PREP ROW (TREE)(LESS THAN 24" DIA)
|
EA
|
2.000
|
$1,000.000
|
$1,500.000
|
$1,500.000
|
|
|
REMOVING CONC (CURB)
|
LF
|
340.000
|
$25.000
|
$22.000
|
$16.000
|
|
|
REMOVING CONCRETE(MOW STRIP)
|
LF
|
900.000
|
$10.000
|
$22.000
|
$14.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
15,069.000
|
$11.000
|
$12.500
|
$20.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
6,209.000
|
$15.000
|
$12.500
|
$20.000
|
|
|
BLADING
|
STA
|
12.000
|
$300.000
|
$750.000
|
$365.000
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
16,956.000
|
$0.400
|
$0.400
|
$0.800
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
16,956.000
|
$0.400
|
$0.400
|
$0.800
|
|
|
VEGETATIVE WATERING
|
MG
|
757.000
|
$20.000
|
$40.000
|
$18.000
|
|
|
PROOF ROLLING
|
HR
|
2.500
|
$140.000
|
$500.000
|
$500.000
|
|
|
FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS)
|
CY
|
8,856.000
|
$55.000
|
$65.500
|
$52.000
|
|
|
REWORK BS MTL (TY C)(10")(DENS CONT)
|
SY
|
18,027.000
|
$6.000
|
$3.500
|
$3.400
|
|
|
PRIME COAT (MC-30)
|
GAL
|
6,304.000
|
$5.000
|
$5.500
|
$6.000
|
|
|
ASPH (CRS-2)
|
GAL
|
31,981.000
|
$5.000
|
$5.000
|
$4.150
|
|
|
AGGR(TY-B GR-4S SAC-B)
|
CY
|
556.000
|
$150.000
|
$150.000
|
$250.000
|
|
|
PLANE ASPH CONC PAV (0" TO 1 1/2")
|
SY
|
33,563.000
|
$2.000
|
$2.500
|
$2.200
|
|
|
DRILL SHAFT (RDWY ILL POLE) (30 IN)
|
LF
|
10.000
|
$300.000
|
$625.000
|
$550.000
|
|
|
CL C CONC (CULV)
|
CY
|
1.500
|
$10,000.000
|
$1,500.000
|
$5,500.000
|
|
|
RIPRAP (CONC)(6 IN)
|
CY
|
86.000
|
$500.000
|
$750.000
|
$660.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
57.000
|
$500.000
|
$725.000
|
$550.000
|
|
|
CMP AR (GAL STL DES 3)
|
LF
|
328.000
|
$80.000
|
$115.000
|
$82.500
|
|
|
SET (TY I)(S=3 FT)(HW= 3 FT)(6:1)(C)
|
EA
|
2.000
|
$10,000.000
|
$5,400.000
|
$11,000.000
|
|
|
SET (TY II) (DES 3) (CMP) (6: 1) (C)
|
EA
|
18.000
|
$1,500.000
|
$2,250.000
|
$3,520.000
|
|
|
REMOV STR (PIPE)
|
LF
|
147.000
|
$15.000
|
$22.000
|
$20.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$220,000.000
|
$145,000.000
|
$300,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
7.000
|
$7,500.000
|
$7,500.000
|
$8,500.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
1,200.000
|
$6.000
|
$6.500
|
$4.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
1,200.000
|
$2.000
|
$1.000
|
$1.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
696.000
|
$6.000
|
$6.500
|
$7.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
696.000
|
$2.000
|
$1.000
|
$1.000
|
|
|
CONC CURB (MOD) (TYPE I)
|
LF
|
323.000
|
$60.000
|
$28.000
|
$20.000
|
|
|
INTERSECTIONS (ACP)
|
SY
|
627.000
|
$45.000
|
$70.000
|
$100.000
|
|
|
DRIVEWAYS (SURF TREAT)
|
SY
|
1,785.000
|
$40.000
|
$30.530
|
$31.000
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
14,653.000
|
$0.750
|
$0.460
|
$0.420
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
14,256.000
|
$0.750
|
$0.460
|
$0.420
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
2,521.000
|
$35.000
|
$38.000
|
$35.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
2.000
|
$3,500.000
|
$3,100.000
|
$2,569.600
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
2,700.000
|
$3.000
|
$3.000
|
$5.500
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
6.000
|
$3,700.000
|
$4,000.000
|
$2,726.900
|
|
|
RELOCATE RD IL ASM (TRANS-BASE)
|
EA
|
1.000
|
$5,000.000
|
$9,000.000
|
$8,250.000
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
31.000
|
$45.000
|
$42.500
|
$50.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
11.000
|
$800.000
|
$841.000
|
$850.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
8.000
|
$800.000
|
$1,020.000
|
$1,000.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
20.000
|
$200.000
|
$100.000
|
$100.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
57.000
|
$50.000
|
$57.000
|
$60.000
|
|
|
INSTL OM ASSM (OM-2Y)(WC)GND(BI)
|
EA
|
2.000
|
$100.000
|
$166.000
|
$100.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
|
LF
|
19,950.000
|
$0.300
|
$0.460
|
$0.510
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
|
LF
|
10,216.000
|
$0.300
|
$0.460
|
$0.510
|
|
|
WK ZN PAV MRK REMOV (REFL) TY I-C
|
EA
|
19.000
|
$5.000
|
$8.450
|
$9.300
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-A-A
|
EA
|
526.000
|
$5.000
|
$4.900
|
$5.390
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
3,000.000
|
$1.000
|
$2.000
|
$1.500
|
|
|
WK ZN PAV MRK SHT TERM RMV (Y)(4")
|
LF
|
7,942.000
|
$0.600
|
$2.500
|
$2.000
|
|
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
|
LF
|
113.000
|
$1.000
|
$1.900
|
$2.090
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
1,310.000
|
$1.000
|
$1.200
|
$1.320
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
65.000
|
$12.000
|
$17.000
|
$18.700
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
|
LF
|
3,684.000
|
$0.600
|
$0.660
|
$0.730
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
14,653.000
|
$0.600
|
$0.640
|
$0.700
|
|
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
|
LF
|
2,445.000
|
$0.600
|
$0.660
|
$0.730
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
18,660.000
|
$0.600
|
$0.640
|
$0.700
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
10.000
|
$220.000
|
$355.000
|
$390.500
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
6.000
|
$280.000
|
$420.000
|
$462.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
283.000
|
$5.000
|
$5.100
|
$5.610
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
491.000
|
$5.000
|
$4.750
|
$5.230
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
1,270.000
|
$0.600
|
$1.230
|
$1.350
|
|
|
SP MIXES SP-D SAC-B PG76-22
|
TON
|
5,614.000
|
$115.000
|
$132.750
|
$140.000
|
|
|
BONDING COURSE
|
GAL
|
4,699.000
|
$5.000
|
$4.000
|
$4.300
|
|
|
TMA (STATIONARY)
|
DAY
|
185.000
|
$200.000
|
$275.000
|
$205.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
176.000
|
$70.000
|
$100.000
|
$22.000
|
|
Totals: |
$2,768,056.750
|
$2,976,495.110
|
$3,210,717.930
|