Show Job Controls
Bid Cobra

COLEMAN US 84 (0054-04-123)

Items: 68

County: COLEMAN
Length: N/A
Highway: US 84
District: BROWNWOOD
Control Number: 0054-04-123
DBE Goal: N/A
Project: STP 2023(639)HES
Guaranty: N/A
Time: 113 WORKING DAYS
Engineer's Estimate: $2,768,056.75
Date: 04/04/2023 (3 years ago)
Contract Number: N/A
Type: HAZARD ELIMINATION & SAFETY
Mail/Deliver Bids To: N/A
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (2)
E
Engineer's Estimate
$2,768,056.75
$2,976,495.11
Over/Under Est: 7.53% $208,438.36
Over/Under Est: 15.99% $442,661.18
Amt Left: 7.87% $234,222.82

Bid Items & Bid Tabulations

68 Total 0 of 68
COLEMAN  |  US 84  |  BROWNWOOD  |  0054-04-123  |  04/04/2023  |  $2,768,056.75  |  STP 2023(639)HES  |  HAZARD ELIM & SAFETY  |  113 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
J. H. STRAIN & SONS, INC.
JAY MILLS CONTRACTING, INCORPORATED
PREP ROW (TREE)(LESS THAN 24" DIA)
EA 2.000 $1,000.000 $1,500.000 $1,500.000
REMOVING CONC (CURB)
LF 340.000 $25.000 $22.000 $16.000
REMOVING CONCRETE(MOW STRIP)
LF 900.000 $10.000 $22.000 $14.000
EXCAVATION (ROADWAY)
CY 15,069.000 $11.000 $12.500 $20.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 6,209.000 $15.000 $12.500 $20.000
BLADING
STA 12.000 $300.000 $750.000 $365.000
BROADCAST SEED (TEMP) (WARM)
SY 16,956.000 $0.400 $0.400 $0.800
BROADCAST SEED (TEMP) (COOL)
SY 16,956.000 $0.400 $0.400 $0.800
VEGETATIVE WATERING
MG 757.000 $20.000 $40.000 $18.000
PROOF ROLLING
HR 2.500 $140.000 $500.000 $500.000
FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS)
CY 8,856.000 $55.000 $65.500 $52.000
REWORK BS MTL (TY C)(10")(DENS CONT)
SY 18,027.000 $6.000 $3.500 $3.400
PRIME COAT (MC-30)
GAL 6,304.000 $5.000 $5.500 $6.000
ASPH (CRS-2)
GAL 31,981.000 $5.000 $5.000 $4.150
AGGR(TY-B GR-4S SAC-B)
CY 556.000 $150.000 $150.000 $250.000
PLANE ASPH CONC PAV (0" TO 1 1/2")
SY 33,563.000 $2.000 $2.500 $2.200
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 10.000 $300.000 $625.000 $550.000
CL C CONC (CULV)
CY 1.500 $10,000.000 $1,500.000 $5,500.000
RIPRAP (CONC)(6 IN)
CY 86.000 $500.000 $750.000 $660.000
RIPRAP (MOW STRIP)(4 IN)
CY 57.000 $500.000 $725.000 $550.000
CMP AR (GAL STL DES 3)
LF 328.000 $80.000 $115.000 $82.500
SET (TY I)(S=3 FT)(HW= 3 FT)(6:1)(C)
EA 2.000 $10,000.000 $5,400.000 $11,000.000
SET (TY II) (DES 3) (CMP) (6: 1) (C)
EA 18.000 $1,500.000 $2,250.000 $3,520.000
REMOV STR (PIPE)
LF 147.000 $15.000 $22.000 $20.000
MOBILIZATION
LS 1.000 $220,000.000 $145,000.000 $300,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 7.000 $7,500.000 $7,500.000 $8,500.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,200.000 $6.000 $6.500 $4.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,200.000 $2.000 $1.000 $1.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 696.000 $6.000 $6.500 $7.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 696.000 $2.000 $1.000 $1.000
CONC CURB (MOD) (TYPE I)
LF 323.000 $60.000 $28.000 $20.000
INTERSECTIONS (ACP)
SY 627.000 $45.000 $70.000 $100.000
DRIVEWAYS (SURF TREAT)
SY 1,785.000 $40.000 $30.530 $31.000
RUMBLE STRIPS (SHOULDER)
LF 14,653.000 $0.750 $0.460 $0.420
RUMBLE STRIPS (CENTERLINE)
LF 14,256.000 $0.750 $0.460 $0.420
MTL W-BEAM GD FEN (STEEL POST)
LF 2,521.000 $35.000 $38.000 $35.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 2.000 $3,500.000 $3,100.000 $2,569.600
REMOVE METAL BEAM GUARD FENCE
LF 2,700.000 $3.000 $3.000 $5.500
GUARDRAIL END TREATMENT (INSTALL)
EA 6.000 $3,700.000 $4,000.000 $2,726.900
RELOCATE RD IL ASM (TRANS-BASE)
EA 1.000 $5,000.000 $9,000.000 $8,250.000
ALUMINUM SIGNS (TY A)
SF 31.000 $45.000 $42.500 $50.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 11.000 $800.000 $841.000 $850.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 8.000 $800.000 $1,020.000 $1,000.000
REMOVE SM RD SN SUP&AM
EA 20.000 $200.000 $100.000 $100.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 57.000 $50.000 $57.000 $60.000
INSTL OM ASSM (OM-2Y)(WC)GND(BI)
EA 2.000 $100.000 $166.000 $100.000
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 19,950.000 $0.300 $0.460 $0.510
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 10,216.000 $0.300 $0.460 $0.510
WK ZN PAV MRK REMOV (REFL) TY I-C
EA 19.000 $5.000 $8.450 $9.300
WK ZN PAV MRK REMOV (REFL) TY II-A-A
EA 526.000 $5.000 $4.900 $5.390
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 3,000.000 $1.000 $2.000 $1.500
WK ZN PAV MRK SHT TERM RMV (Y)(4")
LF 7,942.000 $0.600 $2.500 $2.000
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
LF 113.000 $1.000 $1.900 $2.090
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 1,310.000 $1.000 $1.200 $1.320
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 65.000 $12.000 $17.000 $18.700
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 3,684.000 $0.600 $0.660 $0.730
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 14,653.000 $0.600 $0.640 $0.700
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
LF 2,445.000 $0.600 $0.660 $0.730
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 18,660.000 $0.600 $0.640 $0.700
PREFAB PAV MRK TY C (W) (ARROW)
EA 10.000 $220.000 $355.000 $390.500
PREFAB PAV MRK TY C (W) (WORD)
EA 6.000 $280.000 $420.000 $462.000
REFL PAV MRKR TY I-C
EA 283.000 $5.000 $5.100 $5.610
REFL PAV MRKR TY II-A-A
EA 491.000 $5.000 $4.750 $5.230
ELIM EXT PAV MRK & MRKS (4")
LF 1,270.000 $0.600 $1.230 $1.350
SP MIXES SP-D SAC-B PG76-22
TON 5,614.000 $115.000 $132.750 $140.000
BONDING COURSE
GAL 4,699.000 $5.000 $4.000 $4.300
TMA (STATIONARY)
DAY 185.000 $200.000 $275.000 $205.000
TMA (MOBILE OPERATION)
HR 176.000 $70.000 $100.000 $22.000
Totals: $2,768,056.750 $2,976,495.110 $3,210,717.930