Show Job Controls
Bid Cobra

COKE CR (0907-14-009)

Items: 35

County: COKE
Length: N/A
Highway: CR
District: SAN ANGELO
Control Number: 0907-14-009
DBE Goal: N/A
Project: BR 2021(023)
Guaranty: N/A
Time: 82 WORKING DAYS
Engineer's Estimate: $364,846.90
Date: 04/07/2021 (5 years ago)
Contract Number: N/A
Type: BRIDGE REPLACEMENT
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Documents:
Bidders (5)
E
Engineer's Estimate
$364,846.90
Over/Under Est: 9.25% $33,738.30
Over/Under Est: 35.27% $128,692.57
Amt Left: 23.82% $94,954.27
Over/Under Est: 50.76% $185,182.68
Amt Left: 38% $151,444.38
Delta: -11.45% -$56,490.11
Over/Under Est: 76.21% $278,053.10
Amt Left: 61.3% $244,314.80
Delta: -16.88% -$92,870.42
Over/Under Est: 77.01% $280,981.83
Amt Left: 62.03% $247,243.53
Delta: -0.46% -$2,928.73

Bid Items & Bid Tabulations

35 Total 0 of 35
COKE  |  CR  |  SAN ANGELO  |  0907-14-009  |  04/07/2021  |  $364,846.90  |  BR 2021(023)  |  BRIDGE REPL  |  82 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
HODGES AND SON CONSTRUCTION COMPANY, INC.
INTEGRITY SERVICES, LLC
SCOTT TUCKER CONSTRUCTION COMPANY, LLC
A GREATER AUSTIN DEVELOPMENT COMPANY, INC.
SALINAS CONSTRUCTION TECHNOLOGIES, LTD.
PREPARING ROW
STA 3.700 $635.000 $2,500.000 $2,500.000 $1,796.240 $1,200.000 $5,703.080
EXCAVATION (ROADWAY)
CY 345.000 $10.700 $10.000 $12.000 $39.130 $28.000 $15.240
EXCAVATION (CHANNEL)
CY 195.000 $17.100 $10.000 $15.000 $45.610 $28.000 $28.470
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 30.000 $7.600 $50.000 $25.000 $132.930 $28.000 $105.240
FURNISHING AND PLACING TOPSOIL (4")
SY 880.000 $1.000 $4.000 $2.000 $9.370 $14.000 $5.100
BROADCAST SEED (PERM) (RURAL) (CLAY)
SY 880.000 $0.900 $3.000 $6.330 $2.010 $1.000 $0.700
BROADCAST SEED (TEMP) (WARM)
SY 440.000 $0.150 $1.000 $12.650 $2.180 $1.000 $0.860
BROADCAST SEED (TEMP) (COOL)
SY 440.000 $0.150 $1.000 $12.650 $2.180 $1.000 $0.860
VEGETATIVE WATERING
MG 18.000 $12.000 $1.000 $30.000 $188.900 $31.000 $153.790
PROOF ROLLING
HR 4.000 $80.000 $10.000 $85.000 $384.410 $95.000 $65.500
FL BS (CMP IN PLACE)(TY A GR 1-2)(8")
SY 734.000 $8.500 $40.000 $18.270 $63.190 $36.000 $37.280
CEM STABIL BKFL
CY 62.000 $120.000 $225.000 $220.000 $254.660 $300.000 $196.560
DRILL SHAFT (36 IN)
LF 150.000 $203.000 $230.000 $265.440 $328.090 $450.000 $367.870
CL C CONC (ABUT)
CY 35.600 $1,050.000 $1,000.000 $1,100.000 $1,262.640 $1,300.000 $1,189.200
REINF CONC SLAB
SF 2,210.000 $21.900 $24.000 $24.000 $23.320 $30.000 $35.410
PRESTR CONC GIRDER (TX34)
LF 338.000 $165.000 $185.000 $185.570 $232.390 $200.000 $228.530
RIPRAP (STONE PROTECTION)(18 IN)
CY 174.000 $110.000 $125.000 $150.000 $187.350 $250.000 $263.870
RAIL (TY T223) (MOD)
LF 206.000 $105.000 $120.000 $125.000 $238.420 $231.000 $232.710
ARMOR JOINT (SEALED)
LF 44.000 $130.000 $75.000 $126.320 $179.940 $175.000 $205.190
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
EA 1.000 $18,650.000 $15,000.000 $52,640.000 $17,894.120 $28,005.000 $14,265.530
MOBILIZATION
LS 1.000 $27,000.000 $36,000.000 $73,200.650 $55,090.000 $61,000.000 $113,804.960
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 5.000 $7,500.000 $3,000.000 $1,300.000 $1,266.680 $5,000.000 $2,631.700
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 60.000 $26.400 $1.000 $30.000 $34.770 $39.000 $29.770
ROCK FILTER DAMS (REMOVE)
LF 60.000 $9.600 $1.000 $11.000 $18.770 $22.000 $13.270
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 84.000 $5.500 $1.000 $5.680 $7.180 $13.000 $18.120
BIODEG EROSN CONT LOGS (REMOVE)
LF 84.000 $0.900 $1.000 $2.990 $1.970 $7.000 $4.370
MTL W-BEAM GD FEN (STEEL POST)
LF 100.000 $25.000 $26.000 $32.480 $28.180 $76.000 $33.260
MTL BEAM GD FEN TRANS (TL2)
EA 4.000 $1,235.000 $1,000.000 $1,108.800 $1,036.910 $1,882.000 $1,123.030
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $2,625.000 $2,600.000 $3,024.000 $2,321.910 $3,523.000 $3,004.030
WIRE FENCE (TY C)
LF 232.000 $13.100 $20.000 $20.000 $19.890 $108.000 $22.590
WIRE FENCE (WATER GAP)
LF 241.000 $38.000 $30.000 $43.180 $53.700 $134.000 $55.560
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 6.000 $21.500 $20.000 $11.760 $18.000 $28.000 $25.160
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 12.000 $27.800 $20.000 $35.840 $20.000 $50.000 $46.540
INSTALL BRIDGE IDENTIFICATION NUMBERS
EA 1.000 $250.000 $800.000 $350.000 $407.000 $560.000 $686.100
BIRD EXCLUSION METHOD
SF 2,692.000 $1.500 $0.100 $2.500 $2.310 $3.250 $7.750
Totals: $364,846.900 $398,585.200 $493,539.470 $550,029.592 $642,900.000 $645,828.736