Show Job Controls
Bid Cobra

COMANCHE SH 36 (0183-01-053)

Items: 65

County: COMANCHE
Length: N/A
Highway: SH 36
District: BROWNWOOD
Control Number: 0183-01-053
DBE Goal: N/A
Project: F 2021(767)
Guaranty: N/A
Time: 114 WORKING DAYS
Engineer's Estimate: $1,598,593.66
Date: 08/04/2021 (4 years ago)
Contract Number: N/A
Type: INTERSECTION IMPROVEMENTS WITH RIGHT AND/OR LEFT T
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Documents:
Bidders (3)
E
Engineer's Estimate
$1,598,593.66
Over/Under Est: -2.56% -$40,998.17
Over/Under Est: 5.56% $88,931.94
Amt Left: 8.34% $129,930.11
Over/Under Est: 10.86% $173,540.00
Amt Left: 13.77% $214,538.17
Delta: -5.01% -$84,608.06

Bid Items & Bid Tabulations

65 Total 0 of 65
COMANCHE  |  SH 36  |  BROWNWOOD  |  0183-01-053  |  08/04/2021  |  $1,598,593.66  |  F 2021(767)  |  INTERS IMPRVS WITH RIGHT AND/OR LEFT...  |  114 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
JAY MILLS CONTRACTING, INCORPORATED
BIG CREEK CONSTRUCTION, LTD.
TEXAS MATERIALS GROUP, INC.
EXCAVATION (ROADWAY)
CY 2,733.000 $20.000 $6.500 $14.500 $10.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 4,665.000 $25.000 $10.750 $14.500 $22.000
BLADING
LF 24,008.000 $1.500 $1.400 $1.500 $0.200
BROADCAST SEED (PERM) (RURAL) (SANDY)
SY 7,692.000 $0.250 $0.780 $0.300 $0.270
BROADCAST SEED (TEMP) (WARM)
SY 3,846.000 $0.250 $0.880 $0.400 $0.380
BROADCAST SEED (TEMP) (COOL)
SY 3,846.000 $0.250 $0.890 $0.400 $0.380
VEGETATIVE WATERING
MG 173.000 $10.500 $21.000 $15.000 $38.000
PROOF ROLLING
HR 10.000 $100.000 $100.000 $100.000 $101.000
FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS)
CY 5,353.100 $43.000 $41.250 $58.000 $58.000
ASPH (AC-20-5TR)
GAL 3,504.000 $3.130 $4.000 $3.700 $3.400
ASPH (RC-250)
GAL 2,061.000 $4.260 $4.750 $4.200 $4.800
AGGR(TY-B GR-5 SAC-B)
CY 77.000 $92.420 $85.000 $115.000 $163.000
AGGR(TY-PB GR-4 SAC-B)
CY 86.000 $123.570 $135.000 $130.000 $211.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(10")
SY 100.000 $50.000 $412.500 $59.000 $120.000
PLANE ASPH CONC PAV(0" TO 2")
SY 1,239.000 $3.000 $2.750 $6.000 $2.850
PLANE ASPH CONC PAV (2")
SY 1,621.000 $3.250 $6.050 $5.000 $2.150
CL C CONC (CULV)
CY 18.940 $1,450.000 $1,650.000 $1,900.000 $1,500.000
RIPRAP (CONC)(5 IN)
CY 4.000 $650.000 $1,100.000 $725.000 $1,000.000
RIPRAP (CONC) (CL B) (4")
CY 0.500 $1,000.000 $2,750.000 $1,150.000 $2,500.000
CMP AR (GAL STL DES 3)
LF 20.000 $98.000 $70.000 $90.000 $60.000
SET (TY I)(S= 6 FT)(HW= 7 FT)(3:1) (C)
EA 1.000 $9,000.000 $17,600.000 $24,000.000 $16,000.000
SET (TY II) (DES 3) (CMP) (6: 1) (P)
EA 2.000 $4,500.000 $2,100.000 $1,800.000 $1,800.000
MOBILIZATION
LS 1.000 $141,888.660 $125,000.000 $160,000.000 $179,310.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 7.000 $8,100.000 $5,550.000 $5,000.000 $8,020.000
ROCK FILTER DAMS (REMOVE)
LF 90.000 $1.000 $36.000 $10.000 $10.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 470.000 $7.500 $4.750 $5.000 $2.600
TEMP SEDMT CONT FENCE (REMOVE)
LF 470.000 $1.500 $3.000 $1.500 $1.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 330.000 $5.200 $7.000 $4.000 $4.150
BIODEG EROSN CONT LOGS (REMOVE)
LF 330.000 $1.500 $3.000 $1.500 $1.000
ROCK FILTER DAMS (INSTALL) (TY 2) (6:1)
LF 90.000 $5.000 $134.000 $50.000 $48.500
DRIVEWAYS (SURF TREAT)
SY 150.000 $30.000 $61.000 $17.500 $40.000
TURNOUTS (SURF TREAT)
SY 11.000 $9.660 $80.000 $50.000 $20.000
RUMBLE STRIPS (SHOULDER)
LF 23,760.000 $0.500 $0.200 $0.100 $0.180
RUMBLE STRIPS (CENTERLINE)
LF 15,264.000 $0.500 $0.200 $0.100 $0.300
MAILBOX INSTALL-S (WC-POST) TY 3
EA 1.000 $181.690 $500.000 $200.000 $200.000
CONDT (PVC) (SCH 80) (2")
LF 16.000 $15.000 $33.000 $40.000 $30.000
ELEC CONDR (NO.8) BARE
LF 20.000 $1.650 $5.000 $5.000 $4.000
ELEC CONDR (NO.8) INSULATED
LF 40.000 $1.980 $5.000 $5.000 $4.000
GROUND BOX TY A (122311)W/APRON
EA 1.000 $1,000.000 $1,650.000 $2,000.000 $1,500.000
REMOVE GROUND BOX
EA 1.000 $500.000 $220.000 $250.000 $200.000
ALUMINUM SIGNS (TY A)
SF 36.500 $29.180 $60.000 $50.000 $40.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 2.000 $500.000 $850.000 $550.000 $450.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 2.000 $500.000 $900.000 $650.000 $550.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 1.000 $500.000 $1,200.000 $900.000 $650.000
REMOVE SM RD SN SUP&AM
EA 5.000 $91.690 $150.000 $90.000 $150.000
INSTL OM ASSM (OM-2Y)(WC)GND
EA 1.000 $100.000 $150.000 $70.000 $100.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 385.000 $0.500 $1.750 $1.000 $1.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 1,538.000 $0.500 $1.750 $1.000 $1.000
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
LF 532.000 $0.260 $0.830 $1.250 $0.750
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 434.000 $0.800 $1.710 $2.000 $1.550
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 36.000 $12.000 $13.200 $12.000 $12.000
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 23,760.000 $0.260 $0.460 $0.500 $0.420
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 2,368.000 $0.260 $0.470 $0.500 $0.430
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 18,689.000 $0.260 $0.470 $0.500 $0.430
PREFAB PAV MRK TY C (W) (ARROW)
EA 12.000 $203.030 $231.000 $210.000 $210.000
PREFAB PAV MRK TY C (W) (WORD)
EA 12.000 $259.590 $352.000 $225.000 $320.000
REFL PAV MRKR TY I-C
EA 232.000 $3.100 $4.400 $5.000 $4.000
REFL PAV MRKR TY II-A-A
EA 507.000 $2.910 $4.400 $5.000 $4.000
VEH SIG SEC (12")LED(YEL)
EA 4.000 $100.000 $350.000 $350.000 $315.000
RELOCATE RDSD FLASH BEACON ASSEMBLY
EA 1.000 $2,000.000 $10,450.000 $10,000.000 $9,500.000
INSTL RDSD FLSH BCN ASSM (SOLAR PWRD)
EA 2.000 $8,000.000 $13,475.000 $13,000.000 $12,250.000
SP MIXES SP-C SAC-B PG76-22
TON 7,272.000 $100.000 $100.000 $102.000 $110.000
BONDING COURSE
GAL 10,577.000 $3.170 $3.000 $3.500 $3.050
TMA (STATIONARY)
DAY 90.000 $140.000 $50.000 $175.000 $235.000
TMA (MOBILE OPERATION)
HR 48.000 $75.000 $165.000 $90.000 $25.000
Totals: $1,598,593.660 $1,557,595.495 $1,687,525.600 $1,772,133.660