAL STL 12 IN)
LF 95.000 $80.000 $37.000 $42.000 $50.000 $45.000 $47.250 $51.980
CMP (GAL STL 18 IN)
LF 1,664.000 $50.000 $53.250 $57.000 $60.000 $49.000 $52.500 $57.750
CMP (GAL STL 24 IN)
LF 131.000 $75.000 $64.500 $70.000 $75.000 $94.000 $102.900 $113.190
CMP (GAL STL 30 IN)
LF 22.000 $130.000 $76.500 $85.000 $85.000 $125.000 $131.250 $144.380
CONC BOX CULV (3 FT X 2 FT)(EXTEND)
LF 11.000 $550.000 $330.000 $355.000 $360.000 $550.000 $991.640 $635.250
CONC BOX CULV (3 FT X 3 FT)(EXTEND)
LF 27.000 $550.000 $365.000 $390.000 $400.000 $585.000 $1,134.490 $675.680
CONC BOX CULV (4 FT X 3 FT)(EXTEND)
LF 36.000 $600.000 $400.000 $435.000 $450.000 $600.000 $1,197.650 $693.000
CONC BOX CULV (4 FT X 4 FT)(EXTEND)
LF 20.000 $625.000 $495.000 $530.000 $550.000 $650.000 $1,283.850 $750.750
CONC BOX CULV (6 FT X 6 FT)(EXTEND)
LF 10.000 $800.000 $650.000 $690.000 $700.000 $800.000 $1,625.810 $924.000
CONC BOX CULV (8 FT X 3 FT)(EXTEND)
LF 22.000 $700.000 $575.000 $615.000 $625.000 $825.000 $1,538.830 $952.880
RC PIPE (CL III)(24 IN)
LF 218.000 $70.000 $68.000 $73.000 $75.000 $100.000 $105.000 $115.500
RC PIPE (CL III)(30 IN)
LF 4.000 $90.000 $104.000 $112.000 $115.000 $150.000 $157.500 $173.250
RC PIPE (CL III)(36 IN)
LF 130.000 $125.000 $140.000 $150.000 $150.000 $180.000 $189.000 $207.900
RC PIPE (CL III)(42 IN)
LF 27.000 $150.000 $200.000 $220.000 $225.000 $200.000 $210.000 $231.000
RC PIPE (CL III)(48 IN)
LF 44.000 $200.000 $244.000 $265.000 $275.000 $250.000 $262.500 $288.750
HEADWALL (CH - FW - 0) (DIA= 36 IN)
EA 2.000 $6,500.000 $3,400.000 $3,700.000 $3,800.000 $6,000.000 $13,018.330 $6,930.000
HEADWALL (CH - PW - 0) (DIA= 24 IN)
EA 1.000 $5,000.000 $2,700.000 $3,050.000 $3,200.000 $5,500.000 $11,705.890 $6,352.500
HEADWALL (CH - PW - 0) (DIA= 30 IN)
EA 1.000 $6,000.000 $3,600.000 $4,000.000 $4,100.000 $5,500.000 $13,280.890 $6,352.500
HEADWALL (CH - PW - 0) (DIA= 36 IN)
EA 1.000 $6,500.000 $5,200.000 $5,800.000 $6,000.000 $7,500.000 $17,459.890 $8,662.500
HEADWALL (CH - PW - 0) (DIA= 42 IN)
EA 2.000 $10,000.000 $6,400.000 $7,000.000 $7,200.000 $9,500.000 $23,570.830 $10,972.500
HEADWALL (CH - PW - 0) (DIA= 48 IN)
EA 2.000 $10,500.000 $8,500.000 $9,050.000 $10,000.000 $12,000.000 $30,920.830 $13,860.000
WINGWALL (PW - 2) (HW=4 FT)
EA 4.000 $10,000.000 $4,900.000 $5,200.000 $5,500.000 $5,500.000 $13,847.840 $6,352.500
WINGWALL (PW - 2) (HW=5 FT)
EA 2.000 $11,000.000 $6,200.000 $6,900.000 $7,000.000 $6,500.000 $16,967.180 $7,507.500
WINGWALL (PW - 2) (HW=6 FT)
EA 5.000 $20,000.000 $8,725.000 $9,400.000 $10,000.000 $9,000.000 $22,096.450 $10,395.000
WINGWALL (PW - 2) (HW=8 FT)
EA 1.000 $38,000.000 $13,125.000 $14,000.000 $15,000.000 $16,000.000 $38,182.490 $18,480.000
SET (TY I) (30 IN) (4: 1) (C)
EA 3.000 $3,500.000 $3,200.000 $3,700.000 $3,800.000 $8,500.000 $8,925.000 $9,817.500
SET (TY I)(S= 4 FT)(HW= 4 FT)(4:1) (C)
EA 1.000 $8,500.000 $3,800.000 $4,100.000 $4,200.000 $9,500.000 $17,990.140 $10,972.500
SET (TY II) (12 IN) (CMP) (6: 1) (P)
EA 4.000 $700.000 $755.000 $805.000 $850.000 $800.000 $840.000 $924.000
SET (TY II) (18 IN) (CMP) (6: 1) (P)
EA 123.000 $1,100.000 $950.000 $1,000.000 $1,000.000 $900.000 $945.000 $1,039.500
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 7.000 $1,200.000 $845.000 $920.000 $950.000 $900.000 $945.000 $1,039.500
SET (TY II) (24 IN) (CMP) (6: 1) (P)
EA 14.000 $1,500.000 $1,200.000 $1,315.000 $1,400.000 $1,200.000 $1,260.000 $1,386.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 2.000 $1,500.000 $1,065.000 $1,150.000 $1,200.000 $1,200.000 $1,260.000 $1,386.000
SET (TY II) (30 IN) (CMP) (6: 1) (P)
EA 30.000 $3,500.000 $2,150.000 $2,370.000 $2,500.000 $2,500.000 $2,625.000 $2,887.500
SET (TY II) (30 IN) (RCP) (6: 1) (P)
EA 3.000 $2,500.000 $2,150.000 $2,370.000 $2,500.000 $2,500.000 $2,625.000 $2,887.500
SET (TY II) (36 IN) (RCP) (6: 1) (P)
EA 2.000 $4,200.000 $3,700.000 $4,100.000 $4,200.000 $3,500.000 $3,675.000 $4,042.500
REMOV & RE - LAY PIPE (24 IN)
LF 42.000 $40.000 $41.000 $45.000 $50.000 $35.000 $36.750 $40.430
REMOV & RE - LAY PIPE (30 IN)
LF 138.000 $45.000 $50.000 $56.000 $50.000 $45.000 $47.250 $51.980
REMOV & RE - LAY PIPE (36 IN)
LF 18.000 $75.000 $63.000 $69.000 $70.000 $55.000 $57.750 $63.530
REMOV & RE - LAY PIPE (42 IN)
LF 48.000 $65.000 $80.000 $90.000 $90.000 $65.000 $68.250 $75.080
CLEAN EXIST CULVERTS
CY 67.000 $350.000 $600.000 $740.000 $750.000 $180.000 $200.000 $2,310.000
REMOV STR (SET)
EA 17.000 $200.000 $125.000 $155.000 $155.000 $650.000 $682.500 $750.750
REMOV STR (WINGWALL)
EA 7.000 $1,200.000 $750.000 $790.000 $800.000 $1,500.000 $1,575.000 $1,732.500
REMOV STR (PIPE)
LF 435.000 $13.250 $7.000 $7.500 $7.500 $30.000 $31.500 $34.650
MOBILIZATION
LS 1.000 $660,026.360 $500,000.000 $590,000.000 $575,000.000 $500,000.000 $1,307,500.000 $857,328.770
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 16.000 $6,000.000 $20,500.000 $3,000.000 $20,000.000 $1,500.000 $31,500.000 $22,987.060
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 2,040.000 $25.000 $27.000 $30.000 $30.000 $27.000 $29.400 $27.570
ROCK FILTER DAMS (REMOVE)
LF 2,040.000 $6.000 $8.000 $11.000 $10.000 $8.000 $13.650 $7.120
TEMP PAVED FLUME (INSTALL)
SY 1,536.000 $35.000 $30.000 $22.000 $20.000 $21.000 $21.000 $33.000
TEMP PAVED FLUME (REMOVE)
SY 1,536.000 $15.000 $15.000 $10.000 $5.000 $15.000 $10.500 $16.500
TEMP SEDMT CONT FENCE (INSTALL)
LF 5,000.000 $2.500 $2.200 $3.000 $4.000 $2.200 $1.730 $2.420
TEMP SEDMT CONT FENCE (REMOVE)
LF 5,000.000 $0.500 $1.000 $0.950 $0.750 $1.000 $0.210 $0.480
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 4,900.000 $3.500 $4.000 $3.100 $4.500 $4.000 $3.680 $3.920
BIODEG EROSN CONT LOGS (REMOVE)
LF 4,900.000 $0.750 $1.000 $0.850 $0.750 $1.000 $1.050 $0.890
DRIVEWAYS (CONC)
SY 67.000 $100.000 $91.000 $90.000 $105.000 $150.000 $171.100 $173.250
DRIVEWAYS (ACP)
SY 720.000 $35.000 $35.000 $40.000 $45.000 $60.000 $49.800 $69.080
TURNOUTS (ACP)
SY 1,501.000 $45.000 $48.000 $46.000 $40.000 $55.000 $65.870 $67.920
DRIVEWAYS (BASE)
SY 7,683.000 $25.000 $19.000 $14.000 $15.000 $23.000 $27.550 $32.060
RUMBLE STRIPS (SHOULDER)
LF 112,300.000 $0.150 $0.200 $0.180 $0.150 $0.100 $0.150 $0.330
RUMBLE STRIPS (CENTERLINE)
LF 56,150.000 $0.150 $0.200 $0.180 $0.150 $0.100 $0.150 $0.330
MTL W-BEAM GD FEN (TIM POST)
LF 790.000 $20.000 $24.800 $24.000 $30.000 $21.000 $24.150 $27.280
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $1,500.000 $1,920.000 $1,556.000 $1,900.000 $1,600.000 $4,877.370 $2,112.000
MTL W - BEAM GD FEN (LOW FILL CULVERT)
LF 60.000 $55.000 $68.000 $65.000 $55.000 $64.000 $53.550 $74.800
MTL BM GD FEN TRANS (ANCHOR PLATE)
EA 4.000 $1,500.000 $520.000 $614.000 $700.000 $633.000 $682.500 $572.000
REMOVE METAL BEAM GUARD FENCE
LF 300.000 $2.500 $3.000 $5.250 $4.000 $3.000 $3.150 $3.300
REMOVE TERMINAL ANCHOR SECTION
EA 4.000 $250.000 $300.000 $315.000 $270.000 $185.000 $262.500 $330.000
GUARDRAIL END TREATMENT (INSTALL)
EA 8.000 $2,500.000 $3,000.000 $2,830.000 $2,900.000 $2,675.000 $2,835.000 $3,300.000
GUARDRAIL END TREATMENT (REMOVE)
EA 4.000 $250.000 $300.000 $315.000 $265.000 $185.000 $262.500 $330.000
MAILBOX INSTALL-S (WC-POST) TY 3
EA 68.000 $200.000 $290.000 $137.000 $180.000 $130.000 $136.500 $143.000
MAILBOX INSTALL-D (WC-POST) TY 3
EA 6.000 $250.000 $280.000 $147.000 $200.000 $140.000 $147.000 $154.000
MAILBOX INSTALL-M (TWW-POST) TY 4
EA 5.000 $600.000 $700.000 $567.000 $625.000 $540.000 $630.000 $594.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 27.000 $500.000 $480.000 $504.000 $580.000 $480.000 $509.250 $528.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 4.000 $650.000 $640.000 $672.000 $680.000 $640.000 $740.250 $704.000
IN SM RD SN SUP&AM (INST SIGN ONLY)
EA 1.000 $350.000 $45.000 $47.000 $175.000 $45.000 $210.000 $49.500
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 11.000 $550.000 $400.000 $420.000 $500.000 $400.000 $420.000 $440.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 18.000 $35.000 $30.000 $36.000 $50.000 $90.000 $22.050 $47.380
INSTL DEL ASSM (D-SW)SZ 1(WFLX)SRF(BI)
EA 6.000 $125.000 $90.000 $95.000 $105.000 $90.000 $93.450 $99.000
INSTL OM ASSM (OM-2Z)(WFLX)GND
EA 179.000 $25.000 $75.000 $79.000 $185.000 $75.000 $93.450 $82.500
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 24,112.000 $0.200 $0.120 $0.130 $0.150 $0.120 $0.130 $0.130
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
LF 746.000 $0.200 $0.150 $0.160 $0.160 $0.150 $0.160 $0.170
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 15,928.000 $0.200 $0.120 $0.130 $0.150 $0.120 $0.130 $0.130
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 14,034.000 $0.950 $1.100 $0.600 $1.500 $0.750 $3.700 $1.700
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 112,270.000 $0.400 $0.320 $0.340 $0.350 $0.320 $0.340 $0.350
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 3,749.000 $0.450 $0.400 $0.420 $0.450 $0.400 $0.420 $0.440
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 96,181.000 $0.400 $0.320 $0.340 $0.350 $0.320 $0.340 $0.350
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 24.000 $11.000 $14.000 $14.700 $15.000 $14.000 $14.700 $0.150
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
EA 2.000 $50.000 $75.000 $78.750 $80.000 $75.000 $78.750 $82.500
REFL PAV MRKR TY II-A-A
EA 14,034.000 $3.000 $3.150 $3.310 $3.500 $3.150 $3.310 $3.470
D-GR HMA TY-B PG64-22
TON 15,106.000 $80.000 $66.500 $90.000 $85.000 $95.000 $80.000 $103.460
D-GR HMA TY-D PG70-28 (LEVEL-UP)
TON 1,889.000 $95.000 $99.000 $115.000 $100.000 $120.000 $125.000 $132.560
TACK COAT
GAL 1,546.000 $3.500 $3.250 $3.390 $2.500 $3.250 $3.410 $6.890
SP MIXES SP-D SAC-B PG70-28
TON 21,339.000 $95.000 $87.250 $105.000 $105.000 $111.000 $98.000 $111.280
TACK COAT
GAL 7,759.000 $3.500 $3.250 $3.000 $2.500 $4.500 $3.410 $6.170
TMA (STATIONARY)
DAY 335.000 $200.000 $265.000 $200.000 $75.000 $1.000 $73.500 $383.100
TMA (MOBILE OPERATION)
DAY 20.000 $250.000 $500.000 $50.000 $75.000 $1.000 $735.000 $81.890
Totals: $7,914,757.910 $7,175,268.120 $7,914,340.710 $7,989,318.600 $8,071,974.540 $9,749,985.560 $10,168,646.710