COLORADO US 90 (0027-01-044)

Items: 151

County: COLORADO
Length: N/A
Highway: US 90
District: YOAKUM
Control Number: 0027-01-044
DBE Goal: N/A
Project: BR 2019(850)
Guaranty: N/A
Time: 405 WORKING DAYS
Engineer's Estimate: $8,536,798.50
Date: 05/07/2019 (7 years ago)
Contract Number: N/A
Type: CONSTRUCT ONE WAY BRIDGE AND APPR
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$8,536,798.50
$8,244,674.88
Over/Under Est: -3.42% -$292,123.62
$8,479,275.84
Over/Under Est: -0.67% -$57,522.66
Amt Left: 2.85% $234,600.96
Over/Under Est: 5.05% $431,368.59
Amt Left: 8.78% $723,492.21
Delta: -5.77% -$488,891.25
$14,671,505.10
Over/Under Est: 71.86% $6,134,706.60
Amt Left: 77.95% $6,426,830.22
Delta: -63.60% -$5,703,338.01
Subcontractor Percentage Amount
HB FARMER FOUNDATION, LLC 8.67% $1,031,306.41
CHOCTAW ERECTORS, INC. 5.73% $681,590.05
GMJ PAVING CO. 2.07% $246,228.87
CRAIG & HEIDT, INC. 1.10% $130,846.26
WILLOW CITY SIGN & RAIL, INC. 1.08% $128,467.23
DORAN STEEL, INC. 0.65% $77,318.24
MCL CONTRACTING, LLC 0.57% $67,802.15
JB PINNACLE GROUP, LLC 0.55% $65,423.13
BATTERSON, LLP 0.44% $52,338.50
EAST - TEX PIPE AND FAB LLC 0.39% $46,390.95
DORAN STEEL, INC. 0.38% $45,201.43
PEREZ CONSTRUCTION CO. 0.33% $39,253.88
A1 EROSION CONTROL 0.26% $30,927.30
PRIMATE CONSTRUCTION, LP 0.07% $8,326.58
SEMPER STRIPING LLC 0.02% $2,379.02
Total: 22.31% $2,653,800.00

Bid Items & Bid Tabulations

151 Total 0 of 151
COLORADO  |  US 90  |  YOAKUM  |  0027-01-044  |  05/07/2019  |  $8,536,798.50  |  BR 2019(850)  |  CONSTRUCT ONE WAY BRIDGE AND APPR  |  405 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
HARPER BROTHERS CONSTRUCTION LLC
ISI CONTRACTING, INC.
JAMES CONSTRUCTION GROUP, L.L.C.
EARTH BUILDERS, L.P.
PREPARING ROW
STA 20.390 $10,000.000 $4,500.000 $2,200.000 $3,500.000 $20,000.000
PREP ROW (TREE) (18"-36" DIA.)
EA 8.000 $2,000.000 $2,500.000 $500.000 $2,950.000 $3,500.000
REMOVING CONC (SIDEWALKS)
SY 38.000 $30.000 $10.000 $5.000 $18.000 $30.000
REMOVING CONC (DRIVEWAYS)
SY 195.000 $20.000 $4.000 $18.000 $16.000 $30.000
REMOVE CONC (GUTTER)
LF 201.000 $10.000 $4.000 $7.000 $17.000 $20.000
REMOVING CONC (MISC)
SY 140.000 $30.000 $10.000 $4.000 $18.000 $30.000
EXCAVATION (ROADWAY)
CY 4,342.000 $15.000 $10.000 $24.000 $7.500 $20.000
EMBANKMENT (FINAL)(ORD COMP)(TY C)
CY 18,787.000 $17.500 $10.000 $18.000 $20.000 $65.000
BACKFILL (TY B)
STA 9.000 $200.000 $650.000 $1,500.000 $190.000 $300.000
BLADING
HR 50.000 $120.000 $85.000 $80.000 $170.000 $120.000
BLOCK SODDING
SY 882.000 $6.000 $5.000 $6.000 $3.750 $8.000
CELL FBR MLCH SEED(PERM)(RURAL)(SANDY)
SY 22,993.000 $0.500 $0.310 $0.400 $0.450 $0.500
CELL FBR MLCH SEED(TEMP)(WARM)
SY 5,749.000 $0.500 $0.290 $0.320 $0.450 $0.500
CELL FBR MLCH SEED(TEMP)(COOL)
SY 5,749.000 $0.500 $0.290 $0.320 $0.450 $0.500
VEGETATIVE WATERING
MG 198.900 $30.000 $40.000 $15.000 $25.000 $100.000
SOIL RETENTION BLANKETS (CL 2) (TY G)
SY 1,558.000 $6.000 $3.250 $4.000 $5.850 $6.000
FL BS (CMP IN PLC)(TYE GR1-2)(FNAL POS)
CY 3,206.000 $65.000 $60.000 $82.000 $118.000 $85.000
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
TON 119.000 $175.000 $145.000 $180.000 $225.000 $250.000
LIME TRT (SUBGRADE)(6")
SY 8,736.000 $5.000 $5.500 $2.100 $5.000 $12.000
PRIME COAT (MC-30)
GAL 1,582.000 $5.500 $9.350 $5.000 $8.500 $10.000
AGGR(TY-PB GR-4 SAC-B)
CY 128.000 $100.000 $340.000 $378.000 $680.080 $500.000
ASPH (AC-15P OR AC-10-2TR OR CRS-2P)
GAL 4,978.000 $5.000 $6.050 $7.000 $8.500 $10.000
D-GR HMA TY-D SAC-B PG70-22
TON 1,089.000 $100.000 $128.000 $190.000 $212.530 $200.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
SY 1,278.000 $65.000 $95.000 $52.000 $205.000 $85.000
PLANE ASPH CONC PAV (1.5")
SY 261.000 $30.000 $38.000 $46.000 $30.000 $30.000
CEM STABIL BKFL
CY 1,163.000 $150.000 $65.000 $44.000 $140.000 $80.000
CUT & RESTORE ASPH PAVING
SY 34.000 $200.000 $125.000 $145.000 $341.730 $200.000
TRENCH EXCAVATION PROTECTION
LF 710.000 $10.000 $1.000 $2.000 $6.000 $20.000
TEMPORARY SPL SHORING
SF 275.000 $20.000 $220.000 $45.000 $26.000 $25.000
DRILL SHAFT (36 IN)
LF 470.000 $300.000 $225.000 $225.000 $240.000 $350.000
DRILL SHAFT (48 IN)
LF 696.000 $400.000 $425.000 $490.000 $450.000 $600.000
DRILL SHAFT (54 IN)
LF 392.000 $500.000 $925.000 $660.000 $585.000 $650.000
DRILL SHAFT (60 IN)
LF 720.000 $700.000 $1,500.000 $800.000 $700.000 $1,000.000
CL C CONC (ABUT)
CY 60.500 $1,100.000 $1,200.000 $1,100.000 $1,100.000 $2,000.000
CL C CONC (BENT)
CY 513.000 $1,350.000 $1,200.000 $910.000 $900.000 $3,000.000
CL C CONC (RAIL FOUNDATION)
CY 4.600 $750.000 $975.000 $2,000.000 $1,000.000 $1,000.000
REINF CONC SLAB
SF 34,425.000 $18.000 $19.000 $20.000 $25.000 $32.000
RETAINING WALL (CAST - IN - PLACE)
SF 371.000 $80.000 $90.000 $135.000 $90.000 $180.000
PRESTR CONC GIRDER (TX46)
LF 1,317.500 $170.000 $150.000 $154.000 $230.000 $250.000
RIPRAP (CONC)(5 IN)
CY 78.000 $500.000 $600.000 $473.000 $600.000 $750.000
RIPRAP (STONE PROTECTION)(12 IN)
CY 482.000 $165.000 $200.000 $220.000 $209.350 $85.000
RIPRAP (STONE PROTECTION)(30 IN)
CY 274.000 $175.000 $220.000 $250.000 $261.280 $200.000
RIPRAP (CONC)(FLUME)
CY 7.000 $600.000 $600.000 $930.000 $1,000.000 $750.000
RIPRAP (MOW STRIP)(4 IN)
CY 31.000 $550.000 $600.000 $700.000 $525.000 $750.000
ELASTOMERIC BEARING (E5)
EA 5.000 $2,500.000 $550.000 $300.000 $475.000 $1,500.000
ELASTOMERIC BEARING (F5)
EA 5.000 $2,500.000 $550.000 $300.000 $475.000 $1,500.000
SLIDING ELASTOMERIC BEARING (ES 4)
EA 5.000 $2,500.000 $550.000 $300.000 $475.000 $1,500.000
ELASTOMERIC BEARING(EE4)
EA 5.000 $2,500.000 $550.000 $300.000 $475.000 $1,500.000
STR STEEL (MISC NON - BRIDGE)
LB 312.000 $20.000 $10.000 $16.000 $22.000 $20.000
STR STEEL (PLATE GIRDER)(TXDOT PROV)
LB 1,154,000.000 $1.000 $0.750 $1.000 $0.650 $2.500
RAIL (TY T223)
LF 787.000 $100.000 $100.000 $115.000 $85.000 $130.000
RAIL (TY SSTR)
LF 899.000 $80.000 $80.000 $72.000 $60.000 $120.000
RAIL (TY C223)
LF 787.000 $120.000 $120.000 $89.000 $135.000 $160.000
RAIL (HANDRAIL)(TY B)
LF 324.000 $150.000 $75.000 $61.000 $190.000 $120.000
SEALED EXPAN JT (4 IN) (SEJ - M) (GALV)
LF 148.000 $100.000 $100.000 $95.000 $165.000 $110.000
GABIONS (5'X 3')(GALV)
CY 14.000 $250.000 $275.000 $750.000 $1,000.000 $480.000
CONC BOX CULV (4 FT X 4 FT)
LF 427.000 $350.000 $400.000 $380.000 $330.000 $450.000
RC PIPE (CL III)(12 IN)
LF 92.000 $70.000 $75.000 $68.000 $75.000 $65.000
RC PIPE (CL III)(15 IN)
LF 20.000 $75.000 $145.000 $55.000 $80.000 $85.000
RC PIPE (CL III)(24 IN)
LF 346.000 $85.000 $100.000 $110.000 $75.000 $120.000
RC PIPE (CL III)(30 IN)
LF 20.000 $135.000 $135.000 $170.000 $110.000 $160.000
MANH (COMPL)(PRM)(48IN)
EA 1.000 $4,800.000 $4,700.000 $5,300.000 $4,500.000 $6,500.000
INLET (COMPL)(PCO)(3FT)(RIGHT)
EA 1.000 $5,000.000 $6,000.000 $4,800.000 $6,200.000 $6,500.000
INLET (COMPL)(PCO)(6FT)(RIGHT)
EA 1.000 $6,000.000 $7,200.000 $5,800.000 $7,500.000 $7,500.000
INLET (COMPL)(PSL)(RC)(6FTX6FT)
EA 2.000 $9,500.000 $14,350.000 $15,300.000 $16,500.000 $12,000.000
INLET (COMPL)(PSL)(FG)(3FTX3FT-3FTX3FT)
EA 1.000 $3,800.000 $6,400.000 $4,300.000 $5,400.000 $4,500.000
INLET (COMPL)(PAZD)(RC)(3FTX3FT)
EA 1.000 $12,000.000 $10,500.000 $15,000.000 $8,500.000 $15,000.000
INLET(COMPL)(DROP)(TY 1)(1 GRATE)
EA 3.000 $4,100.000 $4,800.000 $4,300.000 $6,200.000 $6,500.000
INLET(COMPL)(DROP)(TY 1 )(2 GRATE)
EA 3.000 $4,800.000 $6,400.000 $5,600.000 $8,200.000 $6,500.000
INLET(COMPL)(DROP)(TY 1)(3 GRATE)
EA 1.000 $5,500.000 $10,150.000 $6,700.000 $9,700.000 $6,500.000
WINGWALL (FW - 0) (HW=6 FT)
EA 1.000 $15,000.000 $14,000.000 $23,000.000 $7,100.000 $12,000.000
SET (TY II) (12 IN) (RCP) (6: 1) (P)
EA 1.000 $1,000.000 $1,850.000 $1,600.000 $3,100.000 $1,500.000
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 1.000 $1,500.000 $1,934.270 $2,300.000 $3,600.000 $2,500.000
SET (TY II) (30 IN) (RCP) (4: 1) (C)
EA 2.000 $2,500.000 $3,080.000 $2,700.000 $3,600.000 $4,500.000
GRATE AND FRAME (BRIDGE DRAIN)
EA 1.000 $3,500.000 $2,030.000 $3,500.000 $4,000.000 $3,500.000
PIPE (PVC) (SCH 40) (6 IN)
LF 34.000 $70.000 $45.000 $220.000 $75.000 $30.000
REMOV STR (INLET)
EA 5.000 $1,000.000 $205.000 $650.000 $850.000 $500.000
REMOV STR (MANHOLE)
EA 1.000 $1,200.000 $405.000 $600.000 $1,400.000 $700.000
REMOV STR (HEADWALL)
EA 1.000 $1,250.000 $405.000 $935.000 $6,000.000 $1,200.000
REMOV STR (PIPE)
LF 762.000 $25.000 $15.000 $30.000 $48.000 $25.000
MOBILIZATION
LS 1.000 $750,000.000 $800,000.000 $750,000.000 $869,555.000 $1,400,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 27.000 $5,000.000 $3,000.000 $1,300.000 $1,100.000 $5,000.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 195.000 $30.000 $60.000 $25.000 $25.000 $35.000
ROCK FILTER DAMS (REMOVE)
LF 195.000 $10.000 $10.000 $18.000 $10.000 $10.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 372.000 $30.000 $50.000 $30.000 $18.000 $30.000
CONSTRUCTION EXITS (REMOVE)
SY 372.000 $10.000 $2.000 $7.000 $7.000 $10.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 5,160.000 $2.500 $3.500 $2.250 $2.500 $4.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 5,160.000 $1.000 $1.000 $0.300 $0.750 $1.000
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 142.000 $6.000 $8.000 $3.900 $5.000 $8.000
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 44.000 $8.000 $8.000 $5.500 $10.000 $12.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 186.000 $1.500 $2.000 $1.700 $2.000 $1.500
CONSTRUCTING DETOURS
SY 1,254.000 $80.000 $50.000 $140.000 $190.000 $300.000
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
LF 420.000 $75.000 $25.000 $102.000 $70.000 $85.000
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 240.000 $20.000 $7.500 $27.000 $12.000 $25.000
PORT CTB (REMOVE)(SGL SLP)(TY 1)
LF 480.000 $25.000 $10.000 $21.000 $27.000 $40.000
CONC CURB (TY II)
LF 9.000 $25.000 $40.000 $13.000 $170.000 $15.000
CONC CURB & GUTTER (TY I)
LF 294.000 $30.000 $50.000 $56.000 $70.000 $35.000
CONC CURB & GUTTER (TY II)
LF 207.000 $30.000 $50.000 $56.000 $65.000 $35.000
CONC SIDEWALKS (4")
SY 724.000 $60.000 $75.000 $51.000 $60.000 $70.000
CURB RAMPS (TY 1)
EA 3.000 $2,200.000 $1,800.000 $1,800.000 $1,900.000 $2,500.000
CURB RAMPS (TY 2)
EA 1.000 $2,200.000 $1,800.000 $1,800.000 $2,600.000 $2,500.000
CURB RAMPS (TY 7)
EA 2.000 $2,200.000 $1,800.000 $1,800.000 $3,500.000 $2,500.000
MTL W-BEAM GD FEN (TIM POST)
LF 600.000 $25.000 $25.000 $20.000 $20.050 $25.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 5.000 $2,000.000 $1,830.000 $2,300.000 $2,600.000 $1,800.000
REMOVE METAL BEAM GUARD FENCE
LF 326.000 $3.000 $5.000 $2.000 $1.500 $3.000
REMOVE TERMINAL ANCHOR SECTION
EA 2.000 $150.000 $450.000 $100.000 $125.000 $250.000
GUARDRAIL END TREATMENT (INSTALL)
EA 1.000 $2,500.000 $2,745.000 $3,300.000 $2,745.000 $3,200.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 1.000 $1,600.000 $3,900.000 $1,700.000 $1,500.000 $2,000.000
CRASH CUSH ATTEN (REMOVE)
EA 2.000 $1,000.000 $1,500.000 $680.000 $500.000 $1,200.000
CRASH CUSH ATTEN (INSTL)(R)(W)(TL2)
EA 1.000 $15,000.000 $29,000.000 $35,000.000 $27,414.000 $35,000.000
CRASH CUSH ATTEN (INSTL)(R)(W)(TL3)
EA 1.000 $22,000.000 $28,400.000 $38,000.000 $28,600.000 $50,000.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL2)
EA 1.000 $10,000.000 $10,050.000 $9,700.000 $6,800.000 $9,500.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 1.000 $12,000.000 $10,300.000 $9,900.000 $7,000.000 $9,500.000
MAILBOX INSTALL-S (WC-POST) TY 3
EA 1.000 $180.000 $300.000 $171.000 $162.500 $350.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
EA 1.000 $700.000 $675.000 $600.000 $605.860 $600.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T-2EXT)
EA 1.000 $700.000 $800.000 $1,000.000 $659.080 $800.000
IN SM RD SN SUP&AM TYS80(1)SA(U-WC)
EA 1.000 $950.000 $986.000 $905.000 $841.950 $1,200.000
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 13.000 $400.000 $365.000 $350.000 $354.600 $500.000
IN SM RD SN SUP&AM TYTWT(1)WS(T)
EA 3.000 $425.000 $440.000 $450.000 $407.250 $500.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 3.000 $450.000 $460.000 $500.000 $480.000 $600.000
REMOVE SM RD SN SUP&AM
EA 18.000 $110.000 $100.000 $125.000 $85.000 $95.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 23.000 $25.000 $25.000 $17.000 $15.860 $25.000
INSTL OM ASSM (OM-4)(FLX)GND
EA 6.000 $85.000 $380.000 $260.000 $227.740 $200.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 8.000 $40.000 $42.000 $15.000 $19.110 $50.000
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 7,160.000 $0.350 $0.500 $0.280 $0.230 $0.300
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 7,102.000 $0.350 $0.500 $0.280 $0.230 $0.300
WK ZN PAV MRK REMOV (REFL) TY II-A-A
EA 222.000 $4.500 $5.000 $4.400 $5.000 $5.000
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 3,339.000 $1.000 $1.250 $1.000 $0.700 $0.700
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 4,696.000 $1.000 $1.250 $1.000 $0.700 $0.700
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 846.000 $2.000 $1.310 $1.100 $1.170 $2.500
REFL PAV MRK TY I (W)8"(DOT)(090MIL)
LF 59.000 $1.750 $2.000 $2.200 $2.000 $2.500
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 683.000 $1.500 $1.000 $1.700 $1.000 $2.000
REFL PAV MRK TY I (W)24"(SLD)(090MIL)
LF 132.000 $6.000 $2.000 $5.500 $6.000 $6.000
RE PM W/RET REQ TY I (W)4"(BRK)(090MIL)
LF 75.000 $1.700 $2.000 $0.750 $1.000 $1.000
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
LF 6,229.000 $0.750 $1.000 $0.700 $0.540 $0.800
RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL)
LF 40.000 $1.700 $2.000 $0.700 $1.000 $0.800
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
LF 6,152.000 $0.750 $1.000 $0.700 $0.540 $0.800
PREFAB PAV MRK TY C (W) (12") (SLD)
LF 208.000 $8.000 $10.000 $7.000 $6.000 $7.000
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 203.000 $15.000 $20.000 $13.000 $12.000 $15.000
PREFAB PAV MRK TY C (W) (ARROW)
EA 2.000 $300.000 $350.000 $330.000 $245.000 $350.000
PREFAB PAV MRK TY C (W) (WORD)
EA 2.000 $350.000 $300.000 $500.000 $295.000 $500.000
REFL PAV MRKR TY I-C
EA 43.000 $4.500 $5.000 $4.000 $4.500 $5.000
REFL PAV MRKR TY II-A-A
EA 160.000 $4.500 $5.000 $4.000 $4.500 $5.000
ELIM EXT PAV MRK & MRKS (4")
LF 8,637.000 $0.500 $1.250 $0.450 $0.570 $0.600
ELIM EXT PAV MRK & MRKS (24")
LF 70.000 $5.000 $3.000 $3.300 $2.000 $4.000
PAV SURF PREP FOR MRK (4")
LF 3,068.000 $0.100 $0.250 $0.440 $0.180 $0.500
TEMP CONSTRUCTION ACCESS
LS 1.000 $1,000,000.000 $600,000.000 $1,020,000.000 $1,021,000.000 $800,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $14,000.000 $7,500.000 $12,000.000 $17,750.000 $30,000.000
DEAD END ROADWAY BARRICADE
LF 16.000 $120.000 $250.000 $56.000 $157.500 $150.000
TMA (STATIONARY)
EA 2.000 $12,000.000 $725.000 $3,500.000 $5,000.000 $30,000.000
TMA (MOBILE OPERATION)
DAY 30.000 $500.000 $275.000 $190.000 $391.000 $250.000
Totals: $8,536,798.500 $8,244,674.880 $8,479,275.840 $8,968,167.090 $14,671,505.100