PREPARING ROW
|
STA
|
8.500
|
$800.000
|
$2,329.840
|
$11,880.000
|
|
|
PREP ROW (TREE)(GREATER THAN 8 IN DIA)
|
EA
|
5.000
|
$500.000
|
$2,568.780
|
$900.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
879.000
|
$15.000
|
$12.340
|
$18.000
|
|
|
BACKFILL (TY A)
|
STA
|
413.900
|
$140.000
|
$910.170
|
$180.000
|
|
|
BACKFILL (TY B)
|
STA
|
413.900
|
$60.000
|
$161.850
|
$400.000
|
|
|
BLADING
|
HR
|
107.000
|
$150.000
|
$183.240
|
$180.000
|
|
|
DRILL SEEDING (PERM) (RURAL) (CLAY)
|
AC
|
104.000
|
$600.000
|
$512.730
|
$548.680
|
|
|
DRILL SEEDING (TEMP) (WARM)
|
AC
|
104.000
|
$600.000
|
$384.290
|
$411.180
|
|
|
DRILL SEEDING (TEMP) (COOL)
|
AC
|
104.000
|
$600.000
|
$455.190
|
$486.805
|
|
|
PROOF ROLLING
|
HR
|
63.000
|
$100.000
|
$72.980
|
$120.000
|
|
|
FL BS (CMP IN PLC)(TYA GR1-2) (6")
|
SY
|
190,990.000
|
$7.500
|
$7.780
|
$7.000
|
|
|
FL BS (RDWY DEL) (TY A GR 1-2)
|
TON
|
19,218.000
|
$35.000
|
$18.460
|
$30.000
|
|
|
FL BS (CMP IN PLACE)(TY A GR 1-2)(12")
|
SY
|
1,289.000
|
$20.000
|
$106.770
|
$16.416
|
|
|
CEMENT
|
TON
|
2,141.000
|
$155.000
|
$202.530
|
$218.300
|
|
|
CEM TRT (MX EXST MTL & NW BS)(DC)(6")
|
SY
|
183,022.000
|
$3.000
|
$2.260
|
$2.100
|
|
|
ASPH (MULTI OPTION)
|
GAL
|
73,975.000
|
$3.250
|
$3.410
|
$4.400
|
|
|
ASPH (RC-250)
|
GAL
|
44,686.000
|
$4.000
|
$4.710
|
$5.225
|
|
|
AGGR(TY-PB GR-3 SAC-B)
|
CY
|
1,951.000
|
$93.000
|
$137.350
|
$106.900
|
|
|
AGGR(TY-PB GR-4 SAC-B)
|
CY
|
1,873.000
|
$93.000
|
$119.050
|
$106.900
|
|
|
AGGR(TY-PB GR-5 SAC-B)
|
CY
|
1,456.000
|
$93.000
|
$157.720
|
$106.900
|
|
|
ASPH(AC-15P,AC-20-5TR,AC-20XP,AC10-2TR)
|
GAL
|
70,482.000
|
$3.250
|
$3.650
|
$3.850
|
|
|
D-GR HMA(SQ) TY-B PG70-22
|
TON
|
587.000
|
$85.000
|
$165.760
|
$207.500
|
|
|
CONC STR REPAIR (EPOXY MORTAR)
|
SF
|
30.000
|
$250.000
|
$195.230
|
$209.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
4.000
|
$1,500.000
|
$1,039.630
|
$1,100.000
|
|
|
CLEANING AND SEALING EXISTING JOINTS
|
LF
|
387.000
|
$25.000
|
$51.380
|
$55.000
|
|
|
SET (TY II) (18 IN) (CMP) (4: 1) (P)
|
EA
|
2.000
|
$2,000.000
|
$2,003.910
|
$1,650.000
|
|
|
SET (TY II) (DES 4) (CMP) (4: 1) (P)
|
EA
|
6.000
|
$2,000.000
|
$2,837.990
|
$2,200.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
11.000
|
$2,500.000
|
$3,523.450
|
$1,100.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$423,000.000
|
$601,642.830
|
$821,760.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
12.000
|
$8,500.000
|
$10,031.670
|
$17,295.100
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
624.000
|
$30.000
|
$16.520
|
$34.617
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
624.000
|
$10.000
|
$4.760
|
$10.824
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
2,090.000
|
$5.500
|
$5.050
|
$9.001
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
2,090.000
|
$1.000
|
$1.100
|
$2.377
|
|
|
INTERSECTIONS (ACP)
|
SY
|
2,472.000
|
$60.000
|
$55.460
|
$60.000
|
|
|
DRIVEWAYS (SURF TREAT)
|
SY
|
2,043.000
|
$15.000
|
$67.530
|
$32.400
|
|
|
TURNOUTS (SURF TREAT)
|
SY
|
750.000
|
$15.000
|
$57.720
|
$48.000
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
4,900.000
|
$25.000
|
$24.170
|
$28.853
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$1,800.000
|
$1,975.280
|
$2,465.100
|
|
|
MTL W - BEAM GD FEN (LOW FILL CULVERT)
|
LF
|
53.340
|
$50.000
|
$76.930
|
$104.500
|
|
|
MTL BM GD FEN (LONG SPAN SYSTEM)
|
EA
|
12.000
|
$1,200.000
|
$1,143.590
|
$1,265.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
450.000
|
$3.000
|
$2.600
|
$3.300
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
36.000
|
$2,300.000
|
$2,910.940
|
$3,074.500
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
20.000
|
$25.000
|
$31.190
|
$22.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
|
EA
|
239.000
|
$25.000
|
$31.190
|
$22.000
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND
|
EA
|
16.000
|
$75.000
|
$140.350
|
$148.500
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
213,115.000
|
$0.250
|
$0.140
|
$0.187
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
255,738.000
|
$0.160
|
$0.140
|
$0.154
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-A-A
|
EA
|
4,262.000
|
$4.000
|
$3.850
|
$4.125
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
8,525.000
|
$0.650
|
$1.910
|
$2.300
|
|
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
|
LF
|
636.000
|
$0.650
|
$0.870
|
$0.935
|
|
REFL PAV MRK TY I (W)24"(SLD)(090MIL)
|
LF
|
160.000
|
$7.500
|
$16.440
|
$17.600
|
|
REFL PAV MRK TY I (Y)8"(SLD)(090MIL)
|
LF
|
2,048.000
|
$2.000
|
$0.870
|
$0.935
|
|
REFL PAV MRK TY II (W) 4" (SLD)
|
LF
|
84,798.000
|
$0.120
|
$0.140
|
$0.154
|
|
REFL PAV MRK TY II (W) 8" (SLD)
|
LF
|
636.000
|
$0.350
|
$0.310
|
$0.330
|
|
REFL PAV MRK TY II (W) 24" (SLD)
|
LF
|
160.000
|
$2.700
|
$6.170
|
$6.600
|
|
REFL PAV MRK TY II (Y) 4" (BRK)
|
LF
|
8,490.000
|
$0.120
|
$0.140
|
$0.154
|
|
REFL PAV MRK TY II (Y) 4" (SLD)
|
LF
|
23,253.000
|
$0.120
|
$0.140
|
$0.154
|
|
REFL PAV MRK TY II (Y) 8" (SLD)
|
LF
|
2,048.000
|
$0.300
|
$0.310
|
$0.330
|
|
|
REF PROF PAV MRK TY I(W)4"(SLD)(090MIL)
|
LF
|
83,366.000
|
$0.450
|
$0.770
|
$0.825
|
|
|
REF PROF PAV MRK TY I(Y)4"(SLD)(090MIL)
|
LF
|
22,095.000
|
$0.400
|
$0.770
|
$0.825
|
|
|
REF PROF PAV MRK TY I(Y)4"(BRK)(090MIL)
|
LF
|
8,490.000
|
$0.400
|
$0.870
|
$0.935
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
|
LF
|
1,846.000
|
$0.300
|
$0.410
|
$0.440
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
|
LF
|
828.000
|
$0.300
|
$0.410
|
$0.440
|
|
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
|
EA
|
10.000
|
$35.000
|
$25.690
|
$27.500
|
|
REFL PAV MRKR TY I-C
|
EA
|
37.000
|
$3.300
|
$5.140
|
$5.500
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
928.000
|
$2.700
|
$2.770
|
$2.970
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
28.000
|
$2.700
|
$5.140
|
$5.500
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
170,492.000
|
$0.550
|
$0.890
|
$0.495
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
2,048.000
|
$0.900
|
$0.900
|
$0.990
|
|
|
FULL - WIDTH MOWING
|
CYC
|
2.000
|
$3,500.000
|
$8,014.600
|
$16,500.000
|
|
|
LITTER REMOVAL
|
CYC
|
2.000
|
$2,500.000
|
$4,829.310
|
$16,500.000
|
|
|
FILLING MILLED ASPHALT RUMBLE STRIPS
|
LF
|
20,650.000
|
$3.500
|
$2.300
|
$1.100
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$9,500.000
|
$15,864.000
|
$19,141.100
|
|
|
PREFORMED CENTERLINE RUMBLE STRIP
|
LF
|
3,350.000
|
$3.500
|
$5.390
|
$5.775
|
|
|
TMA (STATIONARY)
|
DAY
|
400.000
|
$140.000
|
$175.720
|
$550.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
675.000
|
$50.000
|
$32.460
|
$154.000
|
|
Totals: |
$6,066,479.650
|
$7,015,129.134
|
$7,324,160.354
|