COLLIN FM 1461 (1392-03-017)

Items: 99

County: COLLIN
Length: 0.0000 MILES (1.8603 MILES)
Highway: FM 1461
District: DALLAS
Control Number: 1392-03-017
DBE Goal: 0.0%
Project: SSW 1392-3-17
Guaranty: $94,000.00
Time: 163 WORKING DAYS
Engineer's Estimate: $4,456,443.01
Date: 07/01/2026 1:00 PM CDT (17 days ago)
Contract Number: 7263016
Type: REHABILITATE EXISTING ROADWAY
Project ID: A00212454
Project Description: ADD SHOULDERS, MILL AND INLAY
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
JENNIFER VORSTER
DEREJE TESEMMA
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (9)
E
Engineer's Estimate
$4,456,443.01
$4,381,938.02
Over/Under Est: -1.67% -$74,504.99
Over/Under Est: 2.88% $128,461.99
Amt Left: 4.63% $202,966.98
$4,764,088.74
Over/Under Est: 6.9% $307,645.73
Amt Left: 8.72% $382,150.72
Delta: -3.91% -$179,183.74
Over/Under Est: 8.52% $379,668.77
Amt Left: 10.36% $454,173.76
Delta: -1.51% -$72,023.04
$5,035,333.13
Over/Under Est: 12.99% $578,890.12
Amt Left: 14.91% $653,395.11
Delta: -4.12% -$199,221.35
Over/Under Est: 13.83% $616,381.04
Amt Left: 15.77% $690,886.03
Delta: -0.74% -$37,490.92
$5,573,028.47
Over/Under Est: 25.06% $1,116,585.46
Amt Left: 27.18% $1,191,090.45
Delta: -9.86% -$500,204.42
Over/Under Est: 26.93% $1,200,130.53
Amt Left: 29.09% $1,274,635.52
Delta: -1.50% -$83,545.07
Over/Under Est: 27.65% $1,232,166.99
Amt Left: 29.82% $1,306,671.98
Delta: -0.57% -$32,036.46

Bid Items & Bid Tabulations

99 Total 0 of 99
COLLIN  |  FM 1461  |  DALLAS  |  1392-03-017  |  07/01/2026 1:00 PM CDT  |  $4,456,443.01  |  SSW 1392-3-17  |  REHAB EXIST ROADWAY  |  163 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
JAGOE-PUBLIC COMPANY
QUALITY EXCAVATION, LLC
STX CIVIL
FOUTSCO PAVING COMPANY, LLC
OVERLAND CORPORATION
AUSTIN BRIDGE & ROAD SERVICES, LP
ALTUS CONSTRUCTION LLC
TEXAS MATERIALS GROUP, INC.
ED BELL CONSTRUCTION COMPANY
PREPARING ROW
STA 102.430 $700.000 $80.000 $950.000 $216.000 $100.000 $1,968.000 $990.490 $5,386.600 $100.000 $1,500.000
REMOV CONC (RIPRAP)
SY 161.000 $26.000 $27.000 $19.000 $23.000 $17.600 $50.000 $65.000 $14.365 $19.000 $39.000
REMOV CONC (DRIVEWAYS)
SY 253.000 $18.000 $38.000 $12.750 $43.000 $10.900 $50.000 $63.000 $18.583 $25.000 $39.000
RMV (8"-14") TRT/UNTRT BASE & ASPH PAV
SY 2,848.000 $15.000 $8.000 $21.250 $9.000 $12.490 $30.000 $29.050 $5.104 $11.240 $21.000
EXCAV (ROADWAY)
CY 2,841.000 $18.000 $15.000 $12.500 $14.000 $50.000 $16.120 $8.490 $11.623 $46.750 $50.000
EMBANK (FNL)(DC)(TY C)
CY 3,639.000 $23.000 $26.000 $16.750 $16.000 $75.000 $12.660 $16.830 $11.495 $46.750 $50.000
BACKFILL (TY A OR B)
STA 102.430 $185.000 $260.000 $155.000 $310.000 $100.000 $220.350 $336.230 $163.087 $450.000 $600.000
BLADING
STA 102.430 $185.000 $110.000 $200.000 $125.000 $1.000 $203.090 $59.560 $157.555 $100.000 $165.000
DRILL SEED (PERM_RURAL_CLAY)
SY 71,422.000 $0.200 $0.170 $0.170 $0.500 $0.100 $0.820 $0.300 $0.141 $0.190 $0.200
DRILL SEED (TEMP_WARM_COOL)
SY 71,422.000 $0.200 $0.160 $0.160 $0.500 $0.010 $0.810 $0.230 $0.149 $0.110 $0.200
VEGETATIVE WATERING
TGL 21,250.000 $2.500 $0.010 $6.250 $16.000 $0.010 $0.010 $0.010 $16.704 $1.000 $1.000
SP MIXES SP-B PG64-22
TON 7,250.000 $115.000 $100.000 $127.270 $142.000 $160.000 $120.000 $162.200 $140.703 $154.000 $110.000
SP MIXES SP-C SAC-B PG64-22
TON 3,642.000 $132.000 $110.000 $137.870 $154.000 $151.000 $130.000 $173.750 $133.825 $154.000 $125.000
TACK COAT
GAL 4,652.000 $2.500 $2.750 $3.180 $5.000 $0.100 $3.000 $4.200 $1.011 $4.000 $4.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(12")
SY 2,102.000 $120.000 $90.000 $136.790 $55.000 $135.000 $150.000 $125.000 $145.559 $130.000 $140.000
PLANE & TEXT ASPH CONC PAV(2")
SY 21,431.000 $2.750 $2.750 $2.430 $5.500 $1.000 $2.290 $3.000 $2.574 $5.000 $2.650
CUT & RESTORE ASPH PAVING
SY 481.000 $100.000 $170.000 $140.000 $210.000 $200.000 $203.740 $121.000 $119.595 $215.000 $250.000
CEM STABIL BKFL
CY 466.000 $220.000 $240.000 $190.000 $190.000 $180.000 $157.280 $180.000 $118.463 $215.000 $350.000
FLOWABLE BACKFILL
CY 35.000 $300.000 $280.000 $235.000 $215.000 $223.800 $145.860 $300.000 $201.949 $290.000 $350.000
TRENCH EXCAVATION PROTECTION
LF 82.000 $10.000 $11.000 $2.250 $10.000 $1.500 $15.000 $10.000 $72.611 $20.000 $300.000
TEMPORARY SPL SHORING
SF 1,924.500 $70.000 $32.000 $60.000 $47.000 $45.000 $10.000 $45.000 $64.479 $20.000 $110.000
RIPRAP (CONC)(4 IN)
CY 20.000 $625.000 $800.000 $510.000 $800.000 $495.500 $693.390 $583.000 $515.146 $700.000 $1,500.000
RIPRAP (MOW STRIP)(4 IN)
CY 46.000 $750.000 $1,200.000 $520.000 $860.000 $577.930 $676.990 $605.000 $524.125 $650.000 $1,500.000
RIPRAP (STONE COMMON)(DRY)(12 IN)
CY 97.000 $220.000 $310.000 $220.000 $155.000 $129.100 $270.760 $150.000 $236.771 $235.000 $285.000
RIPRAP (STONE COMMON)(GROUT)(12 IN)
CY 40.000 $280.000 $380.000 $295.000 $202.000 $200.000 $317.590 $200.000 $201.226 $285.000 $412.000
RIPRAP (STONE PROTECTION)(12 IN)
CY 333.000 $230.000 $350.000 $175.000 $166.000 $139.500 $172.520 $160.000 $167.383 $235.000 $261.000
CONC BOX CULV (10 FT X 6 FT)
LF 213.000 $1,500.000 $1,400.000 $980.000 $1,600.000 $1,500.000 $1,165.450 $1,500.000 $1,251.445 $1,825.000 $1,600.000
CONC BOX CULV (6 FT X 5 FT)(EXTEND)
LF 36.000 $950.000 $1,100.000 $770.000 $875.000 $595.500 $1,180.610 $850.000 $720.855 $1,261.000 $1,400.000
RC PIPE (CL III)(18 IN)
LF 902.000 $55.000 $49.000 $95.000 $62.000 $60.000 $107.480 $60.000 $89.533 $60.000 $150.000
RC PIPE (CL III)(24 IN)
LF 174.000 $85.000 $120.000 $134.000 $88.000 $127.200 $152.360 $145.000 $128.053 $86.000 $178.000
RC PIPE (CL III)(36 IN)
LF 13.000 $180.000 $260.000 $240.000 $185.000 $252.200 $547.790 $285.000 $176.429 $210.000 $750.000
RC PIPE (CL III)(48 IN)
LF 131.000 $260.000 $270.000 $285.000 $302.000 $350.000 $248.300 $350.000 $230.220 $256.000 $800.000
HEADWALL (CH - PW - 0) (DIA= 36 IN)
EA 2.000 $10,000.000 $13,000.000 $6,100.000 $7,380.000 $3,996.200 $10,754.300 $7,500.000 $9,157.136 $10,000.000 $10,500.000
HEADWALL (CH - PW - 0) (DIA= 48 IN)
EA 4.000 $12,000.000 $17,000.000 $8,584.000 $12,500.000 $7,042.400 $10,790.080 $13,000.000 $14,330.942 $16,000.000 $12,000.000
WINGWALL (PW - 1) (HW=6 FT)
EA 1.000 $25,000.000 $26,000.000 $18,840.000 $12,500.000 $10,810.700 $23,473.340 $12,500.000 $23,753.214 $18,000.000 $27,500.000
WINGWALL (PW - 1) (HW=7 FT)
EA 1.000 $35,000.000 $27,000.000 $22,500.000 $14,800.000 $12,355.600 $24,698.340 $15,000.000 $27,878.784 $20,800.000 $33,000.000
WINGWALL (PW - 1) (HW=12 FT)
EA 2.000 $50,000.000 $97,000.000 $91,000.000 $80,000.000 $80,000.000 $88,016.340 $80,000.000 $62,615.037 $92,000.000 $95,000.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 54.000 $820.000 $1,500.000 $1,100.000 $1,100.000 $950.000 $1,223.410 $950.000 $1,872.709 $1,100.000 $1,100.000
SET (TY II) (24 IN) (RCP) (3: 1) (C)
EA 2.000 $1,200.000 $1,400.000 $1,200.000 $1,050.000 $1,207.300 $1,131.630 $2,000.000 $1,732.231 $1,000.000 $1,575.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 8.000 $1,400.000 $1,800.000 $1,300.000 $1,550.000 $1,597.700 $1,651.560 $2,500.000 $1,646.839 $1,450.000 $1,825.000
REMOV STR (SET)
EA 1.000 $125.000 $470.000 $221.000 $620.000 $347.400 $844.320 $600.000 $396.272 $500.000 $700.000
REMOV STR (WINGWALL)
EA 4.000 $2,000.000 $3,200.000 $1,126.000 $1,480.000 $1,500.000 $1,037.790 $1,500.000 $1,028.169 $800.000 $6,500.000
REMOV STR (HEADWALL)
EA 1.000 $930.000 $6,000.000 $1,627.000 $1,480.000 $1,087.900 $1,037.790 $1,500.000 $1,052.476 $1,000.000 $5,851.460
REMOV STR (PIPE)
LF 145.000 $20.000 $37.000 $26.000 $40.000 $24.900 $63.480 $40.000 $19.028 $20.000 $29.000
REMOV STR (BOX CULVERT)
LF 66.000 $85.000 $230.000 $145.000 $300.000 $122.300 $214.580 $300.000 $56.231 $70.000 $500.000
REMOVE STR (DRIVEWAY CULVERT)
EA 27.000 $450.000 $1,250.000 $710.000 $1,200.000 $198.400 $5,000.000 $1,200.000 $432.346 $200.000 $1,100.000
MOBILIZATION
LS 1.000 $421,040.360 $485,000.000 $458,000.000 $381,302.380 $350,000.000 $503,533.310 $558,010.710 $554,536.113 $575,000.000 $500,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 10.000 $15,000.000 $35,000.000 $8,565.000 $2,100.000 $39,000.000 $15,094.000 $26,713.810 $27,866.136 $30,000.000 $25,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 3.000 $18,000.000 $11,250.000 $18,000.000 $6,200.000 $10,000.000 $20,567.500 $6,514.560 $7,586.472 $15,000.000 $22,000.000
TMA (STATIONARY)
DAY 316.000 $180.000 $50.000 $196.000 $230.000 $1.000 $591.050 $1.040 $176.305 $300.000 $150.000
TMA (MOBILE OPERATION)
HR 80.000 $90.000 $35.000 $119.000 $200.000 $1.000 $0.010 $108.410 $51.352 $100.000 $75.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 260.000 $50.000 $40.000 $42.420 $25.000 $41.000 $40.000 $39.100 $34.113 $50.000 $43.000
ROCK FILTER DAMS (INSTALL) (TY 3)
LF 120.000 $70.000 $60.000 $58.330 $35.000 $88.000 $55.000 $91.000 $65.274 $122.000 $100.000
ROCK FILTER DAMS (REMOVE)
LF 380.000 $12.000 $11.000 $11.670 $7.000 $12.000 $11.000 $12.000 $7.227 $43.000 $14.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 172.000 $40.000 $39.000 $41.360 $31.000 $15.000 $39.000 $35.700 $21.767 $50.000 $40.000
CONSTRUCTION EXITS (REMOVE)
SY 172.000 $12.000 $10.000 $10.610 $8.000 $5.000 $10.000 $12.000 $6.915 $25.000 $15.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,316.000 $4.500 $5.000 $5.300 $5.000 $4.000 $5.000 $3.500 $3.414 $2.500 $5.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,316.000 $1.000 $1.000 $1.060 $1.000 $1.000 $1.000 $0.750 $0.823 $1.000 $1.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 1,727.000 $5.500 $6.000 $6.360 $5.000 $1.000 $6.000 $4.500 $4.052 $3.500 $6.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 1,727.000 $1.500 $1.000 $1.060 $1.000 $0.500 $1.000 $1.000 $0.568 $1.150 $1.500
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
LF 743.000 $40.000 $17.000 $46.240 $105.000 $40.000 $70.810 $36.840 $56.389 $40.000 $31.000
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
LF 743.000 $14.000 $19.000 $27.150 $10.000 $22.000 $11.250 $17.410 $38.541 $22.000 $27.000
DRIVEWAYS (CONC) (HES)
SY 273.000 $140.000 $110.000 $125.000 $247.000 $94.200 $142.500 $125.000 $235.787 $200.000 $270.000
DRIVEWAYS (ACP)
SY 2,477.000 $80.000 $60.000 $80.600 $50.000 $65.000 $93.200 $80.000 $91.825 $150.000 $90.000
MILL RUMBLE STRIPS (ASPHALT) (SHLDR)
LF 19,425.000 $0.500 $0.300 $0.320 $0.300 $0.300 $0.300 $0.230 $0.232 $0.250 $0.250
MILL RUMBLE STRIPS (ASPH) (CENTERLINE)
LF 8,325.000 $0.500 $0.300 $0.320 $0.300 $0.300 $0.300 $0.230 $0.232 $0.250 $0.250
MTL W-BEAM GD FEN (TIM POST)
LF 650.000 $25.000 $22.000 $23.860 $32.000 $23.150 $24.500 $23.150 $19.362 $22.500 $25.000
SHORT RADIUS (28")
LF 23.000 $35.000 $32.000 $26.510 $95.000 $39.000 $39.000 $39.000 $31.533 $25.000 $27.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 1.000 $2,250.000 $1,200.000 $1,272.660 $2,100.000 $1,540.000 $1,540.000 $1,540.000 $945.134 $1,200.000 $1.000
REMOVE METAL BEAM GUARD FENCE
LF 125.000 $4.000 $4.000 $3.180 $14.000 $2.000 $2.000 $2.000 $4.842 $3.000 $5.000
GUARDRAIL END TREATMENT (INSTALL)
EA 3.000 $3,200.000 $3,100.000 $3,128.620 $3,900.000 $3,196.000 $3,196.000 $3,196.000 $2,400.228 $2,950.000 $3,100.000
GUARDRAIL END TREATMENT (REMOVE)
EA 4.000 $275.000 $400.000 $265.140 $370.000 $200.000 $200.000 $200.000 $230.714 $250.000 $275.000
CRASH CUSH ATTEN (REMOVE)
EA 4.000 $950.000 $1,200.000 $2,121.100 $615.000 $585.000 $585.000 $230.860 $533.662 $2,000.000 $1,050.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 4.000 $9,000.000 $8,000.000 $9,544.950 $7,800.000 $6,925.000 $6,925.000 $7,500.840 $6,476.794 $25,000.000 $15,000.000
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 10.000 $270.000 $220.000 $233.320 $370.000 $275.000 $275.000 $275.000 $222.536 $275.000 $300.000
MAILBOX INSTALL-D (TWW-POST) TY 4
EA 2.000 $320.000 $240.000 $254.530 $550.000 $315.000 $315.000 $315.000 $242.767 $285.000 $350.000
MAILBOX INSTALL-M (TWW-POST) TY 4
EA 1.000 $950.000 $700.000 $689.360 $800.000 $775.000 $775.000 $775.000 $657.494 $750.000 $900.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 40.000 $750.000 $700.000 $710.570 $550.000 $615.000 $615.000 $615.000 $677.724 $660.000 $650.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 2.000 $920.000 $900.000 $901.470 $615.000 $699.000 $699.000 $699.000 $859.800 $675.000 $750.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 10.000 $39.000 $31.000 $74.240 $55.000 $25.000 $25.000 $25.000 $24.729 $28.000 $27.000
INSTL OM ASSM (OM-2Z)(WFLX)GNDLL
EA 16.000 $30.000 $70.000 $47.730 $185.000 $99.000 $99.000 $99.000 $70.807 $45.000 $80.000
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 20,383.000 $0.500 $0.180 $0.190 $0.360 $0.210 $0.180 $0.210 $0.252 $0.210 $0.260
WK ZN PAV MRK NON-REMOV (W)8"(DOT)
LF 117.000 $2.000 $2.000 $2.070 $1.250 $0.550 $1.950 $0.550 $1.011 $0.570 $1.250
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 775.000 $0.800 $0.400 $0.430 $1.250 $0.500 $0.410 $0.500 $1.011 $0.520 $1.250
WK ZN PAV MRK NON-REMOV (W)(ARROW)
EA 6.000 $125.000 $120.000 $127.270 $80.000 $40.000 $120.000 $40.000 $65.749 $40.000 $100.000
WK ZN PAV MRK NON-REMOV(W)(WORD)
EA 6.000 $150.000 $130.000 $135.750 $80.000 $45.000 $128.000 $45.000 $65.749 $45.000 $100.000
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 22,579.000 $0.500 $0.180 $0.190 $0.310 $0.210 $0.180 $0.210 $0.252 $0.210 $0.260
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 100.000 $1.500 $2.000 $2.980 $6.000 $5.000 $1.000 $0.540 $0.775 $1.000 $7.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 2,276.000 $1.500 $2.000 $2.760 $4.000 $1.000 $1.000 $0.810 $0.509 $1.000 $4.000
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
LF 117.000 $1.500 $1.750 $1.910 $1.250 $1.000 $1.800 $1.000 $1.972 $1.000 $1.050
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 775.000 $1.000 $1.000 $1.030 $1.250 $1.000 $0.970 $1.000 $0.869 $1.000 $0.900
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 93.000 $6.000 $7.000 $7.210 $9.000 $9.000 $6.800 $9.000 $6.827 $9.000 $7.090
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 6.000 $200.000 $130.000 $141.050 $190.000 $160.000 $133.000 $160.000 $156.787 $160.000 $162.750
REFL PAV MRK TY I(W)(DBL ARROW)(100MIL)
EA 2.000 $360.000 $190.000 $200.450 $280.000 $179.000 $189.000 $179.000 $227.594 $179.000 $236.250
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 6.000 $275.000 $160.000 $169.690 $190.000 $169.000 $160.000 $169.000 $156.787 $169.000 $162.750
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
LF 20,383.000 $1.000 $0.600 $0.650 $0.630 $0.530 $0.610 $0.530 $0.515 $0.530 $0.540
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
LF 22,579.000 $1.000 $0.700 $0.680 $0.630 $0.530 $0.640 $0.530 $0.515 $0.530 $0.540
REFL PAV MRKR TY I-C
EA 75.000 $6.000 $4.750 $4.980 $11.500 $4.000 $4.700 $4.000 $9.356 $4.000 $9.710
REFL PAV MRKR TY II-A-A
EA 267.000 $6.000 $4.750 $4.980 $11.500 $3.900 $4.700 $3.900 $9.356 $3.900 $9.710
Totals: $4,456,443.010 $4,381,938.020 $4,584,905.000 $4,764,088.740 $4,836,111.780 $5,035,333.129 $5,072,824.050 $5,573,028.442 $5,656,573.540 $5,688,610.000
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (NON-PART) $75,000.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (NON-PART) $100,000.00
Total: $175,000.00