CLAY FM 174 (0137-10-022)

Items: 70

County: CLAY
Length: N/A
Highway: FM 174
District: WICHITA FALLS
Control Number: 0137-10-022
DBE Goal: N/A
Project: STP 2019(504)HES
Guaranty: N/A
Time: 170 WORKING DAYS
Engineer's Estimate: $2,104,517.25
Date: 02/05/2019 (7 years ago)
Contract Number: N/A
Type: PROVIDE ADDITIONAL PAVED SURFACE WIDTH
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (6)
E
Engineer's Estimate
$2,104,517.25
$2,328,204.18
Over/Under Est: 10.63% $223,686.93
$2,579,868.44
Over/Under Est: 22.59% $475,351.19
Amt Left: 10.81% $251,664.26
$2,740,963.67
Over/Under Est: 30.24% $636,446.42
Amt Left: 17.73% $412,759.49
Delta: -6.24% -$161,095.23
Over/Under Est: 31.63% $665,756.05
Amt Left: 18.99% $442,069.12
Delta: -1.07% -$29,309.63
$3,085,717.00
Over/Under Est: 46.62% $981,199.75
Amt Left: 32.54% $757,512.82
Delta: -11.39% -$315,443.70
Over/Under Est: 48.12% $1,012,660.82
Amt Left: 33.89% $788,973.89
Delta: -1.02% -$31,461.07

Bid Items & Bid Tabulations

70 Total 0 of 70
CLAY  |  FM 174  |  WICHITA FALLS  |  0137-10-022  |  02/05/2019  |  $2,104,517.25  |  STP 2019(504)HES  |  PROVIDE ADDITIONAL PAVED SURF WIDTH  |  170 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
BLYTHE CONSTRUCTION, INC.
JAGOE-PUBLIC COMPANY
A. L. HELMCAMP, INC.
AUSTIN BRIDGE & ROAD SERVICES, LP
FNH CONSTRUCTION, LLC
TEXAS MATERIALS GROUP, INC.
PREPARING ROW
STA 7.000 $2,000.000 $3,000.000 $12,000.000 $4,000.000 $12,500.000 $15,000.000 $0.010
EXCAVATION (ROADWAY)
CY 1,547.000 $10.000 $24.000 $8.500 $19.000 $20.000 $20.000 $15.000
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 7,253.000 $20.000 $17.500 $19.000 $27.000 $23.000 $30.000 $22.000
BROADCAST SEED (TEMP) (WARM)
SY 20,263.000 $0.100 $0.100 $0.150 $0.120 $0.140 $1.000 $0.150
BROADCAST SEED (TEMP) (COOL)
SY 20,263.000 $0.100 $0.110 $0.150 $0.120 $0.140 $1.000 $0.150
DRILL SEEDING (PERM) (RURAL) (CLAY)
SY 40,528.000 $0.100 $0.150 $0.190 $0.150 $0.180 $1.000 $0.200
VEGETATIVE WATERING
MG 342.000 $25.000 $30.000 $65.000 $22.000 $52.000 $50.000 $52.000
CEMENT
TON 241.000 $155.000 $145.000 $107.000 $170.000 $190.000 $185.000 $165.000
CEMENT TREAT (SUBGRADE) (8")
SY 22,391.000 $3.000 $4.000 $4.500 $7.000 $2.850 $4.500 $6.000
EMULS ASPH (EROSN CONT)(SS-1)
GAL 4,862.000 $2.750 $2.000 $3.150 $4.000 $2.850 $6.000 $4.500
D-GR HMA(SQ) TY-B PG64-22
TON 4,460.000 $75.000 $63.000 $71.500 $88.000 $78.000 $92.500 $95.000
D-GR HMA TY-D PG 70-22 (LEVEL-UP)
TON 613.000 $70.000 $100.000 $98.000 $110.000 $105.000 $110.000 $110.000
SUPERPAVE MIXTURES SP-D PG70-22
TON 6,415.000 $80.000 $80.000 $84.500 $93.000 $89.000 $95.000 $110.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
SY 1,100.000 $40.000 $47.000 $49.000 $50.000 $65.000 $65.000 $63.000
PLANE ASPH CONC PAV(0" TO 2")
SY 1,244.000 $3.000 $3.000 $6.840 $4.000 $6.000 $10.000 $5.000
CEM STABIL BKFL
CY 157.000 $150.000 $190.000 $157.890 $120.000 $150.000 $250.000 $115.000
CUT & RESTORING PAV
SY 151.000 $100.000 $85.000 $85.910 $140.000 $85.000 $150.000 $135.000
TRENCH EXCAVATION PROTECTION
LF 145.000 $20.000 $10.000 $15.790 $16.000 $15.000 $3.000 $16.000
TEMPORARY SPL SHORING
SF 329.000 $20.000 $85.000 $73.680 $45.000 $85.000 $40.000 $43.000
RIPRAP (CONC)(4 IN)
CY 10.000 $400.000 $690.000 $473.670 $560.000 $650.000 $550.000 $600.000
RIPRAP (STONE COMMON)(DRY)(18 IN)
CY 23.000 $130.000 $265.000 $231.570 $230.000 $310.000 $185.000 $215.000
CMP (GAL STL 18 IN)
LF 24.000 $60.000 $53.000 $57.890 $56.000 $55.000 $85.000 $52.000
CONC BOX CULV (8 FT X 4 FT)
LF 112.000 $600.000 $960.000 $710.500 $800.000 $700.000 $850.000 $760.000
CONC BOX CULV (6 FT X 6 FT)(EXTEND)
LF 237.000 $450.000 $615.000 $605.240 $560.000 $600.000 $750.000 $545.000
RC PIPE (CL III)(24 IN)
LF 50.000 $100.000 $96.000 $84.210 $130.000 $80.000 $95.000 $125.000
RC PIPE (CL III)(42 IN)
LF 242.000 $150.000 $245.000 $210.520 $250.000 $200.000 $350.000 $235.000
HEADWALL (CH - PW - 0) (DIA= 42 IN)
EA 4.000 $6,500.000 $5,250.000 $6,841.890 $8,500.000 $7,500.000 $8,500.000 $7,700.000
HEADWALL (CH - PW - S) (DIA= 42 IN)
EA 2.000 $8,500.000 $5,500.000 $8,947.090 $9,500.000 $9,500.000 $9,500.000 $8,800.000
WINGWALL (PW - 2) (HW=5 FT)
EA 2.000 $9,000.000 $6,225.000 $8,420.790 $6,700.000 $8,500.000 $7,500.000 $6,300.000
WINGWALL (PW - 2) (HW=7 FT)
EA 6.000 $11,500.000 $9,700.000 $15,788.980 $13,500.000 $16,000.000 $10,000.000 $12,250.000
SET (TY II) (18 IN) (CMP) (6: 1) (P)
EA 12.000 $950.000 $1,175.000 $999.970 $900.000 $950.000 $1,850.000 $825.000
SET (TY II) (24 IN) (CMP) (6: 1) (P)
EA 4.000 $1,000.000 $1,500.000 $1,105.230 $1,100.000 $1,050.000 $2,000.000 $965.000
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 1.000 $1,000.000 $1,275.000 $999.970 $1,000.000 $950.000 $2,100.000 $915.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 2.000 $1,200.000 $1,500.000 $1,052.600 $1,200.000 $1,000.000 $2,500.000 $1,050.000
CLEAN EXIST CULVERTS
CY 55.000 $100.000 $85.000 $105.260 $50.000 $100.000 $100.000 $45.000
REMOV STR (PIPE)
LF 401.000 $20.000 $10.650 $10.530 $30.000 $10.000 $50.000 $32.000
MOBILIZATION
LS 1.000 $186,515.000 $185,000.000 $255,000.000 $260,000.000 $275,000.000 $200,000.000 $301,061.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 10.000 $5,000.000 $12,000.000 $9,000.000 $8,500.000 $20,000.000 $8,500.000 $34,900.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 1,500.000 $25.000 $32.000 $34.550 $35.000 $32.820 $30.000 $33.000
ROCK FILTER DAMS (REMOVE)
LF 1,500.000 $7.000 $10.000 $12.370 $4.000 $11.750 $15.000 $12.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,660.000 $3.000 $1.950 $3.040 $3.500 $2.890 $4.000 $3.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,660.000 $1.000 $0.900 $0.760 $1.000 $0.720 $2.000 $0.750
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 1,880.000 $2.750 $2.050 $3.220 $5.000 $3.060 $15.000 $3.150
BIODEG EROSN CONT LOGS (REMOVE)
LF 1,880.000 $0.750 $0.500 $0.550 $1.000 $0.520 $9.000 $0.550
INTERSECTIONS (ACP)
SY 180.000 $25.000 $34.000 $28.500 $58.000 $22.500 $42.000 $60.000
DRIVEWAYS (ACP)
SY 187.000 $25.000 $38.000 $25.500 $56.000 $70.000 $42.000 $60.000
TURNOUTS (ACP)
SY 138.000 $40.000 $34.000 $29.250 $45.000 $58.000 $42.000 $60.000
DRIVEWAYS (BASE)
SY 1,177.000 $20.000 $14.000 $32.000 $25.000 $23.000 $25.000 $34.000
RUMBLE STRIPS (SHOULDER)
LF 36,476.000 $0.350 $0.200 $0.320 $0.200 $0.180 $0.500 $0.150
RUMBLE STRIPS (CENTERLINE)
LF 18,238.000 $0.350 $0.200 $0.530 $0.200 $0.180 $0.500 $0.150
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 5.000 $250.000 $220.000 $365.680 $250.000 $220.000 $650.000 $230.000
MAILBOX INSTALL-D (TWW-POST) TY 4
EA 1.000 $300.000 $265.000 $413.050 $290.000 $265.000 $650.000 $275.000
MAILBOX INSTALL-M (TWW-POST) TY 4
EA 1.000 $500.000 $610.000 $776.200 $680.000 $610.000 $650.000 $630.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 4.000 $700.000 $505.000 $531.560 $555.000 $505.000 $650.000 $515.000
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 21.000 $450.000 $335.000 $352.620 $370.000 $335.000 $650.000 $350.000
IN SM RD SN SUP&AM TYTWT(1)WS(T)
EA 8.000 $400.000 $410.000 $431.570 $450.000 $410.000 $650.000 $435.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 5.000 $425.000 $350.000 $368.410 $390.000 $350.000 $500.000 $360.000
RELOCATE SM RD SN SUP&AM TY TWT
EA 2.000 $350.000 $275.000 $289.470 $300.000 $275.000 $500.000 $285.000
REMOVE SM RD SN SUP&AM
EA 21.000 $75.000 $75.000 $78.940 $85.000 $75.000 $50.000 $78.000
INSTL DEL ASSM (D-SW)SZ 1(FLX)GND(BI)
EA 12.000 $100.000 $175.000 $184.210 $200.000 $175.000 $100.000 $182.000
INSTL OM ASSM (OM-2Z)(FLX)GND
EA 2.000 $65.000 $175.000 $184.210 $200.000 $175.000 $100.000 $182.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 1,884.000 $0.750 $1.500 $1.000 $0.750 $1.250 $5.000 $1.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 12.000 $15.000 $20.600 $25.260 $23.000 $24.000 $20.000 $22.000
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 36,475.000 $0.300 $0.400 $0.470 $0.450 $0.450 $0.500 $0.500
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 2,644.000 $0.300 $0.400 $0.470 $0.450 $0.450 $0.500 $0.600
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 21,830.000 $0.300 $0.400 $0.470 $0.450 $0.450 $0.500 $0.500
REFL PAV MRKR TY II-A-A
EA 405.000 $2.750 $3.000 $9.470 $3.500 $9.000 $15.000 $5.300
PREFORMED IN-LANE(TRANS) RUMBLE STRIP
LF 80.000 $3.000 $20.000 $15.790 $23.000 $15.000 $10.000 $26.000
TMA (STATIONARY)
DAY 170.000 $100.000 $300.000 $390.000 $250.000 $225.000 $350.000 $278.000
TMA (MOBILE OPERATION)
HR 144.000 $45.000 $90.000 $116.000 $60.000 $95.000 $150.000 $55.000
Totals: $2,104,517.250 $2,328,204.180 $2,579,868.440 $2,740,963.670 $2,770,273.300 $3,085,717.000 $3,117,178.070