Show Job Controls
Bid Cobra

COOKE FM 372 (0815-01-051)

Items: 38

County: COOKE
Length: N/A
Highway: FM 372
District: WICHITA FALLS
Control Number: 0815-01-051
DBE Goal: N/A
Project: F 2023(459)
Guaranty: N/A
Time: 85 WORKING DAYS
Engineer's Estimate: $3,556,106.40
Date: 02/02/2023 (3 years ago)
Contract Number: N/A
Type: PREVENTIVE MAINTENANCE
Mail/Deliver Bids To: N/A
COLBY SHELTON
LANCE POMYKAL
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (4)
E
Engineer's Estimate
$3,556,106.40
$4,347,377.45
Over/Under Est: 22.25% $791,271.05
Over/Under Est: 25.11% $892,953.45
Amt Left: 2.34% $101,682.40
Over/Under Est: 26.85% $954,890.84
Amt Left: 3.76% $163,619.79
Delta: -1.39% -$61,937.39
$4,663,567.63
Over/Under Est: 31.14% $1,107,461.23
Amt Left: 7.27% $316,190.18
Delta: -3.38% -$152,570.39

Bid Items & Bid Tabulations

38 Total 0 of 38
COOKE  |  FM 372  |  WICHITA FALLS  |  0815-01-051  |  02/02/2023  |  $3,556,106.40  |  F 2023(459)  |  PREVENT MAINT  |  85 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
AUSTIN BRIDGE & ROAD SERVICES, LP
PEACHTREE CONSTRUCTION, LTD.
EUROVIA ATLANTIC COAST LLC
JAGOE-PUBLIC COMPANY
REMOVING CONC (DRIVEWAYS)
SY 344.000 $15.000 $35.000 $38.000 $40.000 $38.000
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 991.000 $30.000 $45.000 $48.000 $45.000 $49.000
BACKFILL (TY A OR B)
STA 262.000 $120.000 $138.520 $225.000 $359.000 $230.000
BROADCAST SEED (PERM) (RURAL) (SANDY)
SY 34,773.000 $0.100 $0.200 $0.420 $0.140 $0.150
VEGETATIVE WATERING
MG 298.000 $25.000 $60.000 $78.000 $205.000 $75.000
EMULS ASPH (EROSN CONT)(SS-1)
GAL 5,818.000 $3.750 $5.100 $5.250 $2.800 $3.500
FLEXIBLE PAVEMENT STRUCTURE REPAIR(5")
SY 42,178.000 $30.000 $36.750 $42.000 $38.250 $45.000
PLANE ASPH CONC PAV (0" TO 1 1/2")
SY 5,826.000 $1.750 $3.490 $5.250 $15.000 $5.000
RIPRAP (MOW STRIP)(4 IN)
CY 432.000 $500.000 $620.010 $625.000 $567.000 $675.000
MOBILIZATION
LS 1.000 $318,736.950 $434,737.740 $125,000.000 $240,000.000 $250,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 5.000 $10,000.000 $40,000.000 $30,000.000 $16,000.000 $46,000.000
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 1,300.000 $5.000 $6.000 $4.500 $2.450 $2.700
BIODEG EROSN CONT LOGS (REMOVE)
LF 1,300.000 $1.000 $1.000 $1.500 $1.000 $1.100
DRIVEWAYS (CONC)
SY 344.000 $85.000 $120.910 $125.000 $132.330 $140.000
DRIVEWAYS (ACP)
SY 2,270.000 $35.000 $9.950 $29.000 $32.000 $24.750
DRIVEWAYS (BASE)
SY 1,285.000 $20.000 $40.540 $37.000 $89.380 $38.250
RUMBLE STRIPS (SHOULDER) ASPHALT
LF 52,358.000 $0.200 $0.080 $0.100 $0.080 $0.120
RUMBLE STRIPS (CENTERLINE) ASPHALT
LF 26,179.000 $0.200 $0.140 $0.160 $0.140 $0.180
MTL W-BEAM GD FEN (TIM POST)
LF 8,700.000 $25.000 $18.750 $26.500 $24.000 $20.500
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 12.000 $2,250.000 $1,585.000 $2,100.000 $1,950.000 $660.000
MTL BM GD FEN TRANS (ANCHOR PLATE)
EA 12.000 $800.000 $830.000 $1,025.000 $950.000 $13.000
REMOVE METAL BEAM GUARD FENCE
LF 8,625.000 $2.000 $1.500 $2.150 $2.000 $1.600
REMOVE TERMINAL ANCHOR SECTION
EA 8.000 $200.000 $150.000 $220.000 $200.000 $54.000
GUARDRAIL END TREATMENT (INSTALL)
EA 12.000 $3,200.000 $2,631.000 $3,250.000 $2,950.000 $2,900.000
INSTL DEL ASSM (D-DW)SZ 1(BRF)GF2
EA 105.000 $30.000 $36.000 $24.000 $22.000 $39.250
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 2,636.000 $1.000 $0.400 $2.500 $2.000 $2.200
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 52,704.000 $0.300 $0.450 $0.500 $0.440 $0.500
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 3,720.000 $0.300 $0.450 $0.500 $0.470 $0.500
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 30,851.000 $0.300 $0.450 $0.500 $0.440 $0.500
PREFAB PAV MRK TY B (W)(12")(SLD)
LF 64.000 $25.000 $10.750 $11.500 $20.000 $21.750
REFL PAV MRKR TY II-A-A
EA 572.000 $5.000 $4.400 $4.500 $3.600 $3.900
TREE REMOVAL (18" - 24" DIA)
EA 4.000 $1,250.000 $1,500.000 $2,200.000 $2,000.000 $2,200.000
TREE AND BRUSH REMOVAL
AC 2.000 $10,000.000 $5,000.000 $14,000.000 $13,000.000 $14,200.000
SP MIXES SP-D SAC-B PG70-28
TON 9,599.000 $105.000 $125.750 $130.000 $135.000 $130.000
BONDING COURSE
GAL 6,981.000 $3.250 $4.170 $3.500 $4.800 $2.000
PREFORMED IN-LANE(TRANS) RUMBLE STRIP
LF 320.000 $15.000 $15.000 $7.500 $4.000 $4.400
TMA (STATIONARY)
DAY 112.000 $250.000 $397.700 $350.000 $386.000 $250.000
TMA (MOBILE OPERATION)
DAY 9.000 $300.000 $789.500 $700.000 $1,130.000 $500.000
Totals: $3,556,106.400 $4,347,377.450 $4,449,059.850 $4,510,997.240 $4,663,567.630