PREPARING ROW
|
STA
|
12.440
|
$1,500.000
|
$4,000.000
|
$16,750.000
|
$6,660.000
|
$186,031.930
|
$6,200.000
|
|
|
REMOVING CONC (SIDEWALKS)
|
SY
|
189.000
|
$9.500
|
$18.000
|
$40.000
|
$16.650
|
$25.000
|
$12.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
32.000
|
$12.000
|
$70.000
|
$55.000
|
$73.260
|
$50.000
|
$30.000
|
|
|
REMOVING CONC (CURB AND GUTTER)
|
LF
|
1,013.000
|
$7.000
|
$7.000
|
$8.000
|
$9.990
|
$8.000
|
$8.000
|
|
|
REMOVE CONC (RAIL)
|
LF
|
870.000
|
$13.000
|
$18.000
|
$33.000
|
$28.720
|
$125.000
|
$40.000
|
|
|
REMOVING STAB BASE AND ASPH PAV (6")
|
SY
|
56.000
|
$7.000
|
$46.000
|
$50.000
|
$98.340
|
$18.000
|
$30.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
805.000
|
$7.000
|
$12.000
|
$15.000
|
$90.990
|
$20.000
|
$22.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY B)
|
CY
|
921.000
|
$9.000
|
$20.000
|
$20.000
|
$86.790
|
$11.000
|
$22.000
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
11,881.000
|
$1.250
|
$1.120
|
$4.000
|
$1.120
|
$3.000
|
$4.000
|
|
|
BLOCK SODDING
|
SY
|
2,598.000
|
$3.500
|
$5.000
|
$4.250
|
$5.000
|
$6.000
|
$8.000
|
|
|
BROADCAST SEED (PERM) (URBAN) (CLAY)
|
SY
|
9,283.000
|
$0.250
|
$0.220
|
$0.200
|
$0.220
|
$0.190
|
$0.250
|
|
|
BROADCAST SEED (TEMP)(WARM OR COOL)
|
SY
|
9,283.000
|
$0.250
|
$0.220
|
$0.200
|
$0.230
|
$0.190
|
$0.250
|
|
|
VEGETATIVE WATERING
|
MG
|
329.000
|
$20.000
|
$15.000
|
$30.000
|
$49.170
|
$40.000
|
$25.000
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY A)
|
SY
|
9,283.000
|
$1.000
|
$1.200
|
$1.000
|
$1.200
|
$2.000
|
$2.000
|
|
|
PLANT MATERIAL (65 GAL) (TREE)
|
EA
|
8.000
|
$600.380
|
$1,000.000
|
$600.000
|
$100.000
|
$650.000
|
$550.000
|
|
|
AGGR (TY-B GR-4)
|
CY
|
22.000
|
$60.000
|
$140.000
|
$120.000
|
$339.240
|
$120.000
|
$165.000
|
|
|
ASPH(AC-15P,AC-20-5TR,AC-20XP,AC10-2TR)
|
GAL
|
619.000
|
$3.120
|
$5.250
|
$4.500
|
$17.880
|
$4.500
|
$7.000
|
|
|
D-GR HMA TY-B PG64-22
|
TON
|
1,006.000
|
$75.000
|
$88.000
|
$76.000
|
$127.740
|
$76.000
|
$110.000
|
|
|
D-GR HMA TY-C SAC-B PG70-22
|
TON
|
243.000
|
$80.000
|
$105.000
|
$89.000
|
$194.700
|
$89.000
|
$135.000
|
|
|
CEM STABIL BKFL
|
CY
|
65.000
|
$105.000
|
$185.000
|
$200.000
|
$149.900
|
$135.000
|
$150.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
6.000
|
$170.000
|
$175.000
|
$100.000
|
$188.110
|
$265.000
|
$150.000
|
|
|
DRILL SHAFT (24 IN)
|
LF
|
1,646.000
|
$150.000
|
$110.000
|
$193.000
|
$289.180
|
$175.000
|
$200.000
|
|
|
DRILL SHAFT (30 IN)
|
LF
|
304.000
|
$150.000
|
$150.000
|
$255.000
|
$152.320
|
$150.000
|
$165.000
|
|
|
CL C CONC (ABUT)
|
CY
|
38.000
|
$1,000.000
|
$1,015.000
|
$1,600.000
|
$1,288.490
|
$2,000.000
|
$1,300.000
|
|
|
CL C CONC (CAP)
|
CY
|
81.600
|
$1,500.000
|
$2,900.000
|
$2,000.000
|
$1,530.560
|
$2,500.000
|
$2,500.000
|
|
|
CL C CONC (RETAINING WALL)
|
CY
|
232.500
|
$750.000
|
$900.000
|
$950.000
|
$1,213.490
|
$950.000
|
$850.000
|
|
|
CL C CONC (MISC)
|
CY
|
3.500
|
$350.000
|
$500.000
|
$800.000
|
$258.690
|
$600.000
|
$600.000
|
|
|
CL F CONC (COLUMN)
|
CY
|
41.600
|
$1,133.000
|
$5,200.000
|
$3,800.000
|
$6,758.500
|
$4,300.000
|
$8,000.000
|
|
|
PRECAST FINIAL
|
EA
|
104.000
|
$1,000.000
|
$400.000
|
$125.000
|
$260.590
|
$300.000
|
$900.000
|
|
|
REINF CONC SLAB (BOX BEAM)
|
SF
|
21,600.000
|
$15.000
|
$13.000
|
$17.000
|
$25.920
|
$12.000
|
$25.000
|
|
|
BRIDGE SIDEWALK
|
SF
|
8,100.000
|
$10.000
|
$4.000
|
$12.000
|
$12.600
|
$11.000
|
$12.000
|
|
|
SHEAR KEY
|
CY
|
106.200
|
$350.000
|
$600.000
|
$600.000
|
$476.150
|
$350.000
|
$450.000
|
|
|
PRESTR CONC BOX BEAM (5B20)
|
LF
|
3,125.500
|
$200.000
|
$184.250
|
$165.000
|
$210.200
|
$220.000
|
$219.000
|
|
|
PRESTR CONC BOX BEAM (5B20)(MOD)
|
LF
|
893.000
|
$300.000
|
$184.250
|
$166.000
|
$180.040
|
$220.000
|
$218.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
3.000
|
$400.000
|
$700.000
|
$850.000
|
$108.650
|
$550.000
|
$800.000
|
|
|
RIPRAP (STONE TY F)(DRY)(18")
|
CY
|
257.000
|
$500.000
|
$165.000
|
$157.000
|
$250.000
|
$205.000
|
$275.000
|
|
|
STR STEEL (MISC NON - BRIDGE)
|
LB
|
630.000
|
$10.000
|
$13.000
|
$12.000
|
$12.080
|
$14.250
|
$17.000
|
|
|
STR STEEL (MISCELLANEOUS BRIDGE)
|
LB
|
6,696.000
|
$10.000
|
$7.000
|
$7.000
|
$8.630
|
$12.030
|
$14.000
|
|
|
RAIL (TY C411) (MOD)
|
LF
|
1,426.000
|
$300.000
|
$145.000
|
$170.000
|
$182.840
|
$125.090
|
$260.000
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - A)
|
LF
|
93.000
|
$100.000
|
$120.000
|
$180.000
|
$110.340
|
$125.870
|
$85.000
|
|
|
GABION MATTRESSES (GALV)(6 IN)
|
SY
|
30.000
|
$65.000
|
$285.000
|
$105.000
|
$120.000
|
$125.000
|
$150.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
38.000
|
$55.000
|
$130.190
|
$120.000
|
$45.450
|
$100.000
|
$130.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
6.000
|
$65.000
|
$189.510
|
$220.000
|
$55.360
|
$110.000
|
$300.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
117.000
|
$90.000
|
$140.670
|
$130.000
|
$72.120
|
$130.000
|
$150.000
|
|
|
INLET (COMPL)(PCO)(3FT)(LEFT)
|
EA
|
1.000
|
$4,500.000
|
$5,932.230
|
$6,500.000
|
$8,223.190
|
$6,000.000
|
$5,700.000
|
|
|
INLET (COMPL)(PCO)(4FT)(RIGHT)
|
EA
|
1.000
|
$5,000.000
|
$5,903.100
|
$7,000.000
|
$8,197.440
|
$5,200.000
|
$7,200.000
|
|
|
INLET (COMPL)(PCO)(4FT)(BOTH)
|
EA
|
1.000
|
$6,000.000
|
$6,320.930
|
$8,500.000
|
$8,566.760
|
$6,500.000
|
$8,200.000
|
|
|
SET (TY II) (30 IN) (RCP) (3: 1) (C)
|
EA
|
1.000
|
$1,600.000
|
$4,288.440
|
$2,000.000
|
$63,908.860
|
$2,500.000
|
$2,600.000
|
|
|
REMOV STR (PIPE)
|
LF
|
105.000
|
$13.000
|
$31.230
|
$35.000
|
$17.150
|
$40.000
|
$15.000
|
|
|
REMOV STR (BRIDGE SLAB)
|
EA
|
5.000
|
$100,000.000
|
$140,000.000
|
$250,000.000
|
$218,593.230
|
$45,000.000
|
$262,000.000
|
|
|
REMOV STR (ABUTMENT)
|
EA
|
2.000
|
$20,000.000
|
$21,000.000
|
$5,000.000
|
$4,349.700
|
$9,000.000
|
$8,000.000
|
|
|
REMOV STR (BENT)
|
EA
|
6.000
|
$20,000.000
|
$20,000.000
|
$6,000.000
|
$6,042.330
|
$12,000.000
|
$15,000.000
|
|
|
REMOV STR (SMALL)
|
EA
|
2.000
|
$1,000.000
|
$2,000.000
|
$5,000.000
|
$914.720
|
$2,000.000
|
$1,000.000
|
|
|
REMOV STR (SMALL FENCE)
|
LF
|
200.000
|
$10.000
|
$15.000
|
$12.000
|
$42.880
|
$8.000
|
$15.000
|
|
|
REMOV STR (CONC GIRDER SPAN)
|
EA
|
2.000
|
$50,000.000
|
$14,000.000
|
$10,000.000
|
$9,874.370
|
$32,000.000
|
$20,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$338,024.000
|
$451,000.000
|
$452,000.000
|
$414,014.840
|
$650,000.000
|
$720,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
16.000
|
$5,000.000
|
$2,000.000
|
$2,000.000
|
$1,871.600
|
$1,000.000
|
$8,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
365.000
|
$30.000
|
$26.000
|
$27.000
|
$24.000
|
$30.000
|
$28.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 3)
|
LF
|
95.000
|
$50.000
|
$43.750
|
$80.000
|
$44.000
|
$45.000
|
$60.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 5)
|
LF
|
180.000
|
$25.000
|
$52.750
|
$30.000
|
$44.000
|
$52.000
|
$60.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
640.000
|
$7.500
|
$16.950
|
$9.000
|
$18.000
|
$20.000
|
$20.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
260.000
|
$21.000
|
$26.750
|
$12.000
|
$13.000
|
$15.000
|
$20.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
260.000
|
$6.000
|
$16.000
|
$5.000
|
$10.000
|
$8.000
|
$10.000
|
|
|
CONSTRUCTION PERIMETER FENCE
|
LF
|
2,190.000
|
$3.250
|
$2.900
|
$2.500
|
$2.600
|
$6.000
|
$6.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
1,414.000
|
$2.000
|
$2.350
|
$2.250
|
$3.000
|
$4.500
|
$4.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
1,414.000
|
$0.750
|
$0.900
|
$0.300
|
$1.000
|
$2.000
|
$1.000
|
|
|
CONC CURB (TY I)
|
LF
|
958.000
|
$12.000
|
$20.000
|
$25.000
|
$26.220
|
$15.000
|
$20.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
99.000
|
$65.000
|
$120.000
|
$120.000
|
$135.570
|
$75.000
|
$88.000
|
|
|
CONC SIDEWALKS (4")
|
SY
|
885.000
|
$43.500
|
$40.000
|
$60.000
|
$50.520
|
$50.000
|
$70.000
|
|
|
CURB RAMPS (TY 1)
|
EA
|
1.000
|
$1,400.000
|
$1,965.200
|
$2,500.000
|
$2,415.720
|
$2,500.000
|
$2,200.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
250.000
|
$2.000
|
$5.000
|
$1.390
|
$3.750
|
$5.000
|
$4.000
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(N)(TL2)
|
EA
|
4.000
|
$14,750.000
|
$21,970.000
|
$15,750.000
|
$16,536.000
|
$17,000.000
|
$18,000.000
|
|
|
CHAIN LINK FENCE (INSTALL) (6')
|
LF
|
25.000
|
$20.000
|
$50.000
|
$40.000
|
$94.000
|
$100.000
|
$135.000
|
|
|
CHAIN LINK FENCE (REMOVE)
|
LF
|
424.000
|
$6.000
|
$5.000
|
$10.000
|
$3.550
|
$5.000
|
$4.000
|
|
|
REMOVE RD IL ASM (BRIDGE MOUNT)
|
EA
|
16.000
|
$200.000
|
$370.000
|
$370.000
|
$370.000
|
$483.870
|
$800.000
|
|
|
CONDT (PVC) (SCH 40) (1")
|
LF
|
1,500.000
|
$6.750
|
$9.000
|
$9.000
|
$9.000
|
$9.000
|
$12.000
|
|
|
CONDT (PVC) (SCH 40) (1 1/4")
|
LF
|
20.000
|
$7.250
|
$47.000
|
$47.000
|
$47.000
|
$47.000
|
$20.000
|
|
|
ELEC CONDR (NO.10) INSULATED
|
LF
|
7,830.000
|
$1.250
|
$1.500
|
$2.000
|
$1.500
|
$1.500
|
$1.500
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
1.000
|
$750.000
|
$1,250.000
|
$1,300.000
|
$1,250.000
|
$1,250.000
|
$1,300.000
|
|
|
ELC SRV TY D 120/240 060(NS)SS(E)SP(U)
|
EA
|
1.000
|
$4,500.000
|
$7,100.000
|
$7,100.000
|
$7,100.000
|
$7,100.000
|
$6,500.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
3.000
|
$475.000
|
$525.000
|
$600.000
|
$598.000
|
$525.000
|
$600.000
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
4.000
|
$375.000
|
$450.000
|
$450.000
|
$590.000
|
$450.000
|
$550.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
3.000
|
$72.000
|
$115.000
|
$115.000
|
$175.000
|
$115.000
|
$150.000
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND
|
EA
|
1.000
|
$46.000
|
$85.000
|
$85.000
|
$45.500
|
$85.000
|
$100.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
17.000
|
$5.500
|
$15.000
|
$25.000
|
$20.000
|
$15.000
|
$70.000
|
|
|
PAVEMENT SEALER 4"
|
LF
|
2,475.000
|
$1.000
|
$2.000
|
$1.000
|
$0.500
|
$2.000
|
$0.750
|
|
|
PAVEMENT SEALER 24"
|
LF
|
17.000
|
$1.000
|
$10.000
|
$5.000
|
$4.000
|
$10.000
|
$32.000
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
20.000
|
$0.500
|
$4.500
|
$3.500
|
$2.500
|
$4.500
|
$70.000
|
|
|
REF PROF PAV MRK TY I(W)4"(SLD)(100MIL)
|
LF
|
65.000
|
$0.550
|
$4.500
|
$7.000
|
$5.000
|
$4.500
|
$70.000
|
|
|
REF PROF PAV MRK TY I(Y)4"(SLD)(100MIL)
|
LF
|
2,390.000
|
$0.550
|
$4.500
|
$7.000
|
$5.000
|
$4.500
|
$7.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
2.000
|
$3.250
|
$15.000
|
$7.000
|
$5.000
|
$15.000
|
$28.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
31.000
|
$3.250
|
$15.000
|
$7.000
|
$5.000
|
$15.000
|
$28.000
|
|
|
ANTI - GRAFFITI COATNG(PERMNENT-TY III)
|
SF
|
2,882.000
|
$0.750
|
$0.870
|
$1.000
|
$0.740
|
$0.870
|
$2.000
|
|
|
TEMP CONSTRUCTION ACCESS
|
LS
|
1.000
|
$100,000.000
|
$30,000.000
|
$45,000.000
|
$290,400.000
|
$350,000.000
|
$1,000,000.000
|
|
|
BRIDGE PLAQUE
|
EA
|
2.000
|
$2,000.000
|
$3,454.650
|
$600.000
|
$3,540.090
|
$3,500.000
|
$5,000.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
28.000
|
$75.000
|
$120.410
|
$84.450
|
$300.000
|
$150.000
|
$350.000
|
|
|
DECORATIVE ILLUMINATION ASSEMBLY
|
EA
|
22.000
|
$3,725.000
|
$2,670.000
|
$2,670.000
|
$2,670.000
|
$2,670.000
|
$4,500.000
|
|
Totals: |
$4,568,463.870
|
$4,518,896.305
|
$5,299,204.500
|
$6,113,824.756
|
$7,112,475.639
|
$7,616,099.250
|