PREPARING ROW
|
STA
|
150.650
|
$600.000
|
$319.130
|
$750.000
|
$2,500.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
8.000
|
$151.000
|
$15.000
|
$75.000
|
$100.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
14,798.000
|
$10.000
|
$10.000
|
$3.750
|
$20.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
17,499.000
|
$10.000
|
$14.460
|
$12.600
|
$30.000
|
|
|
BACKFILL (TY A OR B)
|
STA
|
150.650
|
$215.000
|
$377.000
|
$315.000
|
$450.000
|
|
|
BLADING
|
STA
|
150.650
|
$205.000
|
$350.000
|
$1,500.000
|
$450.000
|
|
|
DRILL SEEDING (PERM) (RURAL) (CLAY)
|
SY
|
119,609.000
|
$0.100
|
$0.150
|
$0.230
|
$0.500
|
|
|
DRILL SEED (TEMP)(WARM OR COOL)
|
SY
|
119,609.000
|
$0.100
|
$0.100
|
$0.150
|
$0.500
|
|
|
VEGETATIVE WATERING
|
MG
|
35,585.000
|
$2.500
|
$0.010
|
$0.100
|
$5.000
|
|
|
FL BS (RDWY DEL) (TY D GR 1-2)
|
TON
|
11,083.000
|
$21.000
|
$39.900
|
$27.500
|
$50.000
|
|
|
FL BS (CMP IN PLACE) (TY D GR 1-2)(10")
|
SY
|
48,679.000
|
$19.000
|
$29.840
|
$27.500
|
$28.000
|
|
|
REWORK BS MTL (TY C)(12"-18")(ORD COMP)
|
SY
|
36,827.000
|
$4.500
|
$3.250
|
$4.000
|
$8.000
|
|
|
CEMENT
|
TON
|
253.000
|
$160.000
|
$235.000
|
$275.000
|
$300.000
|
|
|
CEMENT TREAT (MX EXST MTL & NW BS) (6")
|
SY
|
50,350.000
|
$1.600
|
$3.850
|
$2.500
|
$6.000
|
|
|
EMULS ASPH (PRIME)(MS-2 OR SS-1)
|
GAL
|
9,711.000
|
$9.500
|
$7.000
|
$4.500
|
$10.000
|
|
|
ASPH (CRS-2P)
|
GAL
|
8,114.000
|
$9.500
|
$4.570
|
$5.100
|
$10.000
|
|
|
ASPH (RC-250)
|
GAL
|
4,545.000
|
$9.500
|
$6.330
|
$7.250
|
$10.000
|
|
|
AGGR (TY-B GR-5 OR TY-L GR-5)
|
CY
|
132.000
|
$150.000
|
$160.000
|
$260.000
|
$350.000
|
|
|
ASPH (AC-15P, AC-20-5TR OR AC-20XP)
|
GAL
|
6,817.000
|
$9.500
|
$6.050
|
$6.250
|
$10.000
|
|
|
AGGR (TY-B GR-4 OR TY-L GR-4 SAC-B)
|
CY
|
415.000
|
$135.000
|
$171.000
|
$195.000
|
$300.000
|
|
|
AGGR (TY-B GR-3 OR TY-L GR-3)(SAC-B)
|
CY
|
314.000
|
$175.000
|
$185.000
|
$250.000
|
$300.000
|
|
|
CEM STABIL BKFL
|
CY
|
461.000
|
$190.000
|
$225.000
|
$250.000
|
$325.000
|
|
|
CUT & RESTORE ASPH PAVING
|
SY
|
235.000
|
$115.000
|
$75.000
|
$200.000
|
$200.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
234.000
|
$145.000
|
$225.000
|
$350.000
|
$350.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
567.000
|
$3.000
|
$15.000
|
$20.000
|
$10.000
|
|
|
RIPRAP (STONE PROTECTION)(12 IN)
|
CY
|
571.000
|
$200.000
|
$194.000
|
$300.000
|
$150.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
260.000
|
$75.000
|
$80.000
|
$110.000
|
$125.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
310.000
|
$120.000
|
$165.000
|
$220.000
|
$175.000
|
|
|
RC PIPE (CL III)(42 IN)
|
LF
|
240.000
|
$150.000
|
$200.000
|
$302.000
|
$250.000
|
|
|
RC PIPE (CL III)(48 IN)
|
LF
|
84.000
|
$280.000
|
$275.000
|
$370.000
|
$300.000
|
|
|
RC PIPE (CL IV)(18 IN)
|
LF
|
1,052.000
|
$100.000
|
$90.000
|
$80.000
|
$85.000
|
|
|
RC PIPE (CL IV)(24 IN)
|
LF
|
206.000
|
$110.000
|
$148.000
|
$132.000
|
$150.000
|
|
|
RC PIPE (CL IV)(36 IN)
|
LF
|
26.000
|
$200.000
|
$300.000
|
$256.000
|
$200.000
|
|
|
INLET(COMPL)(PAZD)(FG)(4FTX4FT-4FTX4FT)
|
EA
|
1.000
|
$6,000.000
|
$10,000.000
|
$7,500.000
|
$12,500.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 24 IN)
|
EA
|
5.000
|
$4,000.000
|
$6,500.000
|
$4,750.000
|
$4,500.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 36 IN)
|
EA
|
6.000
|
$5,000.000
|
$10,000.000
|
$7,000.000
|
$5,500.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 42 IN)
|
EA
|
3.000
|
$9,000.000
|
$12,000.000
|
$10,000.000
|
$12,500.000
|
|
|
HEADWALL (CH - PW - S) (DIA= 36 IN)
|
EA
|
2.000
|
$9,500.000
|
$10,500.000
|
$7,500.000
|
$6,500.000
|
|
|
HEADWALL (CH - PW - S) (DIA= 48 IN)
|
EA
|
2.000
|
$9,700.000
|
$13,000.000
|
$10,500.000
|
$15,000.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
62.000
|
$660.000
|
$800.000
|
$1,260.000
|
$1,850.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
8.000
|
$1,000.000
|
$1,500.000
|
$1,365.000
|
$2,850.000
|
|
|
SET (TY II) (36 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$5,500.000
|
$7,500.000
|
$6,300.000
|
$4,000.000
|
|
|
REMOV STR (INLET)
|
EA
|
5.000
|
$925.000
|
$1,000.000
|
$1,000.000
|
$2,500.000
|
|
|
REMOV STR (SET)
|
EA
|
6.000
|
$1,100.000
|
$300.000
|
$500.000
|
$500.000
|
|
|
REMOV STR (HEADWALL)
|
EA
|
14.000
|
$1,800.000
|
$1,000.000
|
$4,000.000
|
$2,500.000
|
|
|
REMOV STR (PIPE)
|
LF
|
1,556.000
|
$10.000
|
$10.000
|
$30.000
|
$30.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$432,431.000
|
$192,000.000
|
$592,000.000
|
$750,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
11.000
|
$10,000.000
|
$7,066.000
|
$31,500.000
|
$8,500.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
680.000
|
$28.000
|
$32.000
|
$36.750
|
$50.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 3)
|
LF
|
80.000
|
$50.000
|
$54.000
|
$47.250
|
$50.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
760.000
|
$7.000
|
$8.000
|
$26.250
|
$20.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
172.000
|
$23.000
|
$25.000
|
$27.300
|
$40.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
172.000
|
$8.000
|
$10.000
|
$13.650
|
$20.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
22,171.000
|
$2.000
|
$2.750
|
$2.100
|
$4.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
22,171.000
|
$0.500
|
$0.500
|
$0.530
|
$2.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
770.000
|
$4.000
|
$5.000
|
$3.680
|
$18.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
770.000
|
$0.750
|
$0.500
|
$1.580
|
$9.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
3,645.000
|
$45.000
|
$83.800
|
$53.000
|
$45.000
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
28,264.000
|
$0.350
|
$0.750
|
$0.170
|
$0.500
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
15,058.000
|
$0.350
|
$0.750
|
$0.170
|
$0.500
|
|
|
MAILBOX INSTALL-S (TWW-POST) TY 4
|
EA
|
12.000
|
$235.000
|
$250.000
|
$288.750
|
$850.000
|
|
|
MAILBOX INSTALL-D (TWW-POST) TY 4
|
EA
|
2.000
|
$300.000
|
$400.000
|
$299.250
|
$850.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
39.000
|
$1.000
|
$750.000
|
$682.500
|
$1,100.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
|
EA
|
6.000
|
$625.000
|
$850.000
|
$740.250
|
$1,100.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
1.000
|
$533.000
|
$1,000.000
|
$866.250
|
$1,100.000
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND
|
EA
|
40.000
|
$19.000
|
$35.000
|
$183.750
|
$100.000
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
30,130.000
|
$0.400
|
$0.410
|
$0.370
|
$1.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
1,507.000
|
$1.000
|
$2.000
|
$4.640
|
$6.000
|
|
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
|
LF
|
60.000
|
$2.000
|
$3.000
|
$2.100
|
$6.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
263.000
|
$6.500
|
$7.300
|
$7.090
|
$20.000
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
29,155.000
|
$0.400
|
$0.460
|
$0.580
|
$1.000
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
30,130.000
|
$0.400
|
$0.460
|
$0.580
|
$1.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
427.000
|
$4.000
|
$5.130
|
$4.070
|
$6.000
|
|
|
SP MIXES SP-C SAC-B PG64-22
|
TON
|
5,691.000
|
$120.000
|
$155.350
|
$136.000
|
$110.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$10,000.000
|
$16,500.000
|
$8,000.000
|
$16,500.000
|
|
|
TMA (STATIONARY)
|
DAY
|
430.000
|
$130.000
|
$1.000
|
$50.000
|
$250.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
400.000
|
$125.000
|
$50.000
|
$80.000
|
$55.000
|
|
Totals: |
$4,862,741.500
|
$5,796,924.024
|
$6,349,573.730
|
$8,044,888.000
|