CONCHO CS (0907-15-005)

Items: 55

County: CONCHO
Length: N/A
Highway: CS
District: SAN ANGELO
Control Number: 0907-15-005
DBE Goal: N/A
Project: STP 2017(287)TAPS
Guaranty: N/A
Time: 83 WORKING DAYS
Engineer's Estimate: $895,955.00
Date: 06/06/2018 (7 years ago)
Contract Number: N/A
Type: PEDESTRIAN IMPROVEMENTS
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (4)
E
Engineer's Estimate
$895,955.00
$934,493.50
Over/Under Est: 4.3% $38,538.50
$975,849.30
Over/Under Est: 8.92% $79,894.30
Amt Left: 4.43% $41,355.80
Over/Under Est: 18.74% $167,923.50
Amt Left: 13.85% $129,385.00
Delta: -9.02% -$88,029.20
$1,329,367.50
Over/Under Est: 48.37% $433,412.50
Amt Left: 42.26% $394,874.00
Delta: -24.95% -$265,489.00

Bid Items & Bid Tabulations

55 Total 0 of 55
CONCHO  |  CS  |  SAN ANGELO  |  0907-15-005  |  06/06/2018  |  $895,955.00  |  STP 2017(287)TAPS  |  PEDESTRIAN IMPRVS  |  83 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ENCINO LANDSCAPE, INC.
RELMCO, INC.
A GREATER AUSTIN DEVELOPMENT COMPANY, LTD.
FNH CONSTRUCTION, LLC
REMOVING CONC (PAV)
SY 245.000 $30.000 $20.000 $18.000 $47.500 $20.000
REMOVING CONC (SIDEWALKS)
SY 1,050.000 $30.000 $15.000 $18.000 $44.000 $20.000
REMOVING CONC (DRIVEWAYS)
SY 30.000 $45.000 $15.000 $18.000 $35.000 $20.000
REMOVING CONC (CURB AND GUTTER)
LF 395.000 $25.000 $5.000 $18.000 $9.000 $12.500
REMOVING CONC (MISC)
SY 15.000 $150.000 $20.000 $30.000 $95.000 $500.000
REMOVING CONC (WHEELCHAIR RAMP)
SY 70.000 $120.000 $15.000 $30.000 $62.000 $30.000
CONC PVMT (JOINTED - CPCD) (8")
SY 245.000 $120.000 $200.000 $107.900 $130.000 $125.000
DRILL SHAFT (18 IN)
LF 30.000 $100.000 $180.000 $165.000 $150.000 $185.000
DRILL SHAFT (24 IN)
LF 236.000 $150.000 $240.000 $220.000 $200.000 $250.000
RAIL (HANDRAIL)(TY A)
LF 160.000 $100.000 $200.000 $150.000 $95.000 $150.000
RAIL (HANDRAIL)(TY W)
LF 10.000 $75.000 $200.000 $150.000 $270.000 $150.000
ADJUSTING MANHOLES (WATER VALVE BOX)
EA 5.000 $400.000 $500.000 $1,200.000 $350.000 $750.000
MOBILIZATION
LS 1.000 $60,000.000 $100,000.000 $87,500.000 $106,000.000 $130,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 5.000 $3,000.000 $4,000.000 $9,500.000 $4,500.000 $8,500.000
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 120.000 $15.000 $5.000 $12.000 $9.000 $15.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 120.000 $5.000 $1.000 $6.000 $1.000 $10.000
CONC CURB (TY II)
LF 30.000 $35.000 $20.000 $28.340 $58.000 $30.000
CONC CURB & GUTTER (TY I)
LF 295.000 $35.000 $35.000 $35.100 $45.500 $35.000
CONC CURB & GUTTER (TY II)
LF 1,035.000 $40.000 $35.000 $35.100 $45.500 $35.000
DRIVEWAYS (CONC)
SY 70.000 $200.000 $70.000 $74.100 $110.000 $85.000
CONC SIDEWALKS (4")
SY 750.000 $90.000 $50.000 $80.000 $110.000 $65.000
CONC SIDEWALKS (6")
SY 980.000 $100.000 $70.000 $85.000 $120.000 $85.000
CURB RAMPS (TY 1)
EA 4.000 $2,500.000 $2,000.000 $1,397.500 $1,700.000 $1,850.000
CURB RAMPS (TY 2)
EA 2.000 $2,600.000 $2,000.000 $1,397.500 $2,000.000 $1,850.000
CURB RAMPS (TY 5)
EA 2.000 $2,600.000 $2,000.000 $1,397.500 $4,100.000 $1,850.000
CURB RAMPS (TY 10)
EA 2.000 $2,500.000 $2,000.000 $1,397.500 $1,900.000 $1,850.000
CURB RAMPS (TY 21)
EA 1.000 $4,000.000 $3,000.000 $1,397.500 $2,600.000 $1,850.000
CURB RAMPS (SPECIAL)
SY 56.000 $150.000 $100.000 $1,500.000 $140.000 $200.000
CONDT (PVC) (SCH 40) (1")
LF 350.000 $10.000 $20.000 $17.600 $18.500 $15.000
CONDT (PVC) (SCH 40) (2")
LF 3,005.000 $20.000 $22.000 $19.800 $21.000 $15.000
CONDT (PVC) (SCH 40) (2") (BORE)
LF 210.000 $60.000 $60.000 $55.000 $58.000 $40.000
ELEC CONDR (NO.12) INSULATED
LF 5,540.000 $5.000 $1.100 $0.990 $1.100 $2.000
ELEC CONDR (NO.10) BARE
LF 150.000 $6.000 $1.100 $0.990 $1.100 $2.000
ELEC CONDR (NO.10) INSULATED
LF 6,430.000 $6.000 $1.200 $1.040 $1.100 $2.000
ELEC CONDR (NO.8) BARE
LF 2,280.000 $7.000 $1.200 $1.100 $1.200 $2.000
ELEC CONDR (NO.6) BARE
LF 700.000 $8.000 $1.200 $1.100 $1.200 $2.000
ELEC CONDR (NO.2) INSULATED
LF 330.000 $10.000 $2.750 $2.470 $2.600 $3.000
ELEC CONDR (NO.2/0) BARE
LF 2,100.000 $12.000 $7.200 $6.600 $7.000 $3.000
REMOVE ELECTRICAL SERVICES
EA 1.000 $500.000 $700.000 $676.500 $720.000 $2,500.000
ELC SRV TY D 120/240 150(NS)AL(E)SF(U)
EA 1.000 $5,000.000 $7,500.000 $7,150.000 $7,600.000 $5,000.000
ELC SRV TY D 120/240 250(NS)AL(E)SF(U)
EA 1.000 $5,000.000 $13,000.000 $12,650.000 $13,400.000 $6,500.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 13.000 $600.000 $600.000 $495.000 $4,500.000 $650.000
PREFAB PAV MRK TY B (W)(4")(SLD)
LF 2,850.000 $2.000 $10.000 $6.600 $7.000 $2.000
PRE PM TY B (ACC PRK)(BLU)(SYMBOL ONLY)
EA 11.000 $400.000 $700.000 $634.700 $670.000 $1,500.000
REMOVAL OF CONCRETE FOUNDATIONS
EA 9.000 $500.000 $840.000 $770.000 $820.000 $1,500.000
REMOVE LUMINAIRE POLE
EA 15.000 $500.000 $600.000 $550.000 $580.000 $1,500.000
LANDSCAPE AMENITY (TY 1)
EA 19.000 $4,500.000 $6,000.000 $5,390.000 $5,400.000 $10,000.000
LANDSCAPE AMENITY (TY 2)
EA 14.000 $3,500.000 $5,000.000 $4,290.000 $4,400.000 $10,000.000
LANDSCAPE AMENITY (TY 3)
EA 2.000 $1,000.000 $2,000.000 $1,430.000 $1,500.000 $10,000.000
LANDSCAPE AMENITY (TY 4)
EA 10.000 $150.000 $2,500.000 $2,090.000 $2,100.000 $10,000.000
LANDSCAPE AMENITY (TY 5)
EA 5.000 $300.000 $600.000 $467.500 $500.000 $10,000.000
LANDSCAPE AMENITY (TY 6)
EA 1.000 $1,000.000 $4,500.000 $3,960.000 $4,200.000 $10,000.000
LANDSCAPE AMENITY (TY 7)
EA 6.000 $1,800.000 $2,200.000 $1,980.000 $2,000.000 $10,000.000
PRECAST CONCRETE WHEEL STOPS
EA 62.000 $250.000 $200.000 $125.000 $110.000 $250.000
REMOVE CONDUCTOR
LF 1,130.000 $0.500 $7.000 $6.600 $7.000 $8.000
Totals: $895,955.000 $934,493.500 $975,849.300 $1,063,878.500 $1,329,367.500