Show Job Controls
Bid Cobra

CLAY SH 148 (0391-03-031)

Items: 49

County: CLAY
Length: N/A
Highway: SH 148
District: WICHITA FALLS
Control Number: 0391-03-031
DBE Goal: N/A
Project: STP 2019(957)
Guaranty: N/A
Time: 94 WORKING DAYS
Engineer's Estimate: $914,851.40
Date: 05/07/2019 (7 years ago)
Contract Number: N/A
Type: REHABILITATE EXISTING SHOULDERS AND OVERLAY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (4)
E
Engineer's Estimate
$914,851.40
$1,041,710.84
Over/Under Est: 13.87% $126,859.44
$1,304,938.20
Over/Under Est: 42.64% $390,086.80
Amt Left: 25.27% $263,227.36
$1,527,200.59
Over/Under Est: 66.93% $612,349.19
Amt Left: 46.61% $485,489.75
Delta: -17.03% -$222,262.39
$1,581,532.00
Over/Under Est: 72.87% $666,680.60
Amt Left: 51.82% $539,821.16
Delta: -3.56% -$54,331.41

Bid Items & Bid Tabulations

49 Total 0 of 49
CLAY  |  SH 148  |  WICHITA FALLS  |  0391-03-031  |  05/07/2019  |  $914,851.40  |  STP 2019(957)  |  REHAB EXIST SHOULDERS AND OVERLAY  |  94 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ZACK BURKETT CO.
A. L. HELMCAMP, INC.
DUININCK, INC.
FNH CONSTRUCTION, LLC
PREPARING ROW
STA 3.000 $4,900.000 $5,000.000 $11,000.000 $2,000.000 $30,000.000
REMOVING CONC (RIPRAP)
SY 68.000 $115.000 $15.000 $50.000 $41.500 $20.000
REMOVING CONC (CURB)
LF 388.000 $22.000 $15.000 $35.000 $14.000 $20.000
EXCAVATION (ROADWAY)
CY 208.000 $25.000 $12.000 $50.000 $34.500 $20.000
SUBGRADE WIDENING (ORD COMP)
STA 39.000 $300.000 $1,200.000 $650.000 $1,600.000 $450.000
EMBANKMENT (VEHICLE)(ORD COMP)(TY B)
CY 117.000 $29.000 $17.500 $38.000 $180.000 $35.000
BACKFILL (TY A OR B)
STA 6.000 $300.000 $250.000 $750.000 $1,000.000 $450.000
BLOCK SODDING
SY 4,823.000 $5.000 $5.000 $6.000 $5.900 $6.000
BROADCAST SEED (PERM) (RURAL) (SANDY)
SY 3,636.000 $1.000 $0.150 $0.300 $0.360 $1.000
BROADCAST SEED (TEMP) (WARM)
SY 1,818.000 $1.000 $0.120 $0.300 $0.320 $1.000
BROADCAST SEED (TEMP) (COOL)
SY 1,818.000 $1.000 $0.120 $0.300 $0.340 $1.000
VEGETATIVE WATERING
MG 142.000 $30.000 $30.000 $22.000 $31.000 $50.000
D-GR HMA(SQ) TY-B PG64-22
TON 2,673.000 $80.000 $97.000 $105.000 $129.250 $120.000
D-GR HMA TY-D PG70-28
TON 2,450.000 $88.000 $98.000 $125.000 $155.000 $160.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(4")
SY 124.000 $30.000 $35.000 $75.000 $100.000 $85.000
PLANE ASPH CONC PAV(0" TO 2")
SY 2,914.000 $4.500 $4.130 $2.000 $3.650 $10.000
PLANE ASPH CONC PAV (2")
SY 7,246.000 $3.000 $3.540 $2.100 $2.450 $10.000
CL C CONC (MISC)
CY 3.500 $800.000 $3,540.000 $3,500.000 $3,600.000 $1,500.000
SET (TY II) (18 IN) (CMP) (6: 1) (P)
EA 2.000 $1,100.000 $1,416.000 $1,300.000 $1,400.000 $2,000.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 2.000 $1,000.000 $1,416.000 $1,300.000 $1,400.000 $2,000.000
ADJUSTING INLETS
EA 1.000 $3,250.000 $1,180.000 $1,300.000 $1,200.000 $2,000.000
CLEAN EXIST CULVERTS
EA 2.000 $1,800.000 $2,950.000 $2,500.000 $3,000.000 $1,500.000
MOBILIZATION
LS 1.000 $79,895.580 $102,850.000 $117,000.000 $150,000.000 $150,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 6.000 $6,000.000 $3,358.000 $10,000.000 $14,000.000 $8,500.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 960.000 $2.000 $7.500 $3.700 $2.950 $4.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 960.000 $0.900 $4.500 $1.300 $1.200 $2.000
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 360.000 $2.050 $12.000 $6.400 $5.900 $18.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 360.000 $0.500 $4.000 $1.200 $1.200 $12.000
CONC CURB (TY II)
LF 311.000 $18.000 $35.400 $35.000 $35.500 $25.000
DRIVEWAYS (CONC)
SY 467.000 $70.000 $100.300 $100.000 $100.000 $85.000
DRIVEWAYS (ACP)
SY 2,217.000 $32.000 $20.000 $70.000 $65.500 $45.000
DRIVEWAYS (BASE)
SY 190.000 $38.000 $12.000 $27.000 $21.500 $35.000
CONC SIDEWALKS (4")
SY 586.000 $60.000 $82.600 $80.000 $83.000 $65.000
CURB RAMPS (TY 7)
EA 5.000 $1,500.000 $1,534.000 $1,500.000 $1,500.000 $2,000.000
CURB RAMPS (TY 10)
EA 1.000 $1,800.000 $1,652.000 $1,800.000 $1,700.000 $2,000.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 1.000 $780.000 $779.000 $700.000 $780.000 $650.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T-EXAL)
EA 1.000 $930.000 $732.000 $700.000 $735.000 $650.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 1.000 $1,175.000 $1,204.000 $1,000.000 $1,200.000 $650.000
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 29.000 $550.000 $413.000 $400.000 $415.000 $650.000
REMOVE SM RD SN SUP&AM
EA 34.000 $98.000 $106.000 $95.000 $105.000 $100.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 448.000 $1.300 $1.000 $0.600 $1.200 $5.000
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 8,956.000 $0.460 $1.180 $0.600 $0.650 $1.000
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 8,956.000 $0.460 $1.180 $0.600 $0.650 $1.000
PREFAB PAV MRK TY C (W) (12") (SLD)
LF 80.000 $6.950 $19.000 $9.000 $9.500 $8.000
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 67.000 $14.500 $26.000 $16.000 $18.000 $20.000
REFL PAV MRKR TY II-A-A
EA 114.000 $5.500 $11.200 $11.000 $12.000 $15.000
BONDING COURSE
GAL 2,436.000 $3.650 $4.900 $6.000 $0.100 $20.000
TMA (STATIONARY)
DAY 77.000 $250.000 $147.500 $320.000 $525.000 $550.000
TMA (MOBILE OPERATION)
DAY 8.000 $300.000 $118.000 $730.000 $1,200.000 $850.000
Totals: $914,851.400 $1,041,710.840 $1,304,938.200 $1,527,200.590 $1,581,532.000