Job Info for 0047-14-087

County: COLLIN Highway: US 75 Date: 02/01/2023 (1 year ago) Engineer's Estimate: $597,336 Control Number: 0047-14-087
Project: F 2023(485) District: DALLAS Time: 65 WORKING DAYS Type: LANDSCAPE DEVELOPMENT
HCS
Pay Estimates: 1 | 2 | 3 | 4 | 5 | 6 | 7
Plans: Plans | Revision | Proposal

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $597,335.50
3LW CIVIL LLC   $453,568.00 1
-24.07% | -$143,767.50
CENTRAL NORTH CONSTRUCTION, LLC   $625,190.00 2
4.66% | $27,854.50
37.84% | $171,622.00

Bid Items

Items: 22, 0 filtered
COLLIN US 75  |  DALLAS  |  0047-14-087  |  02/01/2023  |  $597,336  |  F 2023(485)  |  LANDSCAPE DEVELOPMENT  |  65 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate 3LW CIVIL LLC CENTRAL NORTH CONSTRUCTION, LLC
100 6001 PREPARING ROW AC 2.000 $15,000.000 $15,000.000 $60,000.000
161 6012 GENERAL USE COMPOST CY 272.000 $60.000 $45.000 $40.000
170 6001 IRRIGATION SYSTEM LS 1.000 $50,000.000 $42,000.000 $127,107.000
192 6003 PLANT MATERIAL (3-GAL) EA 346.000 $35.000 $16.000 $19.000
192 6004 PLANT MATERIAL (5-GAL) EA 358.000 $70.000 $17.000 $30.000
192 6005 PLANT MATERIAL (15-GAL) EA 18.000 $150.000 $1.000 $10.000
192 6016 PLANT BED PREPARATION SY 9,798.000 $2.500 $5.000 $1.500
192 6024 PLANT MATERIAL (30 GAL) (TREE) EA 24.000 $350.000 $185.000 $275.000
500 6001 MOBILIZATION LS 1.000 $60,000.000 $125,000.000 $31,000.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 4.000 $5,000.000 $15,740.000 $4,500.000
506 6038 TEMP SEDMT CONT FENCE (INSTALL) LF 2,678.000 $4.000 $8.000 $1.000
506 6039 TEMP SEDMT CONT FENCE (REMOVE) LF 2,678.000 $2.000 $1.750 $0.500
506 6041 BIODEG EROSN CONT LOGS (INSTL) (12") LF 655.000 $7.000 $11.000 $1.000
506 6043 BIODEG EROSN CONT LOGS (REMOVE) LF 655.000 $2.000 $3.000 $0.500
610 6101 REPLACE LUMINAIRE W/LED (150W EQ) EA 12.000 $775.000 $820.000 $800.000
751 6013 VEGETATIVE WATERING MO 3.000 $1,000.000 $140.000 $800.000
1002 6002 LANDSCAPE AMENITY (TY 1) EA 18.000 $500.000 $175.000 $1,000.000
1002 6003 LANDSCAPE AMENITY (TY 2) EA 30.000 $400.000 $125.000 $800.000
1005 6001 LOOSE AGGR FOR GROUNDCOVER (TYPE I) CY 320.000 $325.000 $85.000 $320.000
1005 6002 LOOSE AGGR FOR GROUNDCOVER (TYPE II) CY 373.000 $325.000 $65.000 $175.000
1005 6003 LOOSE AGGR FOR GROUNDCOVER (TYPE III) CY 144.500 $325.000 $85.000 $275.000
6185 6002 TMA (STATIONARY) DAY 130.000 $160.000 $1.000 $100.000
Totals: $597,335.50 $453,568.00 $625,190.00