CONCHO US 83 (0035-02-037)

Items: 23

County: CONCHO
Length: N/A
Highway: US 83
District: SAN ANGELO
Control Number: 0035-02-037
DBE Goal: N/A
Project: STP 2019(271)
Guaranty: N/A
Time: 32 WORKING DAYS
Engineer's Estimate: $2,953,452.11
Date: 12/06/2018 (7 years ago)
Contract Number: N/A
Type: HOT ASPHALT RUBBER SURFACE TREATMENT
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (2)
E
Engineer's Estimate
$2,953,452.11
$3,060,704.83
Over/Under Est: 3.63% $107,252.72
$3,166,901.25
Over/Under Est: 7.23% $213,449.14
Amt Left: 3.47% $106,196.42

Bid Items & Bid Tabulations

23 Total 0 of 23
CONCHO  |  US 83  |  SAN ANGELO  |  0035-02-037  |  12/06/2018  |  $2,953,452.11  |  STP 2019(271)  |  HOT ASPH RUBBER SURF TREATMENT  |  32 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
COX PAVING OF TEXAS, INC.
CDM HOLDINGS, LLC
ASPH (A-R TYPE II)
GAL 528,930.000 $2.800 $2.750 $3.000
AGGR(TY-PB GR-3 SAC-A)
CY 10,372.000 $105.000 $97.990 $105.000
AGGR(TY-PB GR-4 SAC-B)
CY 1,000.000 $100.000 $97.990 $100.000
MOBILIZATION
LS 1.000 $174,732.160 $375,000.000 $250,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 3.000 $6,000.000 $8,667.000 $9,500.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 522.000 $1.000 $0.580 $1.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 4,809.000 $1.000 $0.580 $1.000
REFL PAV MRK TY II (W) 4" (BRK)
LF 15,978.000 $0.120 $0.130 $0.140
REFL PAV MRK TY II (W) 4" (SLD)
LF 255,862.000 $0.100 $0.110 $0.130
REFL PAV MRK TY II (W) 8" (SLD)
LF 220.000 $0.350 $0.300 $0.260
REFL PAV MRK TY II (W) 24" (SLD)
LF 1,724.000 $2.640 $2.000 $3.500
REFL PAV MRK TY II (Y) 4" (BRK)
LF 29,381.000 $0.100 $0.130 $0.140
REFL PAV MRK TY II (Y) 4" (SLD)
LF 221,071.000 $0.100 $0.110 $0.130
PREFAB PAV MRK TY C (W) (4") (DOT)
LF 1,345.000 $2.490 $1.500 $1.500
PREFAB PAV MRK TY C (W) (8") (DOT)
LF 37.000 $5.290 $8.000 $5.000
PREFAB PAV MRK TY C (W) (ARROW)
EA 2.000 $200.000 $250.000 $250.000
PREFAB PAV MRK TY C (W) (DBL ARROW)
EA 6.000 $300.000 $325.000 $320.000
PREFAB PAV MRK TY C (W) (LNDP ARROW)
EA 10.000 $450.000 $450.000 $800.000
PREFAB PAV MRK TY C (W) (WORD)
EA 2.000 $250.000 $300.000 $250.000
REFL PAV MRKR TY I-C
EA 933.000 $2.350 $5.000 $3.000
REFL PAV MRKR TY II-A-A
EA 3,770.000 $2.650 $3.000 $2.800
TMA (STATIONARY)
DAY 9.000 $180.000 $0.010 $500.000
TMA (MOBILE OPERATION)
DAY 18.000 $200.000 $0.010 $100.000
Totals: $2,953,452.110 $3,060,704.830 $3,166,901.250