COLORADO US 90 (0026-06-031)

Items: 49

County: COLORADO
Length: N/A
Highway: US 90
District: YOAKUM
Control Number: 0026-06-031
DBE Goal: N/A
Project: F 2023(670)
Guaranty: N/A
Time: 60 WORKING DAYS
Engineer's Estimate: $5,565,161.65
Date: 05/04/2023 (3 years ago)
Contract Number: N/A
Type: SURFACING/ROADWAY RESTORATION
Mail/Deliver Bids To: N/A
RYAN SIMPER
PAUL RODRIGUEZ
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$5,565,161.65
$5,565,142.56
Over/Under Est: 0% -$19.09
Over/Under Est: 3.28% $182,737.98
Amt Left: 3.28% $182,757.07
Over/Under Est: 9.5% $528,748.12
Amt Left: 9.5% $528,767.21
Delta: -6.02% -$346,010.14
$6,932,300.60
Over/Under Est: 24.57% $1,367,138.95
Amt Left: 24.57% $1,367,158.04
Delta: -13.76% -$838,390.83
Subcontractor Percentage Amount
VULCAN MATERIALS ASPHALT AND CONSTRUCTION, LLC 38.57% $2,310,550.05
D. I. J. CONSTRUCTION, INC. 2.80% $167,735.03
QUICK MATERIALS 2.69% $161,145.44
SOUTHWEST ROAD & SAFETY CONTRACTORS, LTD. 1.40% $83,867.52
A BROTHERS MILLING, LLC 1.33% $79,674.14
CPAVE, INC. 0.50% $29,952.68
LONESTAR TRAFFIC SAFETY, LLC 0.23% $13,778.23
WEST TEXAS ROCK RESOURCES, LLC 0.20% $11,981.07
Total: 47.72% $2,858,684.16

Bid Items & Bid Tabulations

49 Total 0 of 49
COLORADO  |  US 90  |  YOAKUM  |  0026-06-031  |  05/04/2023  |  $5,565,161.65  |  F 2023(670)  |  SURF/ROADWAY RESTOR  |  60 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
JAMES CONSTRUCTION GROUP, LLC
HUNTER INDUSTRIES, LTD.
TEXAS MATERIALS GROUP, INC.
CK NEWBERRY, LLC
EMBANKMENT (VEHICLE)(ORD COMP)(TY C)
CY 460.000 $35.000 $75.000 $50.600 $107.000 $125.000
BACKFILL (TY A)
STA 356.560 $200.000 $285.000 $115.000 $364.000 $135.000
BACKFILL (TY B)
STA 19.010 $175.000 $955.000 $161.000 $748.000 $250.000
AGGR(TY-PE GR-4 SAC-B)
CY 574.000 $140.000 $190.000 $131.100 $200.500 $215.000
ASPH (AC-15P OR AC-10-2TR OR CRS-2P)
GAL 25,271.000 $4.750 $3.650 $4.970 $3.250 $5.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(10")
SY 1,600.000 $71.500 $80.000 $100.370 $104.750 $125.000
PLANE ASPH CONC PAV(0" TO 2")
SY 70,876.000 $2.000 $2.500 $2.130 $5.100 $2.000
PLANE ASPH CONC PAV(0" TO 6")
SY 3,143.000 $3.500 $7.300 $7.080 $10.000 $7.000
FULL - DEPTH REPAIR CPJR (10")
SY 700.000 $330.000 $485.000 $247.950 $134.000 $250.000
CLEANING AND SEALING EXISTING JOINTS
LF 720.000 $35.000 $19.500 $21.060 $33.500 $50.000
RETROFIT RAIL (TY SSTR)
LF 455.740 $170.000 $300.000 $323.950 $234.000 $325.000
MOBILIZATION
LS 1.000 $500,000.000 $245,000.000 $513,459.320 $246,000.000 $650,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 4.000 $3,000.000 $22,000.000 $4,148.230 $859.000 $15,000.000
PORT CTB (DES SOURCE)(SGL SLP)(TY 1)
LF 450.000 $15.000 $13.000 $43.410 $23.000 $50.000
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 330.000 $25.000 $14.000 $44.070 $25.000 $50.000
PORT CTB (REMOVE)(SGL SLP)(TY 1)
LF 450.000 $15.000 $13.000 $32.540 $23.000 $50.000
RUMBLE STRIPS (SHOULDER)
LF 65,286.000 $0.500 $0.500 $0.120 $0.060 $0.150
RUMBLE STRIPS (CENTERLINE)
LF 32,643.000 $0.500 $0.550 $0.120 $0.090 $0.200
MTL W-BEAM GD FEN (TIM POST)
LF 225.000 $28.000 $25.810 $32.070 $26.300 $35.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $2,250.000 $3,598.620 $2,327.110 $2,050.000 $2,500.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 1.000 $1,600.000 $1,369.610 $1,614.400 $1,395.000 $1,700.000
REMOVE METAL BEAM GUARD FENCE
LF 400.000 $2.000 $3.160 $3.240 $3.250 $5.000
REMOVE TERMINAL ANCHOR SECTION
EA 14.000 $225.000 $189.640 $215.970 $193.000 $325.000
GUARDRAIL END TREATMENT (INSTALL)
EA 13.000 $3,350.000 $3,160.650 $3,644.540 $3,200.000 $4,000.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 2.000 $1,200.000 $1,474.970 $944.880 $1,500.000 $1,100.000
CRASH CUSH ATTEN (REMOVE)
EA 2.000 $850.000 $716.420 $809.900 $730.000 $1,000.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 2.000 $9,000.000 $9,007.850 $9,168.050 $9,175.000 $13,000.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 20.000 $25.000 $21.000 $53.990 $22.500 $15.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 18.000 $33.500 $40.000 $53.990 $43.000 $25.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 3,250.000 $1.250 $1.000 $1.770 $0.800 $1.500
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 8,058.000 $1.250 $1.000 $1.770 $0.800 $1.000
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 1,019.000 $1.250 $1.350 $1.400 $2.150 $1.500
PREFAB PAV MRK TY C (W) (18") (SLD)
LF 155.000 $8.700 $11.180 $11.610 $10.750 $12.000
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 718.000 $20.000 $12.900 $13.390 $13.450 $14.000
PREFAB PAV MRK TY C (W) (ARROW)
EA 41.000 $300.000 $249.620 $259.170 $242.000 $250.000
PREFAB PAV MRK TY C (W) (WORD)
EA 10.000 $290.000 $348.430 $361.750 $295.000 $350.000
PREFAB PAV MRK TY C (W) (RR XING)
EA 1.000 $700.000 $847.660 $880.090 $965.000 $950.000
PREFAB PAV MRK TY C (Y) (12") (SLD)
LF 731.000 $10.000 $6.240 $6.480 $7.000 $7.000
REFL PAV MRKR TY I-C
EA 202.000 $4.000 $6.500 $6.750 $6.150 $7.000
REFL PAV MRKR TY II-A-A
EA 1,388.000 $5.000 $6.500 $6.750 $6.150 $7.000
D-GR HMA TY-D SAC-B PG70-22
TON 29,860.000 $118.000 $117.000 $123.000 $136.250 $150.000
D-GR HMA TY-D PG70-22 (LEVEL-UP)
TON 1,179.000 $150.000 $132.000 $120.800 $184.500 $155.000
TACK COAT
GAL 21,977.000 $4.500 $2.200 $4.090 $3.000 $3.000
TMA (STATIONARY)
DAY 40.000 $300.000 $275.000 $377.950 $178.000 $400.000
TMA (MOBILE OPERATION)
DAY 20.000 $300.000 $650.000 $539.930 $594.000 $300.000
HPPM-RIB W/RET REQ TYI(W)6"(BRK)100MIL
LF 3,005.000 $0.850 $0.880 $0.920 $0.910 $1.000
HPPM-RIB W/RET REQ TYI(W)6"(SLD)100MIL
LF 94,382.000 $0.850 $0.860 $0.900 $0.860 $1.000
HPPM-RIB W/RET REQ TYI(Y)6"(BRK)100MIL
LF 13,152.000 $0.850 $0.880 $0.920 $0.910 $1.000
HPPM-RIB W/RET REQ TYI(Y)6"(SLD)100MIL
LF 34,847.000 $0.850 $0.890 $0.890 $0.860 $1.000
Totals: $5,565,161.650 $5,565,142.560 $5,747,899.633 $6,093,909.770 $6,932,300.600