Job Info for 0913-26-062

County: COLORADO Highway: CR Date: 02/06/2020 (4 years ago) Engineer's Estimate: $1,335,782 Control Number: 0913-26-062
Project: BR 2018(904) District: YOAKUM Time: 287 WORKING DAYS Type: REPLACE BRIDGE AND APPROACHES
HCS
Pay Estimates: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $1,335,781.70
TREVWAY, INC.   $1,385,689.52 1
3.74% | $49,907.82
SB CONTRACTORS LLC   $1,443,723.34 2
8.08% | $107,941.64
4.19% | $58,033.82
FUQUA CONSTRUCTION CO., INC.   $1,679,392.30 3
25.72% | $343,610.60
21.2% | $293,702.78
16.32% | $235,668.96
PROJECT ALLIED RESOURCES, LLC   $1,874,661.29 4
40.34% | $538,879.59
35.29% | $488,971.77
11.63% | $195,268.99

Bid Items

Items: 38, 0 filtered
COLORADO CR  |  YOAKUM  |  0913-26-062  |  02/06/2020  |  $1,335,782  |  BR 2018(904)  |  REPLACE BRIDGE AND APPROACHES  |  287 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate TREVWAY, INC. SB CONTRACTORS LLC FUQUA CONSTRUCTION CO., INC. PROJECT ALLIED RESOURCES, LLC
100 6002 PREPARING ROW STA 14.150 $3,000.000 $1,200.000 $2,500.000 $1,627.441 $10,200.000
110 6001 EXCAVATION (ROADWAY) CY 327.000 $20.000 $9.000 $11.570 $30.000 $26.300
110 6002 EXCAVATION (CHANNEL) CY 290.000 $20.000 $9.000 $7.480 $40.000 $33.800
110 6004 EXCAVATION (ROADWAY AND CHANNEL) CY 213.000 $20.000 $9.000 $11.960 $40.000 $30.000
132 6005 EMBANKMENT (FINAL)(ORD COMP)(TY C) CY 787.000 $35.000 $15.000 $28.230 $40.000 $65.000
150 6002 BLADING HR 80.000 $100.000 $25.000 $92.030 $33.000 $168.000
164 6003 BROADCAST SEED (PERM) (RURAL) (CLAY) SY 4,473.000 $1.000 $0.660 $1.190 $1.010 $2.190
164 6009 BROADCAST SEED (TEMP) (WARM) SY 1,120.000 $1.000 $0.660 $1.190 $1.760 $0.980
164 6011 BROADCAST SEED (TEMP) (COOL) SY 1,120.000 $1.000 $0.660 $1.190 $1.760 $0.980
168 6001 VEGETATIVE WATERING MG 45.900 $25.000 $50.000 $56.930 $12.640 $144.000
247 6366 FL BS (CMP IN PLC)(TY A GR 5)(FNAL POS) CY 866.000 $100.000 $112.000 $109.440 $126.150 $162.000
316 6029 ASPH (RC-250) GAL 738.000 $20.000 $22.000 $12.930 $58.520 $16.200
316 6202 AGGR(TY-E GR-5 SAC-B) CY 30.000 $400.000 $450.000 $460.530 $997.500 $367.000
316 6249 AGGR(TY-PE GR-4 SAC-B) CY 37.000 $400.000 $450.000 $390.820 $997.500 $277.000
316 6400 ASPH (AC-15P OR AC-10-2TR OR CRS-2P) GAL 1,249.000 $20.000 $33.000 $9.520 $37.240 $13.400
400 6005 CEM STABIL BKFL CY 107.000 $120.000 $100.000 $193.270 $150.000 $186.000
407 6001 SHEET PILING (PZ - 27) SF 768.000 $45.000 $99.000 $118.080 $91.810 $60.000
409 6002 PRESTR CONC PIL (18 IN SQ) LF 416.000 $110.000 $191.000 $112.400 $187.660 $142.000
416 6002 DRILL SHAFT (24 IN) LF 432.000 $180.000 $315.000 $175.770 $267.730 $290.000
420 6013 CL C CONC (ABUT) CY 81.400 $1,000.000 $667.000 $1,207.110 $1,089.790 $1,490.000
420 6029 CL C CONC (CAP) CY 13.200 $1,100.000 $1,189.000 $2,406.850 $1,460.930 $1,710.000
420 6037 CL C CONC (COLUMN) CY 3.500 $1,200.000 $2,800.000 $3,082.690 $4,816.290 $1,710.000
422 6007 REINF CONC SLAB (SLAB BEAM) SF 6,110.000 $20.000 $17.000 $28.650 $22.320 $28.300
425 6010 PRESTR CONC SLAB BEAM (5SB12) LF 442.500 $185.000 $201.000 $203.640 $267.860 $154.000
425 6012 PRESTR CONC SLAB BEAM (5SB15) LF 717.410 $170.000 $182.000 $251.200 $267.860 $154.000
432 6002 RIPRAP (CONC)(5 IN) CY 46.000 $370.000 $350.000 $77.870 $412.300 $806.000
432 6031 RIPRAP (STONE PROTECTION)(12 IN) CY 372.000 $140.000 $170.000 $153.500 $227.220 $271.000
450 6018 RAIL (TY T631) LF 566.000 $75.000 $82.000 $87.390 $97.870 $145.000
454 6004 ARMOR JOINT (SEALED) LF 178.000 $75.000 $73.000 $81.030 $102.300 $134.000
496 6009 REMOV STR (BRIDGE 0 - 99 FT LENGTH) EA 4.000 $25,000.000 $25,000.000 $9,176.810 $9,975.000 $26,700.000
500 6001 MOBILIZATION LS 1.000 $120,000.000 $140,000.000 $143,000.000 $132,335.000 $208,000.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 20.000 $3,000.000 $600.000 $576.250 $951.670 $1,680.000
506 6038 TEMP SEDMT CONT FENCE (INSTALL) LF 3,491.000 $3.000 $2.000 $2.590 $3.680 $5.600
506 6039 TEMP SEDMT CONT FENCE (REMOVE) LF 3,491.000 $1.000 $0.500 $1.480 $0.680 $2.080
540 6001 MTL W-BEAM GD FEN (TIM POST) LF 400.000 $25.000 $23.840 $29.520 $24.680 $25.000
544 6001 GUARDRAIL END TREATMENT (INSTALL) EA 16.000 $2,800.000 $2,417.420 $2,922.590 $3,690.750 $2,475.000
552 6001 WIRE FENCE (TY A) LF 443.000 $20.000 $6.000 $12.340 $26.600 $23.100
658 6062 INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI) EA 30.000 $20.000 $11.000 $29.530 $33.250 $51.000
Totals: $1,335,781.70 $1,385,689.52 $1,443,723.36 $1,679,392.33 $1,874,661.29