Job Info for 0026-04-048

County: COLORADO Highway: US 90 Date: 09/06/2024 (2 months ago) Engineer's Estimate: $3,046,351 Control Number: 0026-04-048
Project: C 26-4-48 District: YOAKUM Time: 270 WORKING DAYS Type: BICYCLE AND PEDESTRIAN IMPROVEMENTS
Bidder's List
Informational:

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $3,046,350.50
3LW CIVIL LLC   $2,778,932.59 1
-8.78% | -$267,417.91
TI-ZACK CONCRETE, LLC   $2,994,307.48 2
-1.71% | -$52,043.02
7.75% | $215,374.89
DIGG COMMERCIAL, LLC   $3,041,973.60 3
-0.14% | -$4,376.90
9.47% | $263,041.01
1.59% | $47,666.12
PROJECT ALLIED RESOURCES, LLC   $3,229,797.12 4
6.02% | $183,446.62
16.22% | $450,864.53
6.17% | $187,823.52
FNH CONSTRUCTION, LLC   $3,414,866.00 5
12.1% | $368,515.50
22.88% | $635,933.41
5.73% | $185,068.88

Bid Items

Items: 45, 0 filtered
COLORADO US 90  |  YOAKUM  |  0026-04-048  |  09/06/2024  |  $3,046,351  |  C 26-4-48  |  BICYCLE AND PEDESTRIAN IMPRVS  |  270 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate 3LW CIVIL LLC TI-ZACK CONCRETE, LLC DIGG COMMERCIAL, LLC PROJECT ALLIED RESOURCES, LLC FNH CONSTRUCTION, LLC
100 6004 PREPARING ROW(TREE)(12" TO 24" DIA) EA 2.000 $3,000.000 $650.000 $2,508.000 $2,500.000 $3,020.000 $5,000.000
104 6017 REMOVING CONC (DRIVEWAYS) SY 2,547.000 $25.000 $25.000 $33.480 $25.000 $16.600 $20.000
104 6021 REMOVING CONC (CURB) LF 361.000 $14.000 $12.500 $11.050 $15.000 $6.300 $20.000
104 6022 REMOVING CONC (CURB AND GUTTER) LF 1,766.000 $23.000 $14.000 $9.040 $25.000 $7.800 $20.000
104 6028 REMOVING CONC (MISC) SY 86.000 $30.000 $50.000 $28.770 $77.000 $20.300 $20.000
110 6001 EXCAVATION (ROADWAY) CY 167.000 $11.000 $35.000 $47.780 $32.000 $36.500 $20.000
132 6021 EMBANKMENT (VEHICLE)(ORD COMP)(TY C) CY 928.000 $27.000 $45.000 $8.600 $67.000 $63.000 $50.000
162 6002 BLOCK SODDING SY 10,744.000 $8.000 $7.150 $3.570 $9.000 $8.300 $6.000
168 6001 VEGETATIVE WATERING MG 90.500 $25.000 $0.010 $30.450 $120.000 $85.000 $50.000
416 6088 DRILL SHAFT (RDWY ILL POLE) (24 IN) LF 84.000 $230.000 $302.500 $235.120 $299.000 $320.000 $285.000
432 6002 RIPRAP (CONC)(5 IN) CY 19.000 $850.000 $650.000 $898.920 $788.000 $1,070.000 $650.000
450 6052 RAIL (HANDRAIL)(TY F) LF 34.000 $275.000 $270.000 $257.760 $210.000 $602.000 $185.000
500 6001 MOBILIZATION LS 1.000 $350,000.000 $189,500.000 $305,221.050 $250,000.000 $71,000.000 $350,000.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 18.000 $4,000.000 $4,500.000 $1,575.000 $8,000.000 $5,900.000 $12,500.000
506 6038 TEMP SEDMT CONT FENCE (INSTALL) LF 1,200.000 $4.000 $3.500 $0.110 $30.000 $6.400 $4.000
506 6039 TEMP SEDMT CONT FENCE (REMOVE) LF 1,200.000 $1.000 $1.000 $0.110 $2.000 $1.930 $2.000
506 6040 BIODEG EROSN CONT LOGS (INSTL) (8") LF 600.000 $7.000 $0.010 $0.110 $30.000 $8.800 $18.000
506 6043 BIODEG EROSN CONT LOGS (REMOVE) LF 600.000 $2.000 $0.010 $0.110 $2.000 $2.780 $9.000
529 6002 CONC CURB (TY II) LF 4.000 $42.000 $35.000 $69.940 $120.000 $26.500 $55.000
529 6008 CONC CURB & GUTTER (TY II) LF 396.000 $45.000 $42.140 $69.940 $80.000 $55.000 $75.000
529 6015 CONC CURB (TY C1) LF 53.000 $300.000 $122.420 $213.500 $145.000 $111.000 $85.000
530 6004 DRIVEWAYS (CONC) SY 3,930.000 $120.000 $156.000 $120.510 $100.000 $153.000 $85.000
531 6002 CONC SIDEWALKS (5") SY 12,997.000 $100.000 $80.820 $118.830 $85.000 $102.000 $65.000
531 6003 CONC SIDEWALKS (6") SY 33.000 $120.000 $120.570 $128.310 $300.000 $118.000 $85.000
531 6018 CURB RAMPS (TY 1) SY 135.000 $200.000 $296.820 $128.310 $270.000 $190.000 $700.000
531 6020 CURB RAMPS (TY 3) SY 14.000 $200.000 $144.350 $128.310 $370.000 $190.000 $700.000
531 6024 CURB RAMPS (TY 7) SY 667.000 $180.000 $221.710 $128.310 $237.000 $190.000 $700.000
531 6027 CURB RAMPS (TY 10) SY 492.000 $190.000 $184.460 $128.050 $250.000 $190.000 $700.000
531 6032 CONC SIDEWALKS (SPECIAL) (TYPE A) SY 12.000 $550.000 $550.000 $1,348.380 $650.000 $12,500.000 $100.000
560 6025 RELOCATE EXISTING MAILBOX EA 4.000 $250.000 $291.500 $472.500 $520.000 $775.000 $1,500.000
618 6046 CONDT (PVC) (SCH 80) (2") LF 1,145.000 $33.000 $14.850 $15.400 $20.910 $22.500 $20.000
618 6047 CONDT (PVC) (SCH 80) (2") (BORE) LF 903.000 $45.000 $17.600 $24.570 $29.540 $31.700 $50.000
620 6004 ELEC CONDR (NO.12) INSULATED LF 3,516.000 $3.000 $2.200 $1.900 $1.360 $1.460 $3.000
620 6006 ELEC CONDR (NO.10) INSULATED LF 3,438.000 $2.000 $2.200 $1.970 $1.560 $1.670 $3.000
624 6002 GROUND BOX TY A (122311)W/APRON EA 13.000 $1,500.000 $1,540.000 $1,753.470 $1,772.150 $1,900.000 $1,500.000
628 6117 ELC SRV TY D 120/240 060(NS)AL(E)SP(U) EA 2.000 $5,000.000 $8,250.000 $7,218.650 $11,225.970 $12,100.000 $9,500.000
644 6056 IN SM RD SN SUP&AM TYTWT(1)UA(P) EA 2.000 $950.000 $522.500 $157.500 $762.000 $976.000 $1,500.000
644 6068 RELOCATE SM RD SN SUP&AM TY 10BWG EA 36.000 $700.000 $588.500 $157.500 $701.000 $944.000 $1,150.000
644 6070 RELOCATE SM RD SN SUP&AM TY S80 EA 5.000 $800.000 $621.500 $157.500 $735.000 $1,090.000 $1,150.000
644 6071 RELOCATE SM RD SN SUP&AM TY TWT EA 31.000 $450.000 $511.500 $157.500 $609.000 $813.000 $1,150.000
668 6076 PREFAB PAV MRK TY C (W) (24") (SLD) LF 1,307.000 $22.000 $22.000 $17.220 $12.000 $39.200 $20.000
668 6077 PREFAB PAV MRK TY C (W) (ARROW) EA 4.000 $250.000 $385.000 $304.500 $276.000 $389.000 $250.000
677 6005 ELIM EXT PAV MRK & MRKS (12") LF 1,840.000 $2.250 $2.530 $3.150 $2.530 $7.300 $8.000
6185 6002 TMA (STATIONARY) DAY 64.000 $230.000 $250.000 $1.050 $1,560.000 $633.000 $250.000
6208 6001 PEDESTRIAN ILLUMINATION EA 14.000 $4,000.000 $5,500.000 $4,705.280 $6,162.850 $6,620.000 $10,000.000
Totals: $3,046,350.50 $2,778,932.59 $2,994,307.48 $3,041,973.60 $3,229,797.12 $3,414,866.00