Job Info for 0907-14-010

County: COKE Highway: CR Date: 10/07/2022 (2 years ago) Engineer's Estimate: $554,581 Control Number: 0907-14-010
Project: BR 2022(184) District: SAN ANGELO Time: 84 WORKING DAYS Type: BRIDGE REPLACEMENT
HCS
Pay Estimate
Plans: Plans | Proposal

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $554,581.28
DELGADO'S CONTRACTORS, LLC   $659,587.00 1
18.93% | $105,005.72
HODGES AND SON CONSTRUCTION COMPANY, INC.   $758,160.00 2
36.71% | $203,578.72
14.94% | $98,573.00
BLACKSTONE CONCRETE VENTURES, LLC   $777,490.00 3
40.19% | $222,908.72
17.88% | $117,903.00
2.55% | $19,330.00

Bid Items

Items: 40, 0 filtered
COKE CR  |  SAN ANGELO  |  0907-14-010  |  10/07/2022  |  $554,581  |  BR 2022(184)  |  BRIDGE REPL  |  84 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate DELGADO'S CONTRACTORS, LLC HODGES AND SON CONSTRUCTION COMPANY, INC. BLACKSTONE CONCRETE VENTURES, LLC
100 6002 PREPARING ROW STA 5.900 $2,500.000 $2,000.000 $4,200.000 $625.000
105 6069 REMOVING STAB BASE & ASPH PAV (4" - 6") SY 900.000 $8.000 $10.000 $10.000 $16.000
110 6001 EXCAVATION (ROADWAY) CY 325.000 $10.000 $10.000 $30.000 $35.000
110 6002 EXCAVATION (CHANNEL) CY 475.000 $15.000 $10.000 $30.000 $45.000
132 6003 EMBANKMENT (FINAL)(ORD COMP)(TY B) CY 62.000 $25.000 $30.000 $100.000 $70.000
160 6003 FURNISHING AND PLACING TOPSOIL (4") SY 3,402.000 $2.000 $3.000 $3.000 $8.000
164 6003 BROADCAST SEED (PERM) (RURAL) (CLAY) SY 3,402.000 $0.250 $1.000 $2.000 $2.000
164 6009 BROADCAST SEED (TEMP) (WARM) SY 1,701.000 $0.150 $1.000 $2.000 $2.000
164 6011 BROADCAST SEED (TEMP) (COOL) SY 1,701.000 $0.150 $1.000 $2.000 $2.000
168 6001 VEGETATIVE WATERING MG 70.000 $20.000 $40.000 $1.000 $36.000
216 6001 PROOF ROLLING HR 6.000 $125.000 $100.000 $1.000 $150.000
247 6230 FL BS (CMP IN PLACE)(TY A GR 1-2)(8") SY 1,504.000 $15.000 $33.000 $35.000 $18.000
400 6005 CEM STABIL BKFL CY 26.000 $85.000 $225.000 $300.000 $450.000
416 6002 DRILL SHAFT (24 IN) LF 204.000 $165.000 $300.000 $230.000 $345.000
420 6013 CL C CONC (ABUT) CY 18.400 $1,250.000 $1,100.000 $2,000.000 $2,400.000
420 6029 CL C CONC (CAP) CY 6.600 $1,275.000 $1,200.000 $2,500.000 $2,200.000
420 6037 CL C CONC (COLUMN) CY 3.500 $1,000.000 $1,200.000 $2,500.000 $2,050.000
422 6001 REINF CONC SLAB SF 2,600.000 $20.000 $21.000 $25.000 $35.000
425 6010 PRESTR CONC SLAB BEAM (5SB12) LF 495.000 $210.000 $252.000 $330.000 $355.000
432 6002 RIPRAP (CONC)(5 IN) CY 18.000 $500.000 $550.000 $600.000 $375.000
432 6031 RIPRAP (STONE PROTECTION)(12 IN) CY 246.000 $190.000 $150.000 $175.000 $100.000
432 6045 RIPRAP (MOW STRIP)(4 IN) CY 24.000 $600.000 $550.000 $600.000 $110.000
450 6006 RAIL (TY T223) LF 224.000 $125.000 $100.000 $150.000 $180.000
454 6004 ARMOR JOINT (SEALED) LF 52.000 $140.000 $150.000 $150.000 $145.000
496 6009 REMOV STR (BRIDGE 0 - 99 FT LENGTH) EA 1.000 $26,000.000 $45,000.000 $30,000.000 $80,000.000
500 6001 MOBILIZATION LS 1.000 $50,416.480 $55,000.000 $70,000.000 $16,200.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 5.000 $9,000.000 $10,000.000 $5,000.000 $1,725.000
506 6001 ROCK FILTER DAMS (INSTALL) (TY 1) LF 120.000 $30.000 $35.000 $1.000 $27.000
506 6011 ROCK FILTER DAMS (REMOVE) LF 120.000 $10.000 $5.000 $1.000 $15.000
506 6041 BIODEG EROSN CONT LOGS (INSTL) (12") LF 185.000 $7.000 $7.000 $5.000 $9.000
506 6043 BIODEG EROSN CONT LOGS (REMOVE) LF 185.000 $2.000 $1.000 $1.000 $3.500
530 6016 DRIVEWAYS (BASE) SY 47.000 $35.000 $55.000 $70.000 $33.000
540 6002 MTL W-BEAM GD FEN (STEEL POST) LF 100.000 $30.000 $40.000 $35.000 $80.000
540 6007 MTL BEAM GD FEN TRANS (TL2) EA 4.000 $1,300.000 $2,000.000 $2,000.000 $1,600.000
544 6001 GUARDRAIL END TREATMENT (INSTALL) EA 4.000 $3,500.000 $3,500.000 $3,500.000 $3,300.000
552 6003 WIRE FENCE (TY C) LF 66.000 $15.000 $20.000 $30.000 $48.000
644 6060 IN SM RD SN SUP&AM TYTWT(1)WS(P) EA 4.000 $500.000 $750.000 $1,200.000 $1,450.000
658 6015 INSTL DEL ASSM (D-SW)SZ (BRF)GF1 EA 12.000 $30.000 $25.000 $30.000 $195.000
658 6080 INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND EA 2.000 $100.000 $25.000 $50.000 $350.000
4171 6001 INSTALL BRIDGE IDENTIFICATION NUMBERS EA 1.000 $400.000 $400.000 $500.000 $1,150.000
Totals: $554,581.28 $659,587.00 $758,160.00 $777,490.00