COOKE FM 1199 (0044-09-067)

Items: 151

County: COOKE
Length: N/A
Highway: FM 1199
District: WICHITA FALLS
Control Number: 0044-09-067
DBE Goal: N/A
Project: F 2021(705)
Guaranty: N/A
Time: 238 WORKING DAYS
Engineer's Estimate: $4,756,780.83
Date: 07/02/2021 (4 years ago)
Contract Number: N/A
Type: BRIDGE REPLACEMENT
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Documents:
Bidders (5)
E
Engineer's Estimate
$4,756,780.83
$5,027,472.98
Over/Under Est: 5.69% $270,692.15
Over/Under Est: 7.22% $343,219.17
Amt Left: 1.44% $72,527.02
$5,294,230.85
Over/Under Est: 11.3% $537,450.02
Amt Left: 5.31% $266,757.87
Delta: -3.81% -$194,230.85
Over/Under Est: 20.47% $973,887.46
Amt Left: 13.99% $703,195.31
Delta: -8.24% -$436,437.44
Over/Under Est: 21.72% $1,033,132.83
Amt Left: 15.17% $762,440.68
Delta: -1.03% -$59,245.37

Bid Items & Bid Tabulations

151 Total 0 of 151
COOKE  |  FM 1199  |  WICHITA FALLS  |  0044-09-067  |  07/02/2021  |  $4,756,780.83  |  F 2021(705)  |  BRIDGE REPL  |  238 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
JAGOE-PUBLIC COMPANY
NEW WORLD CONTRACTING, LLC
A. L. HELMCAMP, INC.
EUROVIA ATLANTIC COAST LLC
ED BELL CONSTRUCTION COMPANY
PREPARING ROW
AC 3.372 $16,000.000 $16,000.000 $15,000.000 $30,000.000 $25,500.000 $37,500.000
REMOVING CONC (RIPRAP)
SY 139.000 $11.000 $40.500 $9.000 $42.000 $45.000 $21.000
REMOVING CONC (DRIVEWAYS)
SY 1,184.000 $15.000 $19.500 $15.000 $32.000 $17.000 $33.000
REMOVING CONC (CURB AND GUTTER)
LF 67.000 $8.500 $35.500 $15.000 $22.000 $30.000 $22.000
REMOVING CONC (SIDEWALK OR RAMP)
SY 16.000 $20.000 $78.500 $8.000 $68.000 $75.000 $71.500
REMOVING STAB BASE AND ASPH PAV (2"-6")
SY 7,926.000 $3.000 $4.000 $4.000 $1.500 $4.500 $4.780
EXCAVATION (ROADWAY)
CY 5,737.000 $13.000 $13.000 $15.000 $5.000 $18.000 $21.000
EXCAVATION (CHANNEL)
CY 128.000 $15.000 $11.000 $18.000 $32.000 $105.000 $42.000
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 11,943.000 $17.000 $26.000 $16.000 $26.000 $21.500 $21.000
BROADCAST SEED (TEMP) (WARM)
SY 32,205.000 $0.100 $0.050 $0.160 $0.110 $0.150 $0.160
BROADCAST SEED (TEMP) (COOL)
SY 32,205.000 $0.090 $0.050 $0.160 $0.110 $0.150 $0.160
DRILL SEEDING (PERM) (RURAL) (CLAY)
SY 64,410.000 $0.130 $0.200 $0.180 $0.120 $0.170 $0.220
VEGETATIVE WATERING
MG 648.000 $20.000 $50.000 $20.000 $20.000 $33.000 $37.310
PROOF ROLLING
HR 2.300 $72.000 $100.000 $255.000 $85.000 $150.000 $157.500
CEMENT
TON 376.000 $175.000 $175.000 $164.000 $176.000 $185.000 $225.000
CEMENT TREAT (SUBGRADE) (8")
SY 25,316.000 $3.000 $6.500 $6.750 $4.000 $4.000 $2.000
CEMENT TREAT (NEW BASE)(12")
SY 479.000 $3.500 $20.500 $6.750 $12.000 $50.000 $12.000
EMULS ASPH (EROSN CONT)(SS-1)
GAL 16,105.000 $3.830 $3.250 $3.650 $3.000 $3.000 $3.500
FLEXIBLE PAVEMENT STRUCTURE REPAIR(5")
SY 4,020.000 $26.610 $32.000 $74.000 $56.000 $29.000 $50.000
PLANE ASPH CONC PAV (0" TO 1 1/2")
SY 1,153.000 $1.750 $5.750 $6.650 $4.000 $9.000 $7.530
CEM STABIL BKFL
CY 104.000 $90.000 $180.000 $220.000 $200.000 $250.000 $275.000
CUT & RESTORE ASPH PAVING
SY 14.000 $90.000 $110.000 $200.000 $200.000 $450.000 $198.880
TRENCH EXCAVATION PROTECTION
LF 31.000 $4.000 $8.000 $21.500 $22.000 $10.000 $21.500
TEMPORARY SPL SHORING
SF 1,150.000 $20.000 $22.500 $105.000 $95.000 $62.000 $107.500
DRILL SHAFT (18 IN)
LF 116.000 $110.000 $210.000 $195.000 $290.000 $275.000 $167.780
DRILL SHAFT (36 IN)
LF 242.000 $205.000 $390.000 $350.000 $350.000 $550.000 $370.290
CL C CONC (ABUT)(HPC)(EXTEND)
CY 39.600 $2,200.000 $2,000.000 $1,040.000 $2,000.000 $2,200.000 $2,500.000
CL C CONC (CAP)(HPC)
CY 20.100 $1,050.000 $3,300.000 $1,900.000 $3,000.000 $3,800.000 $2,500.000
CL C CONC (COLUMN)(HPC)
CY 69.600 $1,000.000 $1,200.000 $1,100.000 $1,300.000 $1,250.000 $1,575.000
CL A CONC (CHANNEL LINING)
CY 50.000 $400.000 $610.000 $570.000 $520.000 $650.000 $525.000
REINF CONC SLAB (HPC)
SF 8,178.000 $25.000 $32.500 $20.000 $30.000 $38.000 $33.000
APPROACH SLAB (HPC)
CY 108.200 $600.000 $1,300.000 $527.000 $700.000 $675.000 $525.000
PRESTR CONC GIRDER (TX34)
LF 385.340 $140.000 $260.000 $425.000 $175.000 $300.000 $525.000
RIPRAP (CONC)(CL B)(RR8&RR9)
CY 107.000 $500.000 $470.000 $600.000 $500.000 $580.000 $525.000
RIPRAP (STONE PROTECTION)(12 IN)
CY 106.000 $125.000 $230.000 $86.000 $125.000 $290.000 $150.000
RIPRAP (STONE PROTECTION)(24 IN)
CY 326.000 $135.000 $160.000 $92.000 $135.000 $150.000 $150.000
RIPRAP (MOW STRIP)(4 IN)
CY 106.000 $485.000 $550.000 $577.000 $680.000 $575.000 $630.000
RAIL (TY T223)
LF 453.400 $105.000 $140.000 $140.000 $110.000 $150.000 $125.000
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
LF 95.000 $115.000 $150.000 $120.000 $100.000 $170.000 $111.000
WATERPROOFING (TY 10)
SY 89.200 $25.000 $110.000 $85.000 $80.000 $50.000 $30.000
CMP (GAL STL 24 IN)
LF 16.000 $85.000 $82.000 $105.000 $100.000 $80.000 $105.350
CMP (GAL STL 42 IN)
LF 2.000 $125.000 $210.000 $535.000 $500.000 $125.000 $537.500
CONC BOX CULV (8 FT X 7 FT)(EXTEND)
LF 53.000 $1,000.000 $970.000 $1,020.000 $1,000.000 $870.000 $1,021.250
RC PIPE (CL III)(15 IN)
LF 710.000 $53.000 $100.000 $54.000 $55.000 $45.250 $53.750
RC PIPE (CL III)(18 IN)
LF 1,225.000 $55.000 $110.000 $60.000 $60.000 $59.160 $60.200
RC PIPE (CL III)(24 IN)
LF 368.000 $66.000 $140.000 $107.000 $110.000 $70.750 $107.500
RC PIPE (CL III)(42 IN)
LF 51.000 $165.000 $280.000 $215.000 $220.000 $287.500 $215.000
HEADWALL (CH - PW - 0) (DIA= 42 IN)
EA 1.000 $13,000.000 $9,500.000 $10,000.000 $10,000.000 $5,000.000 $10,212.500
HEADWALL (CH - PW - S) (DIA= 24 IN)
EA 1.000 $5,400.000 $4,500.000 $6,450.000 $6,500.000 $2,900.000 $6,450.000
HEADWALL (CH - PW - S) (DIA= 42 IN)
EA 1.000 $13,000.000 $6,700.000 $11,000.000 $11,000.000 $6,000.000 $10,750.000
WINGWALL (PW - 1) (HW=10 FT)
EA 1.000 $48,000.000 $45,000.000 $42,000.000 $40,000.000 $43,000.000 $41,387.500
WINGWALL (PW - 1) (HW=9 FT)
EA 1.000 $38,000.000 $35,000.000 $35,000.000 $34,000.000 $26,000.000 $34,400.000
SET (TY II) (15 IN) (RCP) (6: 1) (P)
EA 35.000 $800.000 $1,000.000 $915.000 $900.000 $2,000.000 $913.750
SET (TY II) (18 IN) (RCP) (4: 1) (C)
EA 1.000 $1,000.000 $1,200.000 $860.000 $900.000 $2,150.000 $860.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 80.000 $825.000 $1,100.000 $970.000 $950.000 $2,175.000 $967.500
SET (TY II) (24 IN) (CMP) (4: 1) (C)
EA 5.000 $1,600.000 $1,200.000 $970.000 $950.000 $2,275.000 $967.500
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 14.000 $1,400.000 $1,500.000 $1,020.000 $1,000.000 $2,400.000 $1,021.250
SET (TY II) (42 IN) (CMP) (4: 1) (C)
EA 12.000 $4,860.000 $6,600.000 $3,800.000 $3,700.000 $5,800.000 $3,762.500
SET (TY II) (42 IN) (RCP) (4: 1) (C)
EA 1.000 $4,200.000 $6,600.000 $3,800.000 $3,700.000 $5,300.000 $3,762.500
REMOV & RE - LAY PIPE (18 IN)
LF 12.000 $35.000 $140.000 $38.000 $40.000 $35.000 $37.630
ADJUSTING MANHOLES (SANITARY)
EA 6.000 $2,000.000 $2,100.000 $1,615.000 $1,600.000 $1,000.000 $2,100.000
CLEAN EXIST CULVERTS
EA 11.000 $2,600.000 $1,700.000 $1,615.000 $1,600.000 $825.000 $1,575.000
REMOV STR (SET)
EA 35.000 $452.000 $330.000 $650.000 $700.000 $150.000 $735.000
REMOV STR (WINGWALL)
EA 2.000 $1,275.000 $2,900.000 $1,075.000 $1,100.000 $800.000 $1,100.000
REMOV STR (HEADWALL)
EA 18.000 $992.660 $490.000 $1,075.000 $1,100.000 $600.000 $1,100.000
REMOV STR (PIPE)
LF 1,991.000 $15.000 $6.000 $27.000 $26.000 $8.000 $27.500
REMOV STR (BRIDGE SLAB)
EA 1.000 $88,000.000 $72,000.000 $81,105.690 $35,000.000 $90,000.000 $125,000.000
REMOV STR (APPROACH SLAB)
EA 2.000 $5,000.000 $7,000.000 $2,000.000 $10,000.000 $9,000.000 $5,250.000
REMOVE STR (RAIL)
LF 432.000 $26.000 $33.000 $42.000 $29.000 $35.000 $21.000
MOBILIZATION
LS 1.000 $475,680.280 $333,000.000 $350,000.000 $450,000.000 $500,000.000 $523,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 14.000 $16,000.000 $1,900.000 $5,000.000 $15,000.000 $22,000.000 $25,200.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 515.000 $28.000 $29.500 $29.000 $34.000 $27.830 $30.100
ROCK FILTER DAMS (INSTALL) (TY 3)
LF 75.000 $53.000 $86.500 $85.000 $43.000 $81.700 $34.400
ROCK FILTER DAMS (REMOVE)
LF 590.000 $6.000 $13.000 $13.000 $12.000 $12.350 $15.050
TEMP SEDMT CONT FENCE (INSTALL)
LF 14,025.000 $2.250 $2.000 $3.000 $2.000 $2.550 $1.770
TEMP SEDMT CONT FENCE (REMOVE)
LF 14,025.000 $0.600 $0.500 $0.500 $0.800 $0.490 $0.220
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 3,470.000 $3.300 $4.250 $4.000 $3.300 $4.010 $3.760
BIODEG EROSN CONT LOGS (REMOVE)
LF 3,470.000 $0.850 $0.500 $0.500 $0.800 $0.490 $1.080
CONSTRUCTING DETOURS
SY 73.000 $55.000 $200.000 $160.000 $60.000 $145.000 $100.000
ONE-WAY TRAF CONT (PORT TRAF SIG)
MO 7.000 $4,000.000 $5,000.000 $5,500.000 $4,000.000 $9,000.000 $3,150.000
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
LF 420.000 $35.000 $70.500 $66.000 $70.000 $55.000 $31.500
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
LF 100.000 $35.000 $84.500 $78.000 $76.000 $45.000 $42.000
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
LF 40.000 $50.000 $82.500 $80.000 $76.000 $45.000 $42.000
PORT CTB (MOVE)(F-SHAPE)(TY 1)
LF 400.000 $6.000 $14.500 $14.000 $10.000 $25.000 $21.000
PORT CTB (MOVE)(LOW PROF)(TY 1)
LF 300.000 $5.000 $13.000 $14.000 $10.000 $15.000 $7.350
PORT CTB (MOVE)(LOW PROF)(TY 2)
LF 120.000 $10.000 $12.500 $15.000 $10.000 $15.000 $15.750
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
LF 420.000 $10.000 $15.000 $12.000 $10.000 $20.000 $15.750
PORT CTB (REMOVE)(LOW PROF)(TY 1)
LF 100.000 $6.500 $15.000 $15.000 $10.000 $20.000 $21.000
PORT CTB (REMOVE)(LOW PROF)(TY 2)
LF 40.000 $9.000 $15.000 $18.000 $10.000 $20.000 $31.500
CONC CURB & GUTTER (TY II)
LF 63.000 $25.000 $50.000 $31.000 $110.000 $35.000 $63.000
DRIVEWAYS (CONC)
SY 934.000 $100.000 $92.500 $78.000 $125.000 $88.000 $94.500
DRIVEWAYS (ACP)
SY 2,711.000 $45.000 $25.000 $32.000 $45.000 $36.000 $43.000
TURNOUTS (ACP)
SY 253.000 $55.000 $39.000 $47.000 $60.000 $47.000 $41.000
DRIVEWAYS (BASE)
SY 2,806.000 $24.000 $12.000 $30.000 $16.000 $18.000 $21.000
CONC SIDEWALKS (6")
SY 7.000 $65.000 $220.000 $60.000 $110.000 $125.000 $157.500
CURB RAMPS (TY 7)
SY 11.000 $125.900 $150.000 $80.000 $160.000 $1,200.000 $315.000
RUMBLE STRIPS (SHOULDER) ASPHALT
LF 26,951.000 $0.280 $0.160 $0.150 $0.200 $0.230 $0.140
RUMBLE STRIPS (CENTERLINE) ASPHALT
LF 13,255.000 $0.500 $0.160 $0.150 $0.250 $0.230 $0.140
MTL W-BEAM GD FEN (TIM POST)
LF 288.000 $20.000 $27.000 $26.000 $25.000 $20.850 $25.260
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 3.000 $1,625.000 $1,800.000 $1,800.000 $1,700.000 $1,499.000 $2,352.940
MTL BEAM GD FEN TRANS (TL2)
EA 1.000 $1,131.970 $1,300.000 $1,302.000 $1,400.000 $799.000 $1,397.500
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 2.000 $1,290.000 $1,350.000 $1,325.000 $1,300.000 $1,088.000 $1,290.000
MTL W - BEAM GD FEN (LOW FILL CULVERT)
LF 238.000 $56.000 $73.000 $72.000 $55.000 $57.000 $55.850
REMOVE METAL BEAM GUARD FENCE
LF 931.000 $2.570 $1.750 $2.000 $3.000 $2.000 $3.230
GUARDRAIL END TREATMENT (INSTALL)
EA 6.000 $2,690.000 $3,200.000 $3,200.000 $3,000.000 $2,650.000 $2,956.250
CRASH CUSH ATTEN (MOVE & RESET)
EA 2.000 $1,520.000 $370.000 $105.000 $4,000.000 $2,000.000 $1,575.000
CRASH CUSH ATTEN (REMOVE)
EA 2.000 $840.000 $190.000 $525.000 $2,500.000 $1,500.000 $735.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 2.000 $7,400.000 $9,800.000 $7,245.000 $11,000.000 $8,000.000 $9,450.000
GATE (REMOVE)
EA 1.000 $497.860 $420.000 $800.000 $550.000 $1,100.000 $806.250
WIRE FENCE (TY A)
LF 90.000 $14.200 $14.000 $80.000 $30.000 $90.000 $53.750
GATE (TY 3)
EA 1.000 $1,413.120 $740.000 $1,300.000 $550.000 $2,300.000 $1,612.500
MAILBOX INSTALL-S (WC-POST) TY 3
EA 18.000 $200.000 $190.000 $210.000 $140.000 $365.000 $139.750
MAILBOX INSTALL-D (WC-POST) TY 3
EA 3.000 $210.000 $210.000 $210.000 $150.000 $455.000 $150.500
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 42.000 $560.000 $580.000 $580.000 $520.000 $469.000 $532.130
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 3.000 $625.000 $680.000 $735.000 $730.000 $569.000 $747.130
IN SM RD SN SUP&AM TYS80(1)SA(P-BM)
EA 1.000 $815.000 $810.000 $750.000 $870.000 $844.000 $886.880
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 3.000 $900.000 $990.000 $1,050.000 $940.000 $855.000 $962.130
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
EA 1.000 $980.000 $1,000.000 $1,050.000 $1,200.000 $1,011.000 $1,177.130
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 2.000 $550.000 $490.000 $630.000 $450.000 $386.000 $430.000
REMOVE SM RD SN SUP&AM
EA 41.000 $78.000 $94.000 $105.000 $68.000 $69.000 $69.880
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 8.000 $21.450 $26.500 $11.000 $20.000 $17.000 $16.130
REMOVE DELIN & OBJECT MARKER ASSMS
EA 30.000 $45.000 $25.500 $14.000 $22.000 $39.000 $21.500
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 18.000 $27.000 $28.000 $30.000 $22.000 $20.000 $22.580
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND(BI)
EA 32.000 $130.000 $32.000 $64.000 $85.000 $64.000 $84.930
INSTL OM ASSN (OM-2Z)(WFLX)(WAP)
EA 20.000 $125.000 $32.000 $64.000 $85.000 $64.000 $88.150
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 1,870.000 $0.640 $2.250 $2.000 $2.200 $1.450 $1.560
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 36.000 $14.500 $13.500 $13.000 $13.000 $20.000 $21.500
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 3,300.000 $0.660 $2.250 $2.000 $2.200 $1.450 $1.560
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 5,322.000 $1.050 $1.250 $0.800 $0.700 $1.500 $1.750
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 443.000 $0.800 $0.850 $1.050 $0.800 $1.000 $1.080
PAVEMENT SEALER 4"
LF 450.000 $0.120 $0.150 $0.150 $0.150 $0.500 $0.540
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 35,242.000 $0.360 $0.420 $0.410 $0.400 $0.360 $0.390
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 2,850.000 $0.400 $0.420 $0.410 $0.400 $0.440 $0.470
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 20,469.000 $0.350 $0.420 $0.410 $0.400 $0.360 $0.390
PREFAB PAV MRK TY B (W)(24")(SLD)
LF 110.000 $28.000 $37.500 $37.000 $40.000 $20.000 $21.500
PREFAB PAV MRK TY B (W)(ARROW)
EA 2.000 $600.000 $500.000 $500.000 $500.000 $365.000 $392.380
PREFAB PAV MRK TY B (W)(WORD)
EA 2.000 $635.000 $1,200.000 $1,161.000 $1,200.000 $589.000 $633.180
REFL PAV MRKR TY I-C
EA 22.000 $3.500 $2.250 $2.000 $2.300 $4.000 $4.300
REFL PAV MRKR TY II-A-A
EA 402.000 $2.850 $2.250 $2.000 $2.300 $4.000 $4.300
ELIM EXT PAV MRK & MRKS (4")
LF 56,890.000 $0.430 $0.100 $0.130 $0.130 $0.350 $0.380
ELIM EXT PAV MRK & MRKS (24")
LF 11.000 $5.500 $0.700 $0.700 $1.000 $25.000 $26.880
TREE REMOVAL (18" - 24" DIA)
EA 1.000 $1,110.000 $950.000 $2,500.000 $2,500.000 $2,350.000 $2,526.250
DITCH CLEANING AND RESHAPING (FOOT)
LF 81.000 $7.000 $39.000 $25.000 $30.000 $100.000 $42.000
D-GR HMA TY-B PG64-22
TON 6,415.000 $82.000 $77.500 $88.000 $85.000 $85.000 $82.500
D-GR HMA TY-D PG70-28
TON 5,341.000 $100.000 $89.500 $103.000 $95.000 $90.000 $97.000
D-GR HMA TY-D PG70-28 (LEVEL-UP)
TON 84.000 $100.000 $110.000 $155.000 $250.000 $115.000 $126.000
TACK COAT
GAL 2,560.000 $3.000 $4.000 $3.000 $3.000 $4.000 $3.600
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $16,000.000 $16,000.000 $10,500.000 $10,000.000 $17,500.000 $10,000.000
PREFORMED IN-LANE(TRANS) RUMBLE STRIP
LF 80.000 $3.500 $16.000 $10.500 $16.000 $20.000 $21.500
TMA (STATIONARY)
DAY 162.000 $220.000 $160.000 $250.000 $225.000 $290.000 $105.000
TMA (MOBILE OPERATION)
DAY 38.000 $250.000 $250.000 $300.000 $60.000 $500.000 $525.000
Totals: $4,756,780.830 $5,027,472.980 $5,100,000.000 $5,294,230.850 $5,730,668.290 $5,789,913.660