Show Job Controls
Bid Cobra

CLAY US 287 (0224-02-045)

Items: 77

County: CLAY
Length: N/A
Highway: US 287
District: WICHITA FALLS
Control Number: 0224-02-045
DBE Goal: N/A
Project: BR 2020(348)
Guaranty: N/A
Time: 142 WORKING DAYS
Engineer's Estimate: $2,983,972.34
Date: 12/04/2019 (6 years ago)
Contract Number: N/A
Type: BRIDGE REPLACEMENT
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (3)
E
Engineer's Estimate
$2,983,972.34
$3,436,318.50
Over/Under Est: 15.16% $452,346.16
$3,447,536.00
Over/Under Est: 15.54% $463,563.66
Amt Left: 0.33% $11,217.50
Over/Under Est: 21.54% $642,721.46
Amt Left: 5.54% $190,375.30
Delta: -5.20% -$179,157.80

Bid Items & Bid Tabulations

77 Total 0 of 77
CLAY  |  US 287  |  WICHITA FALLS  |  0224-02-045  |  12/04/2019  |  $2,983,972.34  |  BR 2020(348)  |  BRIDGE REPL  |  142 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
CDM HOLDINGS, LLC
EARTH BUILDERS LP
HODGES AND SON CONSTRUCTION COMPANY, INC.
PREPARING ROW
STA 4.000 $2,236.840 $4,000.000 $20,000.000 $5,000.000
REMOVING CONC (PAV)
SY 2,333.000 $5.250 $22.000 $20.000 $18.000
REMOVING CONC (RIPRAP)
SY 1,084.000 $25.170 $8.500 $10.000 $24.000
REMOVING CONC (APPR SLAB)
SY 325.000 $38.790 $45.000 $20.000 $60.000
REMOVING CONCRETE(MOW STRIP)
LF 817.000 $6.870 $12.000 $10.000 $26.000
REMOVING STAB BASE AND ASPH PAV (0-4")
SY 2,333.000 $15.790 $8.000 $8.000 $15.000
EXCAVATION (ROADWAY)
CY 215.000 $10.950 $22.000 $10.000 $20.000
EXCAVATION (CHANNEL)
CY 2,283.000 $15.000 $6.500 $10.000 $20.000
EMBANKMENT (FINAL)(DENS CONT)(TY A)
CY 737.000 $6.870 $11.000 $20.000 $40.000
COMPOST MANUF TOPSOIL (4")
SY 2,060.000 $1.180 $1.500 $10.000 $3.000
CELL FBR MLCH SEED(PERM)(RURAL)(SANDY)
SY 2,060.000 $2.540 $1.500 $2.000 $1.500
DRILL SEEDING (TEMP) (WARM)
AC 0.220 $400.410 $5,000.000 $10,000.000 $1,000.000
DRILL SEEDING (TEMP) (COOL)
AC 0.220 $433.520 $5,000.000 $10,000.000 $1,000.000
VEGETATIVE WATERING
MG 17.300 $35.660 $65.000 $100.000 $1.000
CEMENT
TON 26.000 $215.000 $150.000 $150.000 $300.000
CEMENT TREAT(EXIST MATL)(8")
SY 2,411.000 $5.000 $7.000 $10.000 $15.000
PRIME COAT (MC-30)
GAL 522.000 $5.700 $6.000 $10.000 $12.000
D-GR HMA(SQ) TY-B PG64-22
TON 483.200 $115.000 $150.000 $200.000 $200.000
CONC PVMT (CONT REINF - CRCP) (11")
SY 2,089.000 $95.000 $155.000 $80.000 $80.000
CEM STABIL BKFL
CY 238.000 $184.000 $180.000 $250.000 $200.000
TEMPORARY SPL SHORING
SF 500.000 $13.260 $45.000 $20.000 $70.000
DRILL SHAFT (18 IN)
LF 130.000 $166.930 $120.000 $150.000 $115.000
DRILL SHAFT (36 IN)
LF 1,812.000 $200.310 $162.000 $225.000 $155.000
CL C CONC (ABUT)(HPC)
CY 107.700 $1,054.030 $1,300.000 $1,000.000 $1,500.000
CL C CONC (CAP)(HPC)
CY 89.500 $1,095.960 $1,300.000 $1,000.000 $1,600.000
CL C CONC (COLUMN)(HPC)
CY 49.800 $836.840 $1,450.000 $1,000.000 $1,600.000
REINF CONC SLAB (HPC)
SF 17,266.000 $20.550 $18.000 $22.000 $28.000
APPROACH SLAB (HPC)
CY 207.000 $549.810 $475.000 $800.000 $850.000
PRESTR CONC GIRDER (TX28)
LF 2,512.800 $180.000 $130.000 $150.000 $165.000
RIPRAP (STONE COMMON)(DRY)(18 IN)
CY 401.000 $150.000 $110.000 $100.000 $140.000
RIPRAP (MOW STRIP)(4 IN)
CY 47.000 $462.690 $550.000 $800.000 $550.000
RIPRAP (STONE COMMON)(GROUT)(18 IN)
CY 393.000 $165.000 $265.000 $200.000 $175.000
RAIL (TY SSTR)(HPC)
LF 928.000 $70.130 $102.000 $150.000 $120.000
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
EA 2.000 $80,000.000 $175,000.000 $75,000.000 $100,000.000
MOBILIZATION
LS 1.000 $260,000.000 $342,000.000 $350,000.000 $320,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 10.000 $10,000.000 $7,000.000 $5,000.000 $3,000.000
ROCK FILTER DAMS (INSTALL) (TY 4)
LF 305.000 $25.000 $35.000 $50.000 $5.000
ROCK FILTER DAMS (REMOVE)
LF 305.000 $6.750 $10.000 $10.000 $1.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 156.000 $16.900 $25.000 $50.000 $1.000
CONSTRUCTION EXITS (REMOVE)
SY 156.000 $5.880 $15.000 $10.000 $1.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 2,180.000 $3.050 $3.500 $5.000 $1.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 2,180.000 $0.770 $2.000 $1.000 $1.000
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 300.000 $6.290 $10.000 $10.000 $6.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 300.000 $0.910 $2.000 $1.000 $3.000
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
LF 1,792.000 $31.900 $60.000 $75.000 $110.000
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 877.000 $4.170 $15.000 $20.000 $30.000
PORT CTB (REMOVE)(SGL SLP)(TY 1)
LF 1,792.000 $5.270 $40.000 $10.000 $35.000
RUMBLE STRIPS (SHOULDER) CONCRETE
LF 566.000 $0.890 $25.000 $20.000 $12.000
MTL W-BEAM GD FEN (TIM POST)
LF 600.000 $22.430 $20.000 $30.000 $22.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $1,980.180 $1,325.000 $2,500.000 $1,600.000
REMOVE METAL BEAM GUARD FENCE
LF 702.000 $2.260 $3.000 $10.000 $4.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $2,719.770 $2,300.000 $2,500.000 $2,800.000
GUARDRAIL END TREATMENT (REMOVE)
EA 4.000 $266.010 $1,000.000 $500.000 $500.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 1.000 $1,600.000 $4,000.000 $2,000.000 $2,500.000
CRASH CUSH ATTEN (REMOVE)
EA 3.000 $1,285.710 $1,500.000 $2,000.000 $1,000.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 3.000 $6,438.580 $10,000.000 $10,000.000 $10,000.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 6.000 $24.230 $40.000 $100.000 $40.000
INSTL DEL ASSM (D-SW)SZ (BRF)GF1
EA 6.000 $11.700 $40.000 $100.000 $40.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
EA 6.000 $12.270 $40.000 $100.000 $40.000
INSTL DEL ASSM (D-SY)SZ (BRF)GF1
EA 6.000 $24.010 $40.000 $100.000 $40.000
INSTL OM ASSM (OM-2X)(WC)GND
EA 4.000 $49.340 $150.000 $150.000 $40.000
REMOVE DELIN & OBJECT MARKER ASSMS
EA 18.000 $27.880 $50.000 $50.000 $20.000
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 3,105.000 $2.100 $2.500 $2.000 $0.500
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 2,950.000 $2.100 $2.500 $2.000 $0.500
REFL PAV MRK TY II (W) 4" (BRK)
LF 256.000 $1.200 $1.000 $1.000 $2.000
REFL PAV MRK TY II (W) 4" (SLD)
LF 1,022.000 $2.000 $1.000 $1.000 $1.000
REFL PAV MRK TY II (Y) 4" (SLD)
LF 1,022.000 $2.000 $1.000 $1.000 $2.000
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 256.000 $4.000 $3.000 $4.000 $2.000
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 1,022.000 $4.200 $3.000 $4.000 $2.000
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 1,022.000 $4.200 $3.000 $4.000 $1.000
REFL PAV MRKR TY II-C-R
EA 16.000 $3.370 $5.000 $20.000 $30.000
ELIM EXT PAV MRK & MRKS (4")
LF 1,540.000 $0.290 $2.000 $3.000 $1.000
PAV SURF PREP FOR MRK (4")
LF 2,300.000 $0.250 $3.000 $1.000 $0.500
PAV SURF PREP FOR MRK (RPM)
EA 16.000 $1.500 $5.000 $5.000 $30.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $9,559.230 $17,000.000 $15,000.000 $8,000.000
TMA (STATIONARY)
DAY 15.000 $500.000 $175.000 $500.000 $250.000
TMA (MOBILE OPERATION)
DAY 10.000 $480.000 $300.000 $1,500.000 $250.000
Totals: $2,983,972.336 $3,436,318.500 $3,447,536.000 $3,626,693.800