County: COLEMAN Highway: US 84 Date: 04/04/2023 (1 year ago) Engineer's Estimate: $2,768,057 Control Number: 0054-04-123
Project: STP 2023(639)HES District: BROWNWOOD Time: 113 WORKING DAYS Type: HAZARD ELIMINATION & SAFETY
HCS
Pay Estimates: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12
Plans: Plans | Proposal

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $2,768,056.75
J. H. STRAIN & SONS, INC.   $2,976,495.11 1
7.53% | $208,438.36
JAY MILLS CONTRACTING, INCORPORATED   $3,210,717.93 2
15.99% | $442,661.18
7.87% | $234,222.82

Bid Items

Items: 68, 0 filtered
COLEMAN US 84  |  BROWNWOOD  |  0054-04-123  |  04/04/2023  |  $2,768,057  |  STP 2023(639)HES  |  HAZARD ELIM & SAFETY  |  113 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate J. H. STRAIN & SONS, INC. JAY MILLS CONTRACTING, INCORPORATED
100 6006 PREP ROW (TREE)(LESS THAN 24" DIA) EA 2.000 $1,000.000 $1,500.000 $1,500.000
104 6021 REMOVING CONC (CURB) LF 340.000 $25.000 $22.000 $16.000
104 6054 REMOVING CONCRETE(MOW STRIP) LF 900.000 $10.000 $22.000 $14.000
110 6001 EXCAVATION (ROADWAY) CY 15,069.000 $11.000 $12.500 $20.000
132 6006 EMBANKMENT (FINAL)(DENS CONT)(TY C) CY 6,209.000 $15.000 $12.500 $20.000
150 6001 BLADING STA 12.000 $300.000 $750.000 $365.000
164 6009 BROADCAST SEED (TEMP) (WARM) SY 16,956.000 $0.400 $0.400 $0.800
164 6011 BROADCAST SEED (TEMP) (COOL) SY 16,956.000 $0.400 $0.400 $0.800
168 6001 VEGETATIVE WATERING MG 757.000 $20.000 $40.000 $18.000
216 6001 PROOF ROLLING HR 2.500 $140.000 $500.000 $500.000
247 6053 FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS) CY 8,856.000 $55.000 $65.500 $52.000
251 6086 REWORK BS MTL (TY C)(10")(DENS CONT) SY 18,027.000 $6.000 $3.500 $3.400
310 6009 PRIME COAT (MC-30) GAL 6,304.000 $5.000 $5.500 $6.000
316 6022 ASPH (CRS-2) GAL 31,981.000 $5.000 $5.000 $4.150
316 6174 AGGR(TY-B GR-4S SAC-B) CY 556.000 $150.000 $150.000 $250.000
354 6051 PLANE ASPH CONC PAV (0" TO 1 1/2") SY 33,563.000 $2.000 $2.500 $2.200
416 6029 DRILL SHAFT (RDWY ILL POLE) (30 IN) LF 10.000 $300.000 $625.000 $550.000
420 6051 CL C CONC (CULV) CY 1.500 $10,000.000 $1,500.000 $5,500.000
432 6003 RIPRAP (CONC)(6 IN) CY 86.000 $500.000 $750.000 $660.000
432 6045 RIPRAP (MOW STRIP)(4 IN) CY 57.000 $500.000 $725.000 $550.000
460 6010 CMP AR (GAL STL DES 3) LF 328.000 $80.000 $115.000 $82.500
467 6109 SET (TY I)(S=3 FT)(HW= 3 FT)(6:1)(C) EA 2.000 $10,000.000 $5,400.000 $11,000.000
467 6536 SET (TY II) (DES 3) (CMP) (6: 1) (C) EA 18.000 $1,500.000 $2,250.000 $3,520.000
496 6007 REMOV STR (PIPE) LF 147.000 $15.000 $22.000 $20.000
500 6001 MOBILIZATION LS 1.000 $220,000.000 $145,000.000 $300,000.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 7.000 $7,500.000 $7,500.000 $8,500.000
506 6038 TEMP SEDMT CONT FENCE (INSTALL) LF 1,200.000 $6.000 $6.500 $4.000
506 6039 TEMP SEDMT CONT FENCE (REMOVE) LF 1,200.000 $2.000 $1.000 $1.000
506 6041 BIODEG EROSN CONT LOGS (INSTL) (12") LF 696.000 $6.000 $6.500 $7.000
506 6043 BIODEG EROSN CONT LOGS (REMOVE) LF 696.000 $2.000 $1.000 $1.000
529 6014 CONC CURB (MOD) (TYPE I) LF 323.000 $60.000 $28.000 $20.000
530 6002 INTERSECTIONS (ACP) SY 627.000 $45.000 $70.000 $100.000
530 6006 DRIVEWAYS (SURF TREAT) SY 1,785.000 $40.000 $30.530 $31.000
533 6001 RUMBLE STRIPS (SHOULDER) LF 14,653.000 $0.750 $0.460 $0.420
533 6002 RUMBLE STRIPS (CENTERLINE) LF 14,256.000 $0.750 $0.460 $0.420
540 6002 MTL W-BEAM GD FEN (STEEL POST) LF 2,521.000 $35.000 $38.000 $35.000
540 6006 MTL BEAM GD FEN TRANS (THRIE-BEAM) EA 2.000 $3,500.000 $3,100.000 $2,569.600
542 6001 REMOVE METAL BEAM GUARD FENCE LF 2,700.000 $3.000 $3.000 $5.500
544 6001 GUARDRAIL END TREATMENT (INSTALL) EA 6.000 $3,700.000 $4,000.000 $2,726.900
610 6004 RELOCATE RD IL ASM (TRANS-BASE) EA 1.000 $5,000.000 $9,000.000 $8,250.000
636 6001 ALUMINUM SIGNS (TY A) SF 31.000 $45.000 $42.500 $50.000
644 6001 IN SM RD SN SUP&AM TY10BWG(1)SA(P) EA 11.000 $800.000 $841.000 $850.000
644 6004 IN SM RD SN SUP&AM TY10BWG(1)SA(T) EA 8.000 $800.000 $1,020.000 $1,000.000
644 6076 REMOVE SM RD SN SUP&AM EA 20.000 $200.000 $100.000 $100.000
658 6062 INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI) EA 57.000 $50.000 $57.000 $60.000
658 6073 INSTL OM ASSM (OM-2Y)(WC)GND(BI) EA 2.000 $100.000 $166.000 $100.000
662 6008 WK ZN PAV MRK NON-REMOV (W)6"(SLD) LF 19,950.000 $0.300 $0.460 $0.510
662 6037 WK ZN PAV MRK NON-REMOV (Y)6"(SLD) LF 10,216.000 $0.300 $0.460 $0.510
662 6048 WK ZN PAV MRK REMOV (REFL) TY I-C EA 19.000 $5.000 $8.450 $9.300
662 6050 WK ZN PAV MRK REMOV (REFL) TY II-A-A EA 526.000 $5.000 $4.900 $5.390
662 6111 WK ZN PAV MRK SHT TERM (TAB)TY Y-2 EA 3,000.000 $1.000 $2.000 $1.500
662 6113 WK ZN PAV MRK SHT TERM RMV (Y)(4") LF 7,942.000 $0.600 $2.500 $2.000
666 6030 REFL PAV MRK TY I (W)8"(DOT)(100MIL) LF 113.000 $1.000 $1.900 $2.090
666 6036 REFL PAV MRK TY I (W)8"(SLD)(100MIL) LF 1,310.000 $1.000 $1.200 $1.320
666 6048 REFL PAV MRK TY I (W)24"(SLD)(100MIL) LF 65.000 $12.000 $17.000 $18.700
666 6306 RE PM W/RET REQ TY I (W)6"(BRK)(100MIL) LF 3,684.000 $0.600 $0.660 $0.730
666 6309 RE PM W/RET REQ TY I (W)6"(SLD)(100MIL) LF 14,653.000 $0.600 $0.640 $0.700
666 6318 RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL) LF 2,445.000 $0.600 $0.660 $0.730
666 6321 RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL) LF 18,660.000 $0.600 $0.640 $0.700
668 6077 PREFAB PAV MRK TY C (W) (ARROW) EA 10.000 $220.000 $355.000 $390.500
668 6085 PREFAB PAV MRK TY C (W) (WORD) EA 6.000 $280.000 $420.000 $462.000
672 6007 REFL PAV MRKR TY I-C EA 283.000 $5.000 $5.100 $5.610
672 6009 REFL PAV MRKR TY II-A-A EA 491.000 $5.000 $4.750 $5.230
677 6001 ELIM EXT PAV MRK & MRKS (4") LF 1,270.000 $0.600 $1.230 $1.350
3077 6066 SP MIXES SP-D SAC-B PG76-22 TON 5,614.000 $115.000 $132.750 $140.000
3084 6001 BONDING COURSE GAL 4,699.000 $5.000 $4.000 $4.300
6185 6002 TMA (STATIONARY) DAY 185.000 $200.000 $275.000 $205.000
6185 6003 TMA (MOBILE OPERATION) HR 176.000 $70.000 $100.000 $22.000
Totals: $2,768,056.75 $2,976,495.11 $3,210,717.93