CHEROKEE US 79 (0206-03-061)

Items: 116

County: CHEROKEE
Length: N/A
Highway: US 79
District: TYLER
Control Number: 0206-03-061
DBE Goal: N/A
Project: NH 1802(198)
Guaranty: N/A
Time: 224 WORKING DAYS
Engineer's Estimate: $8,246,557.47
Date: 06/06/2018 (7 years ago)
Contract Number: N/A
Type: FLX BS,LVL-UP,OCST,HMAC,STRS,PV MRK
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (5)
E
Engineer's Estimate
$8,246,557.47
Over/Under Est: 0.13% $10,748.76
$8,631,614.44
Over/Under Est: 4.67% $385,056.97
Amt Left: 4.53% $374,308.21
Over/Under Est: 6.17% $509,011.75
Amt Left: 6.03% $498,262.99
Delta: -1.44% -$123,954.78
Over/Under Est: 6.91% $570,000.50
Amt Left: 6.77% $559,251.74
Delta: -0.70% -$60,988.75
$9,034,278.23
Over/Under Est: 9.55% $787,720.76
Amt Left: 9.41% $776,972.00
Delta: -2.47% -$217,720.26

Bid Items & Bid Tabulations

116 Total 0 of 116
CHEROKEE  |  US 79  |  TYLER  |  0206-03-061  |  06/06/2018  |  $8,246,557.47  |  NH 1802(198)  |  FLX BS,LVL-UP,OCST,HMAC,STRS,PV MRK  |  224 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
DREWERY CONSTRUCTION COMPANY, INCORPORATED
A. L. HELMCAMP, INC.
EAST TEXAS BRIDGE, INC.
LONGVIEW BRIDGE AND ROAD, LTD.
B & E CONSTRUCTION INC
PREPARING ROW
AC 0.180 $30,000.000 $6,000.000 $20,000.000 $15,000.000 $42,000.000 $2,900.000
PREPARING ROW
STA 279.200 $500.000 $200.000 $200.000 $600.000 $350.000 $1,100.000
REMOVING CONC (DRIVEWAYS)
SY 87.000 $18.000 $40.000 $30.000 $15.000 $30.000 $14.500
REMOVING CONCRETE(MOW STRIP)
LF 705.000 $6.000 $8.000 $15.000 $10.000 $11.000 $10.500
EXCAVATION (ROADWAY)
CY 3,188.000 $12.000 $5.500 $12.000 $5.000 $8.750 $6.500
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 8,470.000 $17.500 $25.000 $8.000 $8.000 $7.250 $9.500
BACKFILL (TY C)
STA 461.350 $14.000 $190.000 $100.000 $230.000 $195.000 $225.000
COMPOST MANUF TOPSOIL (4")
SY 116,120.000 $2.000 $1.000 $0.900 $1.000 $1.950 $0.900
STRAW/HAY MLCH SEED(PERM)(RURAL)(SANDY)
SY 30,946.000 $0.220 $0.330 $0.250 $0.300 $0.350 $0.280
STRAW/HAY MLCH SEED(TEMP)(WARM)
SY 15,473.000 $0.400 $0.340 $0.250 $0.300 $0.350 $0.280
STRAW/HAY MLCH SEED(TEMP)(COOL)
SY 15,473.000 $0.400 $0.310 $0.250 $0.300 $0.330 $0.280
BOND FBR MTRX SEED (PERM)(RURAL)(SAND)
SY 85,175.000 $0.900 $0.850 $1.000 $0.900 $0.900 $0.860
BONDED FBR MTRX SEED (TEMP)(WARM)
SY 42,587.000 $0.700 $0.780 $1.000 $0.850 $0.800 $0.860
BONDED FBR MTRX SEED (TEMP)(COOL)
SY 42,587.000 $0.700 $0.760 $1.000 $0.850 $0.800 $0.860
VEGETATIVE WATERING
MG 2,555.000 $10.000 $10.000 $10.000 $10.000 $1.000 $13.500
SOIL RETENTION BLANKETS (CL 1) (TY B)
SY 85,175.000 $1.000 $1.250 $1.000 $0.920 $1.250 $0.950
LIME (HYDRATED LIME (DRY))
TON 164.000 $170.000 $153.000 $165.000 $200.000 $180.000 $180.000
LIME TRT (EXST MATL)(8")
SY 9,956.000 $3.000 $3.500 $6.000 $5.000 $1.750 $3.750
CEMENT
TON 164.000 $145.000 $150.000 $165.000 $160.000 $170.000 $150.000
CEMENT TREAT(EXIST MATL)(8")
SY 9,956.000 $3.000 $3.000 $8.000 $4.000 $1.550 $2.350
EMULS ASPH (EROSN CONT)(CSS-1H)
GAL 3,569.000 $2.750 $2.500 $4.000 $6.000 $3.800 $4.500
ASPH (AC-20XP, AC-10-2TR, OR AC-20-5TR)
GAL 122,061.000 $3.250 $2.600 $3.000 $3.000 $3.150 $2.600
AGGR (TY-PD GR-3 OR TY-PL GR-3)
CY 2,906.000 $110.000 $110.000 $85.000 $120.000 $120.000 $130.000
D-GR HMA(SQ) TY-D PG64-22
TON 999.000 $155.000 $150.000 $110.000 $150.000 $100.000 $150.000
PFC (ASPHALT) PG76-22
TON 1,282.000 $145.000 $0.010 $136.000 $130.000 $130.000 $140.000
PFC-C (AGGREGATE)(PG76 MIX) SAC-A
TON 20,081.000 $105.000 $124.000 $136.000 $130.000 $130.000 $140.000
SUPERPAVE MIXTURES SP-B PG64-22
TON 9,293.000 $90.000 $96.000 $105.000 $97.000 $95.000 $128.000
SUPERPAVE MIXTURES SP-D PG64-22(LEV-UP)
TON 11,809.000 $100.000 $98.000 $98.000 $101.000 $95.000 $105.530
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
SY 1,000.000 $75.000 $48.000 $42.000 $50.000 $60.000 $1.050
PLANE ASPH CONC PAV(0" TO 2")
SY 73,146.000 $1.500 $2.000 $1.250 $2.500 $2.350 $2.000
PLANE ASPH CONC PAV (0" TO 1 1/2")
SY 10,236.000 $1.200 $2.000 $1.650 $2.500 $2.150 $2.000
PLANE ASPH CONC PAV (0"- 2 1/2")
SY 5,085.000 $1.900 $2.000 $1.700 $3.000 $2.550 $1.900
PAV JT UNDERSEAL (24")
LF 677.000 $30.000 $17.000 $45.000 $37.000 $42.000 $28.000
CL C CONC (RAIL FOUNDATION)
CY 70.000 $350.000 $760.000 $1,200.000 $650.000 $575.000 $445.000
CL C CONC (COLLAR)
EA 1.000 $1,400.000 $1,000.000 $4,000.000 $1,000.000 $1,000.000 $685.000
RIPRAP (CONC)(5 IN)
CY 111.000 $425.000 $500.000 $470.000 $425.000 $425.000 $330.000
RIPRAP (STONE COMMON)(DRY)(18 IN)
CY 28.000 $145.000 $200.000 $250.000 $200.000 $200.000 $128.000
RIPRAP (MOW STRIP)(4 IN)
CY 178.000 $400.000 $525.000 $520.000 $450.000 $450.000 $400.000
CLEANING AND SEALING EXISTING JOINTS
LF 677.000 $12.000 $25.000 $28.000 $35.000 $38.000 $36.000
CLEANING AND SEALING JOINTS (CL 3)
LF 542.000 $35.000 $18.000 $28.000 $28.000 $33.000 $25.000
RAIL (TY T552)
LF 496.000 $50.000 $125.000 $123.000 $80.000 $75.000 $71.000
RC PIPE (CL III)(18 IN)
LF 397.000 $50.000 $50.000 $52.000 $42.000 $40.000 $47.000
RC PIPE (CL III)(24 IN)
LF 58.000 $70.000 $105.000 $85.000 $52.000 $60.000 $68.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 16.000 $858.000 $800.000 $500.000 $575.000 $600.000 $600.000
SET (TY II) (24 IN) (RCP) (3: 1) (C)
EA 1.000 $1,200.000 $950.000 $530.000 $600.000 $650.000 $750.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 2.000 $950.000 $1,050.000 $780.000 $925.000 $950.000 $1,100.000
MOBILIZATION
LS 1.000 $760,000.000 $500,000.000 $560,000.000 $550,000.000 $850,000.000 $434,960.870
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 14.000 $5,000.000 $5,500.000 $7,500.000 $7,000.000 $2,600.000 $6,500.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 1,560.000 $28.000 $26.000 $25.000 $28.000 $29.000 $25.500
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 740.000 $35.000 $30.000 $30.000 $32.000 $32.000 $29.500
ROCK FILTER DAMS (REMOVE)
LF 2,300.000 $8.000 $13.000 $4.000 $2.000 $14.000 $10.500
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 780.000 $25.000 $27.000 $10.000 $32.000 $28.000 $22.000
CONSTRUCTION EXITS (REMOVE)
SY 780.000 $15.000 $14.000 $2.000 $2.000 $15.000 $10.500
EARTHWORK (EROSN & SEDMT CONT, IN VEH)
CY 1,000.000 $25.000 $16.000 $11.000 $30.000 $12.000 $15.750
BACKHOE WORK (EROSION & SEDMT CONT)
HR 100.000 $65.000 $120.000 $65.000 $75.000 $125.000 $72.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 10,335.000 $3.000 $3.300 $4.000 $3.500 $2.850 $2.900
TEMP SEDMT CONT FENCE (REMOVE)
LF 10,335.000 $1.000 $1.000 $2.000 $0.500 $1.100 $1.000
TRACKHOE WORK (EROSION & SEDMT CONT)
HR 100.000 $120.000 $175.000 $85.000 $125.000 $125.000 $150.000
PORT CTB (DES SOURCE) (SAFETY SH)(TY 2)
LF 750.000 $4.500 $17.000 $22.000 $12.000 $12.000 $18.000
PORT CTB (STKPL)(SAFETY SH)
LF 750.000 $5.250 $17.000 $22.000 $12.000 $12.000 $10.500
INTERSECTIONS (ACP)
SY 1,147.000 $40.000 $37.010 $40.000 $30.000 $28.000 $45.000
DRIVEWAYS (ACP)
SY 2,589.000 $30.000 $43.000 $40.000 $30.000 $26.000 $45.000
TURNOUTS (ACP)
SY 187.000 $35.000 $39.000 $60.000 $30.000 $33.000 $45.000
DRIVEWAYS (CONC) (HES)
SY 87.000 $90.000 $150.000 $100.000 $100.000 $94.000 $73.000
RUMBLE STRIPS (SHOULDER)
LF 92,300.000 $0.350 $0.170 $0.140 $0.120 $0.120 $0.150
RUMBLE STRIPS (CENTERLINE)
LF 46,150.000 $0.350 $0.200 $0.140 $0.120 $0.120 $0.150
MTL W-BEAM GD FEN (TIM POST)
LF 1,575.000 $25.000 $21.000 $19.000 $22.000 $19.800 $21.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 10.000 $1,600.000 $1,400.000 $1,500.000 $1,800.000 $1,550.000 $1,401.750
MTL BEAM GD FEN TRANS (T101)
EA 4.000 $1,200.000 $1,200.000 $1,100.000 $1,200.000 $1,115.000 $1,155.000
REMOVE METAL BEAM GUARD FENCE
LF 1,575.000 $3.000 $10.500 $2.000 $11.000 $2.200 $10.500
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 8.000 $500.000 $210.000 $260.000 $250.000 $275.000 $210.000
RM MTL BM GD FEN TRANS (T101)
EA 4.000 $200.000 $210.000 $260.000 $250.000 $275.000 $210.000
GUARDRAIL END TREATMENT (INSTALL)
EA 14.000 $2,500.000 $2,350.000 $2,500.000 $2,500.000 $2,550.000 $2,362.500
GUARDRAIL END TREATMENT (REMOVE)
EA 12.000 $350.000 $210.000 $260.000 $250.000 $275.000 $210.000
CRASH CUSH ATTEN (INSTL)
EA 2.000 $11,000.000 $9,700.000 $15,000.000 $10,000.000 $14,000.000 $9,660.000
CRASH CUSH ATTEN (REMOVE)
EA 2.000 $1,760.000 $1,100.000 $2,500.000 $1,500.000 $1,200.000 $1,050.000
MAILBOX INSTALL-S (TWG-POST) TY 2
EA 46.000 $215.000 $300.000 $230.000 $300.000 $310.000 $69.000
MAILBOX INSTALL-D (TWG-POST) TY 2
EA 11.000 $300.000 $365.000 $250.000 $400.000 $380.000 $79.000
MAILBOX INSTALL-M (TWG-POST) TY 2
EA 1.000 $450.000 $480.000 $310.000 $500.000 $500.000 $153.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 14.000 $475.000 $568.000 $490.000 $600.000 $595.000 $79.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 11.000 $525.000 $775.000 $620.000 $800.000 $800.000 $164.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T-2EXT)
EA 2.000 $670.000 $735.000 $830.000 $800.000 $770.000 $120.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 1.000 $620.000 $750.000 $700.000 $800.000 $785.000 $122.000
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 3.000 $525.000 $770.000 $620.000 $800.000 $810.000 $175.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 6.000 $630.000 $900.000 $750.000 $900.000 $935.000 $231.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 1.000 $775.000 $815.000 $670.000 $800.000 $850.000 $105.000
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
EA 1.000 $850.000 $1,000.000 $920.000 $1,100.000 $1,050.000 $208.000
IN SM RD SN SUP&AM TYS80(2)SA(P-EXAL)
EA 2.000 $1,750.000 $1,450.000 $1,600.000 $1,500.000 $1,500.000 $1,650.000
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 78.000 $340.000 $425.000 $300.000 $500.000 $445.000 $65.000
IN SM RD SN SUP&AM TYTWT(1)WS(T)
EA 1.000 $500.000 $510.000 $400.000 $500.000 $530.000 $98.000
REMOVE SM RD SN SUP&AM
EA 107.000 $75.000 $100.000 $80.000 $100.000 $105.000 $70.000
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
EA 19.000 $30.000 $15.750 $42.000 $30.000 $26.000 $4.000
INSTL OM ASSM (OM-2Z)(FLX)GND
EA 12.000 $60.000 $47.250 $130.000 $55.000 $85.000 $20.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 29.000 $30.000 $21.000 $60.000 $30.000 $32.000 $7.000
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
LF 9,887.000 $0.200 $0.130 $0.130 $0.140 $0.130 $0.350
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 101,435.000 $0.250 $0.130 $0.130 $0.140 $0.130 $0.200
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 24,332.000 $0.200 $0.130 $0.130 $0.140 $0.130 $0.200
WK ZN PAV MRK REMOV (W)4"(BRK)
LF 9,887.000 $0.750 $1.000 $1.060 $1.000 $1.400 $1.100
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 24,332.000 $0.600 $1.000 $1.060 $1.000 $1.400 $0.550
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 5,202.000 $0.750 $1.000 $0.460 $2.000 $1.200 $0.800
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
LF 978.000 $0.350 $1.050 $1.050 $1.100 $1.400 $1.250
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 150.000 $2.000 $1.050 $1.050 $1.100 $1.100 $0.850
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 356.000 $3.000 $5.780 $5.780 $6.000 $6.050 $6.000
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 10,220.000 $0.350 $0.530 $0.530 $0.550 $0.550 $0.300
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 102,230.000 $0.350 $0.400 $0.400 $0.420 $0.420 $0.310
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 2,062.000 $0.350 $0.530 $0.530 $0.550 $0.550 $0.300
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 96,723.000 $0.350 $0.400 $0.400 $0.420 $0.420 $0.280
PREFAB PAV MRK TY C (W) (ARROW)
EA 8.000 $200.000 $189.000 $189.000 $220.000 $200.000 $200.000
PREFAB PAV MRK TY C (W) (WORD)
EA 2.000 $255.000 $262.500 $262.500 $300.000 $275.000 $265.000
PREFAB PAV MRK TY C (W) (RR XING)
EA 1.000 $525.000 $787.500 $787.500 $800.000 $825.000 $545.000
REFL PAV MRKR TY I-A
EA 196.000 $2.500 $3.360 $3.360 $4.000 $3.500 $3.800
REFL PAV MRKR TY I-C
EA 591.000 $2.500 $3.360 $3.360 $4.000 $3.500 $3.100
REFL PAV MRKR TY II-A-A
EA 1,465.000 $2.500 $3.360 $3.360 $4.000 $3.500 $3.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 100.000 $125.000 $125.000 $200.000 $150.000 $80.000 $75.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $10,000.000 $10,000.000 $5,000.000 $15,000.000 $15,000.000 $9,400.000
TMA (STATIONARY)
EA 2.000 $10,000.000 $7,000.000 $15,000.000 $25,000.000 $15,000.000 $12,800.000
Totals: $8,246,557.470 $8,257,306.230 $8,631,614.440 $8,755,569.220 $8,816,557.970 $9,034,278.230