CLAY FM 174 (0681-08-024)

Items: 41

County: CLAY
Length: N/A
Highway: FM 174
District: WICHITA FALLS
Control Number: 0681-08-024
DBE Goal: N/A
Project: STP 2020(982)HES
Guaranty: N/A
Time: 68 WORKING DAYS
Engineer's Estimate: $270,144.50
Date: 07/08/2020 (5 years ago)
Contract Number: N/A
Type: PROVIDE ADDITIONAL PAVED SURFACE WIDTH
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (2)
E
Engineer's Estimate
$270,144.50
$367,886.95
Over/Under Est: 36.18% $97,742.45
Over/Under Est: 46.22% $124,859.20
Amt Left: 7.37% $27,116.75

Bid Items & Bid Tabulations

41 Total 0 of 41
CLAY  |  FM 174  |  WICHITA FALLS  |  0681-08-024  |  07/08/2020  |  $270,144.50  |  STP 2020(982)HES  |  PROVIDE ADDITIONAL PAVED SURF WIDTH  |  68 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
PEACHTREE CONSTRUCTION, LTD.
A. L. HELMCAMP, INC.
EXCAVATION (ROADWAY)
CY 257.000 $30.000 $52.000 $60.000
EMBANKMENT (FINAL)(DENS CONT)(TY B)
CY 441.000 $15.000 $68.000 $70.000
BLOCK SODDING
SY 59.000 $8.000 $45.000 $8.000
BROADCAST SEED (TEMP) (WARM)
SY 1,003.000 $1.500 $0.450 $1.150
BROADCAST SEED (TEMP) (COOL)
SY 1,003.000 $1.500 $0.450 $1.150
DRILL SEEDING (PERM) (RURAL) (SANDY)
SY 2,006.000 $1.500 $0.600 $0.800
VEGETATIVE WATERING
MG 17.000 $45.000 $300.000 $20.000
EMULS ASPH (EROSN CONT)(MULTI)
GAL 899.000 $4.500 $7.850 $4.000
D-GR HMA(SQ) TY-B PG64-22
TON 315.000 $90.000 $142.000 $300.000
D-GR HMA(SQ) TY-D SAC-B PG70-22
TON 577.000 $110.000 $103.000 $114.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
SY 151.000 $120.000 $130.000 $100.000
PLANE ASPH CONC PAV(0" TO 2")
SY 1,245.000 $5.000 $7.600 $7.000
CEM STABIL BKFL
CY 16.000 $220.000 $240.000 $480.000
CUT & RESTORING PAV
SY 12.000 $150.000 $500.000 $220.000
RC PIPE (CL III)(18 IN)
LF 64.000 $250.000 $121.000 $76.000
SET (TY II) (18 IN) (CMP) (6: 1) (P)
EA 2.000 $1,500.000 $1,800.000 $1,200.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 3.000 $1,500.000 $1,800.000 $1,200.000
REMOV STR (SET)
EA 3.000 $900.000 $150.000 $1,100.000
REMOV STR (PIPE)
LF 32.000 $50.000 $25.000 $55.000
MOBILIZATION
LS 1.000 $24,689.000 $30,000.000 $34,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 4.000 $6,000.000 $13,000.000 $10,000.000
TEMP PAVED FLUME (INSTALL)
SY 18.000 $35.000 $100.000 $56.000
TEMP PAVED FLUME (REMOVE)
SY 18.000 $10.000 $90.000 $43.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 420.000 $7.000 $6.300 $5.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 420.000 $2.000 $2.900 $1.000
DRIVEWAYS (ACP)
SY 143.000 $40.000 $52.000 $65.000
TURNOUTS (ACP)
SY 22.000 $60.000 $225.000 $110.000
DRIVEWAYS (BASE)
SY 36.000 $30.000 $25.000 $80.000
RUMBLE STRIPS (SHOULDER) ASPHALT
LF 2,560.000 $0.150 $2.500 $2.400
RUMBLE STRIPS (CENTERLINE) ASPHALT
LF 1,280.000 $0.150 $2.500 $2.400
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 1.000 $250.000 $400.000 $230.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 4.000 $800.000 $760.000 $410.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 3.000 $800.000 $884.000 $620.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 1.000 $800.000 $1,000.000 $740.000
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 10.000 $800.000 $570.000 $350.000
REMOVE SM RD SN SUP&AM
EA 8.000 $95.000 $190.000 $120.000
INSTL OM ASSM (OM-2Z)(FLX)GND(BI)
EA 3.000 $90.000 $190.000 $66.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 176.000 $1.500 $2.500 $1.000
TACK COAT
GAL 210.000 $1.500 $2.750 $4.000
TMA (STATIONARY)
DAY 66.000 $250.000 $260.000 $250.000
TMA (MOBILE OPERATION)
DAY 2.000 $250.000 $650.000 $650.000
Totals: $270,144.500 $367,886.950 $395,003.700