PREPARING ROW(TREE)(5" TO 12" DIA)
|
EA
|
3.000
|
$1,200.000
|
$750.000
|
$1,200.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
858.000
|
$20.000
|
$16.000
|
$25.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
881.000
|
$25.000
|
$5.000
|
$40.000
|
|
|
BLADING
|
LF
|
1,963.000
|
$1.500
|
$1.500
|
$1.500
|
|
|
BROADCAST SEED (PERM) (RURAL) (SANDY)
|
SY
|
4,438.000
|
$0.250
|
$0.750
|
$0.440
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
2,219.000
|
$0.250
|
$0.750
|
$0.780
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
2,219.000
|
$0.250
|
$0.750
|
$0.780
|
|
|
VEGETATIVE WATERING
|
MG
|
100.000
|
$10.500
|
$18.000
|
$35.400
|
|
|
PROOF ROLLING
|
HR
|
10.000
|
$125.000
|
$90.000
|
$130.000
|
|
|
FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS)
|
CY
|
2,227.000
|
$61.320
|
$46.000
|
$60.000
|
|
|
ASPH (AC-20-5TR)
|
GAL
|
1,508.000
|
$3.100
|
$4.000
|
$4.850
|
|
|
ASPH (RC-250)
|
GAL
|
887.000
|
$4.200
|
$4.750
|
$13.250
|
|
|
AGGR(TY-B GR-5 SAC-B)
|
CY
|
33.000
|
$92.420
|
$75.000
|
$315.000
|
|
|
AGGR(TY-PB GR-4 SAC-B)
|
CY
|
37.000
|
$122.570
|
$130.000
|
$350.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(10")
|
SY
|
500.000
|
$60.000
|
$115.000
|
$79.000
|
|
|
PLANE CONC PAV(0" TO 1")
|
SY
|
7,901.000
|
$4.400
|
$1.350
|
$1.600
|
|
|
PLANE ASPH CONC PAV (2")
|
SY
|
2,437.000
|
$3.250
|
$2.000
|
$2.250
|
|
|
DRILL SHAFT (30 IN)
|
LF
|
20.000
|
$245.000
|
$360.000
|
$195.000
|
|
|
CL C CONC (CULV)
|
CY
|
4.480
|
$1,450.000
|
$2,750.000
|
$2,500.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
39.500
|
$650.000
|
$833.000
|
$550.000
|
|
|
RIPRAP (CONC) (CL B) (4")
|
CY
|
1.750
|
$1,000.000
|
$1,650.000
|
$500.000
|
|
|
CMP AR (GAL STL DES 3)
|
LF
|
24.000
|
$98.000
|
$86.000
|
$60.000
|
|
|
RC PIPE (CL III)(42 IN)
|
LF
|
186.000
|
$150.000
|
$351.000
|
$225.000
|
|
|
JCTBOX(COMPL)(PJB)(5FTX5FT)
|
EA
|
1.000
|
$6,500.000
|
$4,200.000
|
$6,500.000
|
|
|
INLET(COMPL)(PAZD)(FG)(3FTX3FT-3FTX3FT)
|
EA
|
1.000
|
$5,600.000
|
$3,050.000
|
$5,500.000
|
|
|
SET (TY I)(S=3 FT)(HW=3FT)(4:1)(C)
|
EA
|
1.000
|
$7,545.210
|
$7,600.000
|
$7,500.000
|
|
|
SET (TY II) (42 IN) (RCP) (6: 1) (P)
|
EA
|
3.000
|
$7,734.400
|
$4,200.000
|
$4,500.000
|
|
|
SET (TY II) (DES 3) (CMP) (6: 1) (P)
|
EA
|
4.000
|
$4,500.000
|
$2,100.000
|
$1,500.000
|
|
|
REMOV STR (SET)
|
EA
|
4.000
|
$500.000
|
$475.000
|
$1,000.000
|
|
|
REMOV STR (PIPE)
|
LF
|
73.000
|
$15.360
|
$21.000
|
$30.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$83,988.000
|
$80,000.000
|
$165,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
5.000
|
$8,100.000
|
$8,250.000
|
$13,475.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
25.000
|
$8.550
|
$9.000
|
$25.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
170.000
|
$7.500
|
$5.000
|
$7.980
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
170.000
|
$1.500
|
$1.000
|
$1.630
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
260.000
|
$5.200
|
$7.000
|
$10.170
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
260.000
|
$1.500
|
$1.000
|
$1.630
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2) (6:1)
|
LF
|
25.000
|
$42.000
|
$125.000
|
$185.370
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
252.000
|
$25.000
|
$34.000
|
$50.000
|
|
|
DRIVEWAYS (SURF TREAT)
|
SY
|
357.000
|
$30.000
|
$25.000
|
$16.000
|
|
|
TURNOUTS (SURF TREAT)
|
SY
|
44.000
|
$9.660
|
$25.000
|
$20.500
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
3,573.000
|
$0.800
|
$0.250
|
$1.000
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
3,389.000
|
$0.800
|
$0.250
|
$1.200
|
|
|
MAILBOX INSTALL-S (WC-POST) TY 3
|
EA
|
3.000
|
$181.690
|
$250.000
|
$215.000
|
|
|
RELOCATE RD IL ASM (TRANS-BASE)
|
EA
|
2.000
|
$2,000.000
|
$3,850.000
|
$3,000.000
|
|
|
REPLACE LUMINAIRE W/LED (400W EQ)
|
EA
|
4.000
|
$550.000
|
$880.000
|
$1,000.000
|
|
|
CONDT (PVC) (SCH 80) (2")
|
LF
|
441.500
|
$15.000
|
$22.000
|
$12.000
|
|
|
CONDT (PVC) (SCH 80) (2") (BORE)
|
LF
|
152.500
|
$100.000
|
$55.000
|
$28.000
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
1,113.500
|
$1.650
|
$2.200
|
$1.250
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
2,217.000
|
$1.980
|
$2.750
|
$1.500
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
1.000
|
$988.310
|
$1,500.000
|
$1,000.000
|
|
|
GROUND BOX TY D (162922)W/APRON
|
EA
|
2.000
|
$1,000.000
|
$2,100.000
|
$1,150.000
|
|
|
REMOVE ELECTRICAL SERVICES
|
EA
|
1.000
|
$1,000.000
|
$250.000
|
$600.000
|
|
|
ELC SRV TY A 120/240 060(NS)AL(E)SP(O)
|
EA
|
1.000
|
$9,500.000
|
$8,800.000
|
$6,000.000
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
109.500
|
$29.180
|
$33.000
|
$30.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
3.000
|
$700.000
|
$633.000
|
$575.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
4.000
|
$700.000
|
$975.000
|
$885.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
10.000
|
$91.690
|
$110.000
|
$100.000
|
|
|
INSTL OM ASSM (OM-2Y)(WC)GND
|
EA
|
1.000
|
$62.260
|
$80.000
|
$70.000
|
|
|
INSTL OM ASSM (OM-2Y)(WC)GND(BI)
|
EA
|
1.000
|
$58.670
|
$85.000
|
$73.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
161.000
|
$0.500
|
$2.000
|
$1.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
382.000
|
$0.500
|
$2.000
|
$1.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
676.000
|
$0.800
|
$0.940
|
$1.100
|
|
REFL PAV MRK TY I (Y)24"(SLD)(100MIL)
|
LF
|
64.000
|
$12.000
|
$15.000
|
$11.000
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
3,573.000
|
$0.260
|
$0.420
|
$0.440
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
330.000
|
$25.000
|
$0.420
|
$0.650
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
6,998.000
|
$0.290
|
$0.420
|
$0.480
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
8.000
|
$203.030
|
$248.000
|
$220.000
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
8.000
|
$259.590
|
$330.000
|
$320.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
72.000
|
$3.100
|
$6.000
|
$3.500
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
446.000
|
$2.910
|
$5.500
|
$3.350
|
|
|
VEH SIG SEC (12")LED(YEL)
|
EA
|
8.000
|
$238.460
|
$320.000
|
$290.000
|
|
|
VEH SIG SEC (12")LED(RED)
|
EA
|
4.000
|
$232.040
|
$320.000
|
$290.000
|
|
|
INSTALL RDSD FLASH BEACON ASSEMBLY
|
EA
|
2.000
|
$7,500.000
|
$7,920.000
|
$7,200.000
|
|
|
INSTL RDSD FLSH BCN ASSM (SOLAR PWRD)
|
EA
|
4.000
|
$8,500.000
|
$7,700.000
|
$7,000.000
|
|
|
SP MIXES SP-C SAC-B PG76-22
|
TON
|
1,460.000
|
$105.000
|
$116.000
|
$150.000
|
|
|
BONDING COURSE
|
GAL
|
2,123.000
|
$3.170
|
$2.950
|
$3.750
|
|
|
PREFORMED IN-LANE(TRANS) RUMBLE STRIP
|
LF
|
160.000
|
$10.500
|
$11.000
|
$22.500
|
|
|
TMA (STATIONARY)
|
DAY
|
120.000
|
$162.510
|
$60.000
|
$0.010
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
48.000
|
$75.000
|
$28.000
|
$0.010
|
|
Totals: |
$872,672.545
|
$850,894.760
|
$1,036,683.675
|