Job Info for 6442-18-001

County: COLLIN Highway: US0075 Date: 08/02/2023 (1 year ago) Engineer's Estimate: $339,600 Control Number: 6442-18-001
Project: RMC - 644218001 District: DALLAS Time: 365 CALENDAR DAYS Type: FULL DEPTH CONCRETE REPAIR
HCS
Pay Estimates: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13
Proposal

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $339,600.00
O. TREVINO CONSTRUCTION, LLC   $362,520.00 1
6.75% | $22,920.00
GARRET SHIELDS INFRASTRUCTURE   $377,700.00 2
11.22% | $38,100.00
4.19% | $15,180.00
ROY JORGENSEN ASSOCIATES, INC.   $410,880.00 3
20.99% | $71,280.00
13.34% | $48,360.00
8.78% | $33,180.00

Bid Items

Items: 10, 0 filtered
COLLIN US0075  |  DALLAS  |  6442-18-001  |  08/02/2023  |  $339,600  |  RMC - 644218001  |  FULL DEPTH CONC REPAIR  |  365 CALENDAR DAYS
Item code Description Unit Quantity Engineer's Estimate O. TREVINO CONSTRUCTION, LLC GARRET SHIELDS INFRASTRUCTURE ROY JORGENSEN ASSOCIATES, INC.
361 6065 FULL-DEPTH REPAIR CRCP (8"-10") SY 100.000 $400.000 $345.000 $400.000 $435.000
361 6066 FULL-DEPTH REPAIR CRCP (11"-12") SY 100.000 $450.000 $435.000 $450.000 $485.000
361 6067 FULL-DEPTH REPAIR CRCP (13"-15") SY 100.000 $425.000 $480.000 $500.000 $535.000
361 6069 FULL-DEPTH REPAIR CPCD (11"-13") SY 200.000 $300.000 $450.000 $350.000 $425.000
361 6084 FULL DEPTH REPAIR CPCD (8"-10" SY 100.000 $250.000 $340.000 $250.000 $395.000
429 6006 CONC STR REPR(RAPID DECK REP(FULL DPT)) SF 144.000 $275.000 $217.500 $300.000 $285.000
500 6033 MOBILIZATION (CALLOUT) EA 12.000 $1,500.000 $3,000.000 $3,000.000 $5,750.000
500 6034 MOBILIZATION (EMERGENCY) EA 4.000 $2,000.000 $5,000.000 $3,000.000 $6,250.000
6001 6001 PORTABLE CHANGEABLE MESSAGE SIGN DAY 50.000 $150.000 $180.000 $50.000 $115.000
6185 6002 TMA (STATIONARY) DAY 90.000 $600.000 $180.000 $600.000 $1.000
Totals: $339,600.00 $362,520.00 $377,700.00 $410,880.00