COKE US 277 (0264-04-052)

Items: 77

County: COKE
Length: N/A
Highway: US 277
District: SAN ANGELO
Control Number: 0264-04-052
DBE Goal: N/A
Project: C 264-4-52
Guaranty: N/A
Time: 199 WORKING DAYS
Engineer's Estimate: $6,066,479.65
Date: 08/08/2018 (7 years ago)
Contract Number: N/A
Type: RESTORATION OF EXISTING ROAD
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (2)
E
Engineer's Estimate
$6,066,479.65
$7,015,129.12
Over/Under Est: 15.64% $948,649.47
Over/Under Est: 20.73% $1,257,680.67
Amt Left: 4.41% $309,031.20

Bid Items & Bid Tabulations

77 Total 0 of 77
COKE  |  US 277  |  SAN ANGELO  |  0264-04-052  |  08/08/2018  |  $6,066,479.65  |  C 264-4-52  |  RESTOR OF EXIST ROAD  |  199 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
REECE ALBERT, INC.
DELHUR INDUSTRIES, INC.
PREPARING ROW
STA 8.500 $800.000 $2,329.840 $11,880.000
PREP ROW (TREE)(GREATER THAN 8 IN DIA)
EA 5.000 $500.000 $2,568.780 $900.000
EXCAVATION (ROADWAY)
CY 879.000 $15.000 $12.340 $18.000
BACKFILL (TY A)
STA 413.900 $140.000 $910.170 $180.000
BACKFILL (TY B)
STA 413.900 $60.000 $161.850 $400.000
BLADING
HR 107.000 $150.000 $183.240 $180.000
DRILL SEEDING (PERM) (RURAL) (CLAY)
AC 104.000 $600.000 $512.730 $548.680
DRILL SEEDING (TEMP) (WARM)
AC 104.000 $600.000 $384.290 $411.180
DRILL SEEDING (TEMP) (COOL)
AC 104.000 $600.000 $455.190 $486.805
PROOF ROLLING
HR 63.000 $100.000 $72.980 $120.000
FL BS (CMP IN PLC)(TYA GR1-2) (6")
SY 190,990.000 $7.500 $7.780 $7.000
FL BS (RDWY DEL) (TY A GR 1-2)
TON 19,218.000 $35.000 $18.460 $30.000
FL BS (CMP IN PLACE)(TY A GR 1-2)(12")
SY 1,289.000 $20.000 $106.770 $16.416
CEMENT
TON 2,141.000 $155.000 $202.530 $218.300
CEM TRT (MX EXST MTL & NW BS)(DC)(6")
SY 183,022.000 $3.000 $2.260 $2.100
ASPH (MULTI OPTION)
GAL 73,975.000 $3.250 $3.410 $4.400
ASPH (RC-250)
GAL 44,686.000 $4.000 $4.710 $5.225
AGGR(TY-PB GR-3 SAC-B)
CY 1,951.000 $93.000 $137.350 $106.900
AGGR(TY-PB GR-4 SAC-B)
CY 1,873.000 $93.000 $119.050 $106.900
AGGR(TY-PB GR-5 SAC-B)
CY 1,456.000 $93.000 $157.720 $106.900
ASPH(AC-15P,AC-20-5TR,AC-20XP,AC10-2TR)
GAL 70,482.000 $3.250 $3.650 $3.850
D-GR HMA(SQ) TY-B PG70-22
TON 587.000 $85.000 $165.760 $207.500
CONC STR REPAIR (EPOXY MORTAR)
SF 30.000 $250.000 $195.230 $209.000
RIPRAP (MOW STRIP)(4 IN)
CY 4.000 $1,500.000 $1,039.630 $1,100.000
CLEANING AND SEALING EXISTING JOINTS
LF 387.000 $25.000 $51.380 $55.000
SET (TY II) (18 IN) (CMP) (4: 1) (P)
EA 2.000 $2,000.000 $2,003.910 $1,650.000
SET (TY II) (DES 4) (CMP) (4: 1) (P)
EA 6.000 $2,000.000 $2,837.990 $2,200.000
CLEAN EXIST CULVERTS
EA 11.000 $2,500.000 $3,523.450 $1,100.000
MOBILIZATION
LS 1.000 $423,000.000 $601,642.830 $821,760.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 12.000 $8,500.000 $10,031.670 $17,295.100
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 624.000 $30.000 $16.520 $34.617
CONSTRUCTION EXITS (REMOVE)
SY 624.000 $10.000 $4.760 $10.824
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 2,090.000 $5.500 $5.050 $9.001
BIODEG EROSN CONT LOGS (REMOVE)
LF 2,090.000 $1.000 $1.100 $2.377
INTERSECTIONS (ACP)
SY 2,472.000 $60.000 $55.460 $60.000
DRIVEWAYS (SURF TREAT)
SY 2,043.000 $15.000 $67.530 $32.400
TURNOUTS (SURF TREAT)
SY 750.000 $15.000 $57.720 $48.000
MTL W-BEAM GD FEN (STEEL POST)
LF 4,900.000 $25.000 $24.170 $28.853
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $1,800.000 $1,975.280 $2,465.100
MTL W - BEAM GD FEN (LOW FILL CULVERT)
LF 53.340 $50.000 $76.930 $104.500
MTL BM GD FEN (LONG SPAN SYSTEM)
EA 12.000 $1,200.000 $1,143.590 $1,265.000
REMOVE METAL BEAM GUARD FENCE
LF 450.000 $3.000 $2.600 $3.300
GUARDRAIL END TREATMENT (INSTALL)
EA 36.000 $2,300.000 $2,910.940 $3,074.500
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 20.000 $25.000 $31.190 $22.000
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
EA 239.000 $25.000 $31.190 $22.000
INSTL OM ASSM (OM-2Z)(FLX)GND
EA 16.000 $75.000 $140.350 $148.500
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 213,115.000 $0.250 $0.140 $0.187
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 255,738.000 $0.160 $0.140 $0.154
WK ZN PAV MRK REMOV (REFL) TY II-A-A
EA 4,262.000 $4.000 $3.850 $4.125
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 8,525.000 $0.650 $1.910 $2.300
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 636.000 $0.650 $0.870 $0.935
REFL PAV MRK TY I (W)24"(SLD)(090MIL)
LF 160.000 $7.500 $16.440 $17.600
REFL PAV MRK TY I (Y)8"(SLD)(090MIL)
LF 2,048.000 $2.000 $0.870 $0.935
REFL PAV MRK TY II (W) 4" (SLD)
LF 84,798.000 $0.120 $0.140 $0.154
REFL PAV MRK TY II (W) 8" (SLD)
LF 636.000 $0.350 $0.310 $0.330
REFL PAV MRK TY II (W) 24" (SLD)
LF 160.000 $2.700 $6.170 $6.600
REFL PAV MRK TY II (Y) 4" (BRK)
LF 8,490.000 $0.120 $0.140 $0.154
REFL PAV MRK TY II (Y) 4" (SLD)
LF 23,253.000 $0.120 $0.140 $0.154
REFL PAV MRK TY II (Y) 8" (SLD)
LF 2,048.000 $0.300 $0.310 $0.330
REF PROF PAV MRK TY I(W)4"(SLD)(090MIL)
LF 83,366.000 $0.450 $0.770 $0.825
REF PROF PAV MRK TY I(Y)4"(SLD)(090MIL)
LF 22,095.000 $0.400 $0.770 $0.825
REF PROF PAV MRK TY I(Y)4"(BRK)(090MIL)
LF 8,490.000 $0.400 $0.870 $0.935
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
LF 1,846.000 $0.300 $0.410 $0.440
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
LF 828.000 $0.300 $0.410 $0.440
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
EA 10.000 $35.000 $25.690 $27.500
REFL PAV MRKR TY I-C
EA 37.000 $3.300 $5.140 $5.500
REFL PAV MRKR TY II-A-A
EA 928.000 $2.700 $2.770 $2.970
REFL PAV MRKR TY II-C-R
EA 28.000 $2.700 $5.140 $5.500
ELIM EXT PAV MRK & MRKS (4")
LF 170,492.000 $0.550 $0.890 $0.495
ELIM EXT PAV MRK & MRKS (8")
LF 2,048.000 $0.900 $0.900 $0.990
FULL - WIDTH MOWING
CYC 2.000 $3,500.000 $8,014.600 $16,500.000
LITTER REMOVAL
CYC 2.000 $2,500.000 $4,829.310 $16,500.000
FILLING MILLED ASPHALT RUMBLE STRIPS
LF 20,650.000 $3.500 $2.300 $1.100
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $9,500.000 $15,864.000 $19,141.100
PREFORMED CENTERLINE RUMBLE STRIP
LF 3,350.000 $3.500 $5.390 $5.775
TMA (STATIONARY)
DAY 400.000 $140.000 $175.720 $550.000
TMA (MOBILE OPERATION)
HR 675.000 $50.000 $32.460 $154.000
Totals: $6,066,479.650 $7,015,129.134 $7,324,160.354