County: COLORADO Highway: CR Date: 04/05/2017 (7 years ago) Engineer's Estimate: $231,797 Control Number: 0913-26-058
Project: BR 2012(731) District: YOAKUM Time: 40 WORKING DAYS Type: REPLACE BRIDGE AND APPROACHES

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $231,797.00
TREVWAY, INC.   $233,008.00 1
0.52% | $1,211.00
SB CONTRACTORS LLC   $233,126.26 2
0.57% | $1,329.26
0.05% | $118.26
TMES LLC   $299,246.93 3
29.1% | $67,449.93
28.43% | $66,238.93
28.36% | $66,120.67
FUQUA CONSTRUCTION CO., INC.   $309,463.76 4
33.51% | $77,666.76
32.81% | $76,455.76
3.41% | $10,216.83
TCB CONSTRUCTION, INC   $323,442.40 5
39.54% | $91,645.40
38.81% | $90,434.40
4.52% | $13,978.64
BXB GROUP INCORPORATION   $331,313.00 6
42.93% | $99,516.00
42.19% | $98,305.00
2.43% | $7,870.60
ANGEL BROTHERS HOLDINGS CORP.   $348,475.00 7
50.34% | $116,678.00
49.55% | $115,467.00
5.18% | $17,162.00

Bid Items

Items: 28, 0 filtered
COLORADO CR  |  YOAKUM  |  0913-26-058  |  04/05/2017  |  $231,797  |  BR 2012(731)  |  REPLACE BRIDGE AND APPROACHES  |  40 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate TREVWAY, INC. SB CONTRACTORS LLC TMES LLC FUQUA CONSTRUCTION CO., INC. TCB CONSTRUCTION, INC BXB GROUP INCORPORATION ANGEL BROTHERS HOLDINGS CORP.
100 6002 PREPARING ROW STA 1.000 $2,000.000 $5,500.000 $5,000.000 $500.000 $2,240.080 $3,500.000 $4,000.000 $34,000.000
112 6001 SUBGRADE WIDENING (ORD COMP) STA 2.530 $500.000 $3,000.000 $2,000.000 $600.000 $400.670 $4,500.000 $5,400.000 $2,000.000
132 6021 EMBANKMENT (VEHICLE)(ORD COMP)(TY C) CY 50.000 $30.000 $10.000 $35.000 $75.000 $72.220 $35.000 $83.000 $40.000
150 6002 BLADING HR 5.000 $150.000 $100.000 $65.000 $75.000 $66.140 $100.000 $305.000 $100.000
164 6001 BROADCAST SEED (PERM) (RURAL) (SANDY) SY 810.000 $0.750 $0.500 $1.100 $2.300 $2.130 $2.000 $2.000 $2.000
164 6009 BROADCAST SEED (TEMP) (WARM) SY 203.000 $0.750 $0.500 $1.000 $2.300 $1.420 $2.000 $2.000 $2.000
164 6011 BROADCAST SEED (TEMP) (COOL) SY 203.000 $0.750 $0.500 $1.000 $0.010 $1.420 $2.000 $2.000 $2.000
168 6001 VEGETATIVE WATERING MG 4.500 $100.000 $100.000 $45.000 $92.000 $48.110 $20.000 $424.000 $50.000
334 6076 HMCL ACP TY-D AC-0.6 TON 229.000 $125.000 $200.000 $220.000 $230.000 $146.060 $165.000 $239.000 $170.000
400 6005 CEM STABIL BKFL CY 76.000 $100.000 $90.000 $155.000 $160.000 $181.490 $150.000 $157.000 $100.000
402 6001 TRENCH EXCAVATION PROTECTION LF 70.000 $25.000 $22.000 $5.000 $50.000 $79.270 $18.000 $30.000 $40.000
432 6002 RIPRAP (CONC)(5 IN) CY 4.000 $500.000 $400.000 $375.000 $500.000 $890.580 $850.000 $1,416.000 $640.000
432 6024 RIPRAP (STONE COMMON)(DRY)(12 IN) CY 28.000 $180.000 $200.000 $185.000 $175.000 $209.270 $175.000 $221.000 $150.000
462 6026 CONC BOX CULV (9 FT X 7 FT) LF 120.000 $700.000 $579.000 $615.000 $700.000 $841.990 $954.920 $1,067.000 $800.000
466 6183 WINGWALL (PW - 1) (HW=8 FT) EA 2.000 $24,000.000 $15,000.000 $10,500.000 $21,939.000 $29,687.850 $26,600.000 $15,520.000 $30,000.000
496 6009 REMOV STR (BRIDGE 0 - 99 FT LENGTH) EA 1.000 $10,000.000 $15,000.000 $8,567.760 $15,000.000 $8,277.350 $20,000.000 $11,216.000 $20,000.000
500 6001 MOBILIZATION LS 1.000 $17,000.000 $23,000.000 $20,000.000 $42,000.000 $32,063.510 $30,000.000 $18,115.000 $34,000.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 1.000 $2,500.000 $1,800.000 $2,500.000 $4,000.000 $1,651.320 $5,000.000 $14,400.000 $11,000.000
506 6001 ROCK FILTER DAMS (INSTALL) (TY 1) LF 50.000 $35.000 $25.000 $50.000 $40.000 $35.430 $35.000 $31.000 $35.000
506 6011 ROCK FILTER DAMS (REMOVE) LF 50.000 $10.000 $15.000 $15.000 $10.000 $14.170 $15.000 $10.000 $10.000
506 6038 TEMP SEDMT CONT FENCE (INSTALL) LF 340.000 $4.500 $3.000 $4.000 $4.000 $7.090 $7.000 $3.000 $5.000
506 6039 TEMP SEDMT CONT FENCE (REMOVE) LF 340.000 $2.000 $2.000 $1.500 $2.000 $2.830 $3.000 $1.000 $1.500
540 6001 MTL W-BEAM GD FEN (TIM POST) LF 100.000 $20.000 $20.000 $46.000 $53.000 $35.430 $25.000 $24.000 $50.000
540 6020 MTL W - BEAM GD FEN (LOW FILL CULVERT) LF 50.000 $50.000 $44.000 $70.800 $83.000 $177.130 $50.000 $54.000 $80.000
542 6001 REMOVE METAL BEAM GUARD FENCE LF 150.000 $1.500 $2.000 $5.000 $2.000 $17.000 $5.000 $3.000 $20.000
544 6001 GUARDRAIL END TREATMENT (INSTALL) EA 4.000 $2,200.000 $2,000.000 $2,529.000 $2,900.000 $3,400.920 $2,500.000 $2,625.000 $2,600.000
658 6062 INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI) EA 6.000 $30.000 $100.000 $18.000 $20.000 $59.520 $50.000 $75.000 $18.000
658 6073 INSTL OM ASSM (OM-2Y)(WC)GND(BI) EA 4.000 $60.000 $100.000 $50.000 $60.000 $92.110 $75.000 $75.000 $50.000
Totals: $231,797.00 $233,008.00 $233,126.26 $299,246.93 $309,463.77 $323,442.40 $331,313.00 $348,475.00