PREPARING ROW
|
STA
|
20.390
|
$10,000.000
|
$4,500.000
|
$2,200.000
|
$3,500.000
|
$20,000.000
|
|
|
PREP ROW (TREE) (18"-36" DIA.)
|
EA
|
8.000
|
$2,000.000
|
$2,500.000
|
$500.000
|
$2,950.000
|
$3,500.000
|
|
|
REMOVING CONC (SIDEWALKS)
|
SY
|
38.000
|
$30.000
|
$10.000
|
$5.000
|
$18.000
|
$30.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
195.000
|
$20.000
|
$4.000
|
$18.000
|
$16.000
|
$30.000
|
|
|
REMOVE CONC (GUTTER)
|
LF
|
201.000
|
$10.000
|
$4.000
|
$7.000
|
$17.000
|
$20.000
|
|
|
REMOVING CONC (MISC)
|
SY
|
140.000
|
$30.000
|
$10.000
|
$4.000
|
$18.000
|
$30.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
4,342.000
|
$15.000
|
$10.000
|
$24.000
|
$7.500
|
$20.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY C)
|
CY
|
18,787.000
|
$17.500
|
$10.000
|
$18.000
|
$20.000
|
$65.000
|
|
|
BACKFILL (TY B)
|
STA
|
9.000
|
$200.000
|
$650.000
|
$1,500.000
|
$190.000
|
$300.000
|
|
|
BLADING
|
HR
|
50.000
|
$120.000
|
$85.000
|
$80.000
|
$170.000
|
$120.000
|
|
|
BLOCK SODDING
|
SY
|
882.000
|
$6.000
|
$5.000
|
$6.000
|
$3.750
|
$8.000
|
|
|
CELL FBR MLCH SEED(PERM)(RURAL)(SANDY)
|
SY
|
22,993.000
|
$0.500
|
$0.310
|
$0.400
|
$0.450
|
$0.500
|
|
|
CELL FBR MLCH SEED(TEMP)(WARM)
|
SY
|
5,749.000
|
$0.500
|
$0.290
|
$0.320
|
$0.450
|
$0.500
|
|
|
CELL FBR MLCH SEED(TEMP)(COOL)
|
SY
|
5,749.000
|
$0.500
|
$0.290
|
$0.320
|
$0.450
|
$0.500
|
|
|
VEGETATIVE WATERING
|
MG
|
198.900
|
$30.000
|
$40.000
|
$15.000
|
$25.000
|
$100.000
|
|
|
SOIL RETENTION BLANKETS (CL 2) (TY G)
|
SY
|
1,558.000
|
$6.000
|
$3.250
|
$4.000
|
$5.850
|
$6.000
|
|
|
FL BS (CMP IN PLC)(TYE GR1-2)(FNAL POS)
|
CY
|
3,206.000
|
$65.000
|
$60.000
|
$82.000
|
$118.000
|
$85.000
|
|
|
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
|
TON
|
119.000
|
$175.000
|
$145.000
|
$180.000
|
$225.000
|
$250.000
|
|
|
LIME TRT (SUBGRADE)(6")
|
SY
|
8,736.000
|
$5.000
|
$5.500
|
$2.100
|
$5.000
|
$12.000
|
|
|
PRIME COAT (MC-30)
|
GAL
|
1,582.000
|
$5.500
|
$9.350
|
$5.000
|
$8.500
|
$10.000
|
|
|
AGGR(TY-PB GR-4 SAC-B)
|
CY
|
128.000
|
$100.000
|
$340.000
|
$378.000
|
$680.080
|
$500.000
|
|
|
ASPH (AC-15P OR AC-10-2TR OR CRS-2P)
|
GAL
|
4,978.000
|
$5.000
|
$6.050
|
$7.000
|
$8.500
|
$10.000
|
|
|
D-GR HMA TY-D SAC-B PG70-22
|
TON
|
1,089.000
|
$100.000
|
$128.000
|
$190.000
|
$212.530
|
$200.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
|
SY
|
1,278.000
|
$65.000
|
$95.000
|
$52.000
|
$205.000
|
$85.000
|
|
|
PLANE ASPH CONC PAV (1.5")
|
SY
|
261.000
|
$30.000
|
$38.000
|
$46.000
|
$30.000
|
$30.000
|
|
|
CEM STABIL BKFL
|
CY
|
1,163.000
|
$150.000
|
$65.000
|
$44.000
|
$140.000
|
$80.000
|
|
|
CUT & RESTORE ASPH PAVING
|
SY
|
34.000
|
$200.000
|
$125.000
|
$145.000
|
$341.730
|
$200.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
710.000
|
$10.000
|
$1.000
|
$2.000
|
$6.000
|
$20.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
275.000
|
$20.000
|
$220.000
|
$45.000
|
$26.000
|
$25.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
470.000
|
$300.000
|
$225.000
|
$225.000
|
$240.000
|
$350.000
|
|
|
DRILL SHAFT (48 IN)
|
LF
|
696.000
|
$400.000
|
$425.000
|
$490.000
|
$450.000
|
$600.000
|
|
|
DRILL SHAFT (54 IN)
|
LF
|
392.000
|
$500.000
|
$925.000
|
$660.000
|
$585.000
|
$650.000
|
|
|
DRILL SHAFT (60 IN)
|
LF
|
720.000
|
$700.000
|
$1,500.000
|
$800.000
|
$700.000
|
$1,000.000
|
|
|
CL C CONC (ABUT)
|
CY
|
60.500
|
$1,100.000
|
$1,200.000
|
$1,100.000
|
$1,100.000
|
$2,000.000
|
|
|
CL C CONC (BENT)
|
CY
|
513.000
|
$1,350.000
|
$1,200.000
|
$910.000
|
$900.000
|
$3,000.000
|
|
|
CL C CONC (RAIL FOUNDATION)
|
CY
|
4.600
|
$750.000
|
$975.000
|
$2,000.000
|
$1,000.000
|
$1,000.000
|
|
|
REINF CONC SLAB
|
SF
|
34,425.000
|
$18.000
|
$19.000
|
$20.000
|
$25.000
|
$32.000
|
|
|
RETAINING WALL (CAST - IN - PLACE)
|
SF
|
371.000
|
$80.000
|
$90.000
|
$135.000
|
$90.000
|
$180.000
|
|
|
PRESTR CONC GIRDER (TX46)
|
LF
|
1,317.500
|
$170.000
|
$150.000
|
$154.000
|
$230.000
|
$250.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
78.000
|
$500.000
|
$600.000
|
$473.000
|
$600.000
|
$750.000
|
|
|
RIPRAP (STONE PROTECTION)(12 IN)
|
CY
|
482.000
|
$165.000
|
$200.000
|
$220.000
|
$209.350
|
$85.000
|
|
|
RIPRAP (STONE PROTECTION)(30 IN)
|
CY
|
274.000
|
$175.000
|
$220.000
|
$250.000
|
$261.280
|
$200.000
|
|
|
RIPRAP (CONC)(FLUME)
|
CY
|
7.000
|
$600.000
|
$600.000
|
$930.000
|
$1,000.000
|
$750.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
31.000
|
$550.000
|
$600.000
|
$700.000
|
$525.000
|
$750.000
|
|
|
ELASTOMERIC BEARING (E5)
|
EA
|
5.000
|
$2,500.000
|
$550.000
|
$300.000
|
$475.000
|
$1,500.000
|
|
|
ELASTOMERIC BEARING (F5)
|
EA
|
5.000
|
$2,500.000
|
$550.000
|
$300.000
|
$475.000
|
$1,500.000
|
|
|
SLIDING ELASTOMERIC BEARING (ES 4)
|
EA
|
5.000
|
$2,500.000
|
$550.000
|
$300.000
|
$475.000
|
$1,500.000
|
|
|
ELASTOMERIC BEARING(EE4)
|
EA
|
5.000
|
$2,500.000
|
$550.000
|
$300.000
|
$475.000
|
$1,500.000
|
|
|
STR STEEL (MISC NON - BRIDGE)
|
LB
|
312.000
|
$20.000
|
$10.000
|
$16.000
|
$22.000
|
$20.000
|
|
|
STR STEEL (PLATE GIRDER)(TXDOT PROV)
|
LB
|
1,154,000.000
|
$1.000
|
$0.750
|
$1.000
|
$0.650
|
$2.500
|
|
|
RAIL (TY T223)
|
LF
|
787.000
|
$100.000
|
$100.000
|
$115.000
|
$85.000
|
$130.000
|
|
|
RAIL (TY SSTR)
|
LF
|
899.000
|
$80.000
|
$80.000
|
$72.000
|
$60.000
|
$120.000
|
|
|
RAIL (TY C223)
|
LF
|
787.000
|
$120.000
|
$120.000
|
$89.000
|
$135.000
|
$160.000
|
|
|
RAIL (HANDRAIL)(TY B)
|
LF
|
324.000
|
$150.000
|
$75.000
|
$61.000
|
$190.000
|
$120.000
|
|
|
SEALED EXPAN JT (4 IN) (SEJ - M) (GALV)
|
LF
|
148.000
|
$100.000
|
$100.000
|
$95.000
|
$165.000
|
$110.000
|
|
|
GABIONS (5'X 3')(GALV)
|
CY
|
14.000
|
$250.000
|
$275.000
|
$750.000
|
$1,000.000
|
$480.000
|
|
|
CONC BOX CULV (4 FT X 4 FT)
|
LF
|
427.000
|
$350.000
|
$400.000
|
$380.000
|
$330.000
|
$450.000
|
|
|
RC PIPE (CL III)(12 IN)
|
LF
|
92.000
|
$70.000
|
$75.000
|
$68.000
|
$75.000
|
$65.000
|
|
|
RC PIPE (CL III)(15 IN)
|
LF
|
20.000
|
$75.000
|
$145.000
|
$55.000
|
$80.000
|
$85.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
346.000
|
$85.000
|
$100.000
|
$110.000
|
$75.000
|
$120.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
20.000
|
$135.000
|
$135.000
|
$170.000
|
$110.000
|
$160.000
|
|
|
MANH (COMPL)(PRM)(48IN)
|
EA
|
1.000
|
$4,800.000
|
$4,700.000
|
$5,300.000
|
$4,500.000
|
$6,500.000
|
|
|
INLET (COMPL)(PCO)(3FT)(RIGHT)
|
EA
|
1.000
|
$5,000.000
|
$6,000.000
|
$4,800.000
|
$6,200.000
|
$6,500.000
|
|
|
INLET (COMPL)(PCO)(6FT)(RIGHT)
|
EA
|
1.000
|
$6,000.000
|
$7,200.000
|
$5,800.000
|
$7,500.000
|
$7,500.000
|
|
|
INLET (COMPL)(PSL)(RC)(6FTX6FT)
|
EA
|
2.000
|
$9,500.000
|
$14,350.000
|
$15,300.000
|
$16,500.000
|
$12,000.000
|
|
|
INLET (COMPL)(PSL)(FG)(3FTX3FT-3FTX3FT)
|
EA
|
1.000
|
$3,800.000
|
$6,400.000
|
$4,300.000
|
$5,400.000
|
$4,500.000
|
|
|
INLET (COMPL)(PAZD)(RC)(3FTX3FT)
|
EA
|
1.000
|
$12,000.000
|
$10,500.000
|
$15,000.000
|
$8,500.000
|
$15,000.000
|
|
|
INLET(COMPL)(DROP)(TY 1)(1 GRATE)
|
EA
|
3.000
|
$4,100.000
|
$4,800.000
|
$4,300.000
|
$6,200.000
|
$6,500.000
|
|
|
INLET(COMPL)(DROP)(TY 1 )(2 GRATE)
|
EA
|
3.000
|
$4,800.000
|
$6,400.000
|
$5,600.000
|
$8,200.000
|
$6,500.000
|
|
|
INLET(COMPL)(DROP)(TY 1)(3 GRATE)
|
EA
|
1.000
|
$5,500.000
|
$10,150.000
|
$6,700.000
|
$9,700.000
|
$6,500.000
|
|
|
WINGWALL (FW - 0) (HW=6 FT)
|
EA
|
1.000
|
$15,000.000
|
$14,000.000
|
$23,000.000
|
$7,100.000
|
$12,000.000
|
|
|
SET (TY II) (12 IN) (RCP) (6: 1) (P)
|
EA
|
1.000
|
$1,000.000
|
$1,850.000
|
$1,600.000
|
$3,100.000
|
$1,500.000
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
1.000
|
$1,500.000
|
$1,934.270
|
$2,300.000
|
$3,600.000
|
$2,500.000
|
|
|
SET (TY II) (30 IN) (RCP) (4: 1) (C)
|
EA
|
2.000
|
$2,500.000
|
$3,080.000
|
$2,700.000
|
$3,600.000
|
$4,500.000
|
|
|
GRATE AND FRAME (BRIDGE DRAIN)
|
EA
|
1.000
|
$3,500.000
|
$2,030.000
|
$3,500.000
|
$4,000.000
|
$3,500.000
|
|
|
PIPE (PVC) (SCH 40) (6 IN)
|
LF
|
34.000
|
$70.000
|
$45.000
|
$220.000
|
$75.000
|
$30.000
|
|
|
REMOV STR (INLET)
|
EA
|
5.000
|
$1,000.000
|
$205.000
|
$650.000
|
$850.000
|
$500.000
|
|
|
REMOV STR (MANHOLE)
|
EA
|
1.000
|
$1,200.000
|
$405.000
|
$600.000
|
$1,400.000
|
$700.000
|
|
|
REMOV STR (HEADWALL)
|
EA
|
1.000
|
$1,250.000
|
$405.000
|
$935.000
|
$6,000.000
|
$1,200.000
|
|
|
REMOV STR (PIPE)
|
LF
|
762.000
|
$25.000
|
$15.000
|
$30.000
|
$48.000
|
$25.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$750,000.000
|
$800,000.000
|
$750,000.000
|
$869,555.000
|
$1,400,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
27.000
|
$5,000.000
|
$3,000.000
|
$1,300.000
|
$1,100.000
|
$5,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
195.000
|
$30.000
|
$60.000
|
$25.000
|
$25.000
|
$35.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
195.000
|
$10.000
|
$10.000
|
$18.000
|
$10.000
|
$10.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
372.000
|
$30.000
|
$50.000
|
$30.000
|
$18.000
|
$30.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
372.000
|
$10.000
|
$2.000
|
$7.000
|
$7.000
|
$10.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
5,160.000
|
$2.500
|
$3.500
|
$2.250
|
$2.500
|
$4.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
5,160.000
|
$1.000
|
$1.000
|
$0.300
|
$0.750
|
$1.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (8")
|
LF
|
142.000
|
$6.000
|
$8.000
|
$3.900
|
$5.000
|
$8.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
44.000
|
$8.000
|
$8.000
|
$5.500
|
$10.000
|
$12.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
186.000
|
$1.500
|
$2.000
|
$1.700
|
$2.000
|
$1.500
|
|
|
CONSTRUCTING DETOURS
|
SY
|
1,254.000
|
$80.000
|
$50.000
|
$140.000
|
$190.000
|
$300.000
|
|
|
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
|
LF
|
420.000
|
$75.000
|
$25.000
|
$102.000
|
$70.000
|
$85.000
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
240.000
|
$20.000
|
$7.500
|
$27.000
|
$12.000
|
$25.000
|
|
|
PORT CTB (REMOVE)(SGL SLP)(TY 1)
|
LF
|
480.000
|
$25.000
|
$10.000
|
$21.000
|
$27.000
|
$40.000
|
|
|
CONC CURB (TY II)
|
LF
|
9.000
|
$25.000
|
$40.000
|
$13.000
|
$170.000
|
$15.000
|
|
|
CONC CURB & GUTTER (TY I)
|
LF
|
294.000
|
$30.000
|
$50.000
|
$56.000
|
$70.000
|
$35.000
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
207.000
|
$30.000
|
$50.000
|
$56.000
|
$65.000
|
$35.000
|
|
|
CONC SIDEWALKS (4")
|
SY
|
724.000
|
$60.000
|
$75.000
|
$51.000
|
$60.000
|
$70.000
|
|
|
CURB RAMPS (TY 1)
|
EA
|
3.000
|
$2,200.000
|
$1,800.000
|
$1,800.000
|
$1,900.000
|
$2,500.000
|
|
|
CURB RAMPS (TY 2)
|
EA
|
1.000
|
$2,200.000
|
$1,800.000
|
$1,800.000
|
$2,600.000
|
$2,500.000
|
|
|
CURB RAMPS (TY 7)
|
EA
|
2.000
|
$2,200.000
|
$1,800.000
|
$1,800.000
|
$3,500.000
|
$2,500.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
600.000
|
$25.000
|
$25.000
|
$20.000
|
$20.050
|
$25.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
5.000
|
$2,000.000
|
$1,830.000
|
$2,300.000
|
$2,600.000
|
$1,800.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
326.000
|
$3.000
|
$5.000
|
$2.000
|
$1.500
|
$3.000
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
2.000
|
$150.000
|
$450.000
|
$100.000
|
$125.000
|
$250.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
1.000
|
$2,500.000
|
$2,745.000
|
$3,300.000
|
$2,745.000
|
$3,200.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
1.000
|
$1,600.000
|
$3,900.000
|
$1,700.000
|
$1,500.000
|
$2,000.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
2.000
|
$1,000.000
|
$1,500.000
|
$680.000
|
$500.000
|
$1,200.000
|
|
|
CRASH CUSH ATTEN (INSTL)(R)(W)(TL2)
|
EA
|
1.000
|
$15,000.000
|
$29,000.000
|
$35,000.000
|
$27,414.000
|
$35,000.000
|
|
|
CRASH CUSH ATTEN (INSTL)(R)(W)(TL3)
|
EA
|
1.000
|
$22,000.000
|
$28,400.000
|
$38,000.000
|
$28,600.000
|
$50,000.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL2)
|
EA
|
1.000
|
$10,000.000
|
$10,050.000
|
$9,700.000
|
$6,800.000
|
$9,500.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
1.000
|
$12,000.000
|
$10,300.000
|
$9,900.000
|
$7,000.000
|
$9,500.000
|
|
|
MAILBOX INSTALL-S (WC-POST) TY 3
|
EA
|
1.000
|
$180.000
|
$300.000
|
$171.000
|
$162.500
|
$350.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
|
EA
|
1.000
|
$700.000
|
$675.000
|
$600.000
|
$605.860
|
$600.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T-2EXT)
|
EA
|
1.000
|
$700.000
|
$800.000
|
$1,000.000
|
$659.080
|
$800.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-WC)
|
EA
|
1.000
|
$950.000
|
$986.000
|
$905.000
|
$841.950
|
$1,200.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(P)
|
EA
|
13.000
|
$400.000
|
$365.000
|
$350.000
|
$354.600
|
$500.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(T)
|
EA
|
3.000
|
$425.000
|
$440.000
|
$450.000
|
$407.250
|
$500.000
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
3.000
|
$450.000
|
$460.000
|
$500.000
|
$480.000
|
$600.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
18.000
|
$110.000
|
$100.000
|
$125.000
|
$85.000
|
$95.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
23.000
|
$25.000
|
$25.000
|
$17.000
|
$15.860
|
$25.000
|
|
|
INSTL OM ASSM (OM-4)(FLX)GND
|
EA
|
6.000
|
$85.000
|
$380.000
|
$260.000
|
$227.740
|
$200.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
8.000
|
$40.000
|
$42.000
|
$15.000
|
$19.110
|
$50.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
7,160.000
|
$0.350
|
$0.500
|
$0.280
|
$0.230
|
$0.300
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
7,102.000
|
$0.350
|
$0.500
|
$0.280
|
$0.230
|
$0.300
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-A-A
|
EA
|
222.000
|
$4.500
|
$5.000
|
$4.400
|
$5.000
|
$5.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
3,339.000
|
$1.000
|
$1.250
|
$1.000
|
$0.700
|
$0.700
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
4,696.000
|
$1.000
|
$1.250
|
$1.000
|
$0.700
|
$0.700
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
846.000
|
$2.000
|
$1.310
|
$1.100
|
$1.170
|
$2.500
|
|
REFL PAV MRK TY I (W)8"(DOT)(090MIL)
|
LF
|
59.000
|
$1.750
|
$2.000
|
$2.200
|
$2.000
|
$2.500
|
|
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
|
LF
|
683.000
|
$1.500
|
$1.000
|
$1.700
|
$1.000
|
$2.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(090MIL)
|
LF
|
132.000
|
$6.000
|
$2.000
|
$5.500
|
$6.000
|
$6.000
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(090MIL)
|
LF
|
75.000
|
$1.700
|
$2.000
|
$0.750
|
$1.000
|
$1.000
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
|
LF
|
6,229.000
|
$0.750
|
$1.000
|
$0.700
|
$0.540
|
$0.800
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL)
|
LF
|
40.000
|
$1.700
|
$2.000
|
$0.700
|
$1.000
|
$0.800
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
|
LF
|
6,152.000
|
$0.750
|
$1.000
|
$0.700
|
$0.540
|
$0.800
|
|
PREFAB PAV MRK TY C (W) (12") (SLD)
|
LF
|
208.000
|
$8.000
|
$10.000
|
$7.000
|
$6.000
|
$7.000
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
203.000
|
$15.000
|
$20.000
|
$13.000
|
$12.000
|
$15.000
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
2.000
|
$300.000
|
$350.000
|
$330.000
|
$245.000
|
$350.000
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
2.000
|
$350.000
|
$300.000
|
$500.000
|
$295.000
|
$500.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
43.000
|
$4.500
|
$5.000
|
$4.000
|
$4.500
|
$5.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
160.000
|
$4.500
|
$5.000
|
$4.000
|
$4.500
|
$5.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
8,637.000
|
$0.500
|
$1.250
|
$0.450
|
$0.570
|
$0.600
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
70.000
|
$5.000
|
$3.000
|
$3.300
|
$2.000
|
$4.000
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
3,068.000
|
$0.100
|
$0.250
|
$0.440
|
$0.180
|
$0.500
|
|
|
TEMP CONSTRUCTION ACCESS
|
LS
|
1.000
|
$1,000,000.000
|
$600,000.000
|
$1,020,000.000
|
$1,021,000.000
|
$800,000.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$14,000.000
|
$7,500.000
|
$12,000.000
|
$17,750.000
|
$30,000.000
|
|
|
DEAD END ROADWAY BARRICADE
|
LF
|
16.000
|
$120.000
|
$250.000
|
$56.000
|
$157.500
|
$150.000
|
|
|
TMA (STATIONARY)
|
EA
|
2.000
|
$12,000.000
|
$725.000
|
$3,500.000
|
$5,000.000
|
$30,000.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
30.000
|
$500.000
|
$275.000
|
$190.000
|
$391.000
|
$250.000
|
|
Totals: |
$8,536,798.500
|
$8,244,674.880
|
$8,479,275.840
|
$8,968,167.090
|
$14,671,505.100
|