CHEROKEE SH 21 (0118-04-032)

Items: 110

County: CHEROKEE
Length: N/A
Highway: SH 21
District: TYLER
Control Number: 0118-04-032
DBE Goal: N/A
Project: F 2021(822)
Guaranty: N/A
Time: 182 WORKING DAYS
Engineer's Estimate: $6,306,253.86
Date: 08/05/2021 (4 years ago)
Contract Number: N/A
Type: SURFACING/ROADWAY RESTORATION
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Documents:
Bidders (6)
E
Engineer's Estimate
$6,306,253.86
$5,923,688.84
Over/Under Est: -6.07% -$382,565.02
Over/Under Est: -5.38% -$339,339.04
Amt Left: 0.73% $43,225.98
Over/Under Est: -4.79% -$302,203.37
Amt Left: 1.36% $80,361.65
Delta: -0.62% -$37,135.67
Over/Under Est: -1.15% -$72,681.12
Amt Left: 5.23% $309,883.90
Delta: -3.82% -$229,522.25
Over/Under Est: 9.04% $570,344.88
Amt Left: 16.09% $952,909.90
Delta: -10.32% -$643,026.00
Over/Under Est: 18.05% $1,138,318.78
Amt Left: 25.67% $1,520,883.80
Delta: -8.26% -$567,973.90
Subcontractor Percentage Amount
A R BROTHERS CONSTRUCTION SERVICES, INC. 11.79% $823,794.28
AMERICAN REMEDIATION OPTIONS, INC. 4.97% $347,265.27
HOUSTON CONST TODAY INC 2.82% $197,039.85
STRIPE-A-ZONE, LLC 1.54% $107,603.32
DUSTIN ALLEN, INC. 0.99% $69,173.57
COLD CREEK CONSTRUCTION, LTD 0.63% $44,019.54
AREA WIDE PROTECTIVE, INC. 0.28% $19,564.24
Total: 23.02% $1,608,460.07

Bid Items & Bid Tabulations

110 Total 0 of 110
CHEROKEE  |  SH 21  |  TYLER  |  0118-04-032  |  08/05/2021  |  $6,306,253.86  |  F 2021(822)  |  SURF/ROADWAY RESTOR  |  182 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
A. L. HELMCAMP, INC.
MADDEN CONTRACTING COMPANY, LLC.
BIG CREEK CONSTRUCTION, LTD.
MOORE BROTHERS CONSTRUCTION COMPANY
DREWERY CONSTRUCTION COMPANY, INCORPORATED
LONGVIEW BRIDGE AND ROAD, LTD.
PREPARING ROW
AC 2.000 $20,100.000 $35,000.000 $22,000.000 $25,000.000 $25,000.000 $20,000.000 $8,500.000
REMOVING CONC (DRIVEWAYS)
SY 1,314.000 $17.000 $18.000 $13.000 $16.000 $14.300 $14.000 $25.000
SUBGRADE WIDENING (ORD COMP)
STA 355.000 $289.000 $160.000 $225.000 $500.000 $191.490 $500.000 $225.000
EMBANKMENT (VEHICLE)(ORD COMP)(TY C)
CY 1,840.000 $22.000 $21.000 $25.000 $15.000 $27.500 $30.000 $18.000
BACKFILL (TY A)
STA 341.000 $275.000 $180.000 $191.000 $200.000 $275.660 $190.000 $260.000
BACKFILL (TY B)
STA 14.000 $163.000 $250.000 $210.000 $175.000 $250.000 $230.000 $500.000
BLADING
STA 355.000 $109.000 $180.000 $100.000 $140.000 $125.000 $155.000 $325.000
FURNISHING AND PLACING TOPSOIL (4")
SY 157,818.000 $1.430 $0.400 $0.950 $0.500 $1.150 $2.000 $1.750
BROADCAST SEED (PERM) (RURAL) (SANDY)
SY 78,909.000 $0.150 $0.130 $0.110 $0.200 $0.200 $0.200 $0.200
BOND FBR MTRX SEED (PERM)(RURAL)(SAND)
SY 157,818.000 $0.610 $0.670 $0.650 $0.700 $0.750 $0.700 $0.750
BONDED FBR MTRX SEED (TEMP)(WARM)
SY 78,909.000 $0.600 $0.660 $0.640 $0.700 $0.730 $0.700 $0.740
BONDED FBR MTRX SEED (TEMP)(COOL)
SY 78,909.000 $0.580 $0.650 $0.630 $0.700 $0.720 $0.700 $0.740
VEGETATIVE WATERING
MG 3,472.000 $3.320 $1.000 $9.000 $7.000 $10.000 $10.000 $2.000
ASPH (AC-20XP, AC-10-2TR, OR AC-20-5TR)
GAL 57,447.000 $3.170 $3.300 $3.440 $3.000 $2.990 $3.400 $4.000
AGGR (TY-PD GR-3 OR TY-PL GR-3)
CY 1,368.000 $114.000 $110.000 $150.000 $110.000 $138.000 $138.000 $190.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
SY 5,000.000 $55.000 $47.000 $44.000 $40.000 $56.390 $52.000 $55.000
PLANE ASPH CONC PAV(0" TO 2")
SY 2,667.000 $4.810 $6.000 $3.850 $1.250 $4.770 $6.800 $4.250
PLANE ASPH CONC PAV (2")
SY 22,161.000 $1.500 $2.500 $2.250 $1.500 $1.860 $3.400 $2.750
FLOWABLE BACKFILL
CY 76.000 $226.000 $220.000 $185.000 $210.000 $239.000 $195.000 $280.000
TRENCH EXCAVATION PROTECTION
LF 40.000 $2.000 $13.000 $6.000 $12.500 $7.750 $6.300 $34.000
TEMPORARY SPL SHORING
SF 800.000 $20.000 $16.000 $35.000 $15.500 $40.500 $68.000 $48.000
CL C CONC (COLLAR)
EA 26.000 $635.000 $650.000 $600.000 $625.000 $550.000 $630.000 $1,800.000
CL E CONC (SEAL SLAB)(NON-REINF)
CY 6.000 $850.000 $480.000 $300.000 $475.000 $550.000 $1,800.000 $675.000
RIPRAP (CONC)(5 IN)
CY 8.000 $495.000 $580.000 $600.000 $565.000 $550.000 $1,100.000 $850.000
RIPRAP (STONE COMMON)(DRY)(12 IN)
CY 197.000 $136.000 $85.000 $130.000 $85.000 $220.000 $175.000 $230.000
RIPRAP (MOW STRIP)(4 IN)
CY 21.000 $426.000 $580.000 $400.000 $570.000 $550.000 $420.000 $625.000
CONC BOX CULV (3 FT X 2 FT)(EXTEND)
LF 32.000 $195.000 $480.000 $450.000 $470.000 $550.000 $860.000 $595.000
CONC BOX CULV (5 FT X 3 FT)(EXTEND)
LF 13.000 $325.000 $650.000 $500.000 $625.000 $550.000 $1,700.000 $750.000
CONC BOX CULV (8 FT X 8 FT)(EXTEND)
LF 21.000 $644.000 $790.000 $950.000 $770.000 $550.000 $2,400.000 $1,050.000
RC PIPE (CL III)(18 IN)
LF 1,560.000 $40.000 $48.000 $39.450 $47.000 $51.750 $41.000 $60.000
RC PIPE (CL III)(24 IN)
LF 879.000 $71.000 $93.000 $55.000 $92.000 $71.500 $58.000 $75.000
RC PIPE (CL III)(30 IN)
LF 40.000 $85.000 $134.000 $85.000 $135.000 $121.000 $90.000 $120.000
RC PIPE (CL III)(36 IN)
LF 77.000 $100.000 $220.000 $120.000 $210.000 $193.000 $126.000 $135.000
RC PIPE (CL III)(54 IN)
LF 4.000 $218.000 $470.000 $240.000 $475.000 $285.000 $252.000 $385.000
HEADWALL (CH - FW - 0) (DIA= 30 IN)
EA 2.000 $5,072.000 $4,500.000 $5,200.000 $4,200.000 $6,600.000 $5,500.000 $6,000.000
HEADWALL (CH - FW - 0) (DIA= 36 IN)
EA 3.000 $6,120.000 $5,300.000 $5,600.000 $5,200.000 $9,900.000 $6,000.000 $6,500.000
HEADWALL (CH - FW - 15) (DIA= 30 IN)
EA 3.000 $5,500.000 $4,300.000 $5,300.000 $4,200.000 $7,750.000 $5,600.000 $6,500.000
HEADWALL (CH - FW - 15) (DIA= 36 IN)
EA 2.000 $6,100.000 $6,400.000 $5,800.000 $6,200.000 $8,050.000 $6,100.000 $7,700.000
HEADWALL (CH - FW - 15) (DIA= 54 IN)
EA 1.000 $7,500.000 $8,500.000 $9,100.000 $8,200.000 $11,420.000 $9,600.000 $9,700.000
WINGWALL (FW - S) (HW=3 FT)
EA 4.000 $10,084.000 $3,200.000 $8,450.000 $3,200.000 $5,675.000 $9,800.000 $8,800.000
WINGWALL (FW - S) (HW=4 FT)
EA 2.000 $14,420.000 $4,300.000 $14,000.000 $4,200.000 $7,370.000 $15,000.000 $9,000.000
WINGWALL (PW - 2) (HW=9 FT)
EA 2.000 $32,300.000 $19,000.000 $30,000.000 $18,500.000 $23,000.000 $37,000.000 $20,000.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 144.000 $595.000 $800.000 $634.750 $775.000 $699.000 $665.000 $750.000
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 2.000 $808.000 $900.000 $750.000 $875.000 $885.000 $790.000 $885.000
SET (TY II) (24 IN) (RCP) (6: 1) (C)
EA 1.000 $1,100.000 $950.000 $955.000 $950.000 $1,100.000 $1,000.000 $1,100.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 26.000 $920.000 $950.000 $955.000 $950.000 $1,100.000 $1,000.000 $1,100.000
CLEAN EXIST CULVERTS
EA 30.000 $1,068.000 $1,100.000 $970.000 $1,050.000 $620.000 $745.000 $1,500.000
REMOV STR (PIPE)
EA 84.000 $320.000 $530.000 $190.000 $525.000 $220.000 $200.000 $300.000
MOBILIZATION
LS 1.000 $467,123.000 $400,000.000 $282,500.000 $600,000.000 $365,000.000 $150,000.000 $650,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 12.000 $4,500.000 $7,500.000 $2,000.000 $5,000.000 $3,900.000 $12,700.000 $3,500.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 1,160.000 $31.000 $28.000 $27.000 $28.000 $32.500 $31.000 $32.500
ROCK FILTER DAMS (REMOVE)
LF 1,160.000 $10.000 $8.000 $8.000 $5.000 $8.800 $8.400 $8.800
EARTHWORK (EROSN & SEDMT CONT, IN VEH)
CY 100.000 $18.000 $22.000 $22.000 $45.000 $50.000 $28.000 $33.000
BACKHOE WORK (EROSION & SEDMT CONT)
HR 100.000 $73.000 $60.000 $82.500 $125.000 $175.000 $190.000 $150.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 5,800.000 $2.500 $2.900 $2.750 $2.500 $2.920 $2.800 $2.900
TEMP SEDMT CONT FENCE (REMOVE)
LF 5,800.000 $0.700 $0.350 $0.300 $0.500 $0.820 $0.800 $1.100
TRACKHOE WORK (EROSION & SEDMT CONT)
HR 100.000 $100.000 $80.000 $110.000 $150.000 $150.000 $200.000 $150.000
INTERSECTIONS (ACP)
SY 1,278.000 $37.000 $36.000 $34.000 $30.000 $33.460 $43.000 $48.000
DRIVEWAYS (ACP)
SY 7,647.000 $37.000 $22.000 $28.000 $25.000 $19.990 $28.000 $30.000
TURNOUTS (ACP)
SY 1,645.000 $34.000 $24.000 $31.000 $25.000 $32.190 $43.000 $56.000
DRIVEWAYS (CONC) (HES)
SY 1,314.000 $85.000 $110.000 $95.000 $110.000 $110.000 $100.000 $125.000
RUMBLE STRIPS (SHOULDER)
LF 69,362.000 $0.140 $0.150 $0.220 $0.180 $0.200 $0.200 $0.140
RUMBLE STRIPS (CENTERLINE)
LF 34,481.000 $0.150 $0.130 $0.220 $0.180 $0.200 $0.200 $0.140
MTL W-BEAM GD FEN (TIM POST)
LF 1,300.000 $20.000 $23.000 $25.000 $23.000 $27.000 $26.000 $26.950
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 6.000 $1,435.000 $1,600.000 $1,550.000 $1,850.000 $1,700.000 $3,200.000 $1,705.000
MTL BM GD FEN (LONG SPAN SYSTEM)
EA 2.000 $772.000 $1,100.000 $1,250.000 $1,200.000 $1,385.000 $1,300.000 $1,380.000
REMOVE METAL BEAM GUARD FENCE
LF 1,300.000 $2.750 $2.200 $2.250 $2.250 $2.750 $7.000 $2.750
GUARDRAIL END TREATMENT (INSTALL)
EA 10.000 $2,500.000 $2,800.000 $2,800.000 $2,800.000 $2,855.000 $2,730.000 $2,860.000
MAILBOX INSTALL-S (TWG-POST) TY 2
EA 37.000 $222.000 $226.000 $180.000 $200.000 $237.000 $225.000 $235.000
MAILBOX INSTALL-D (TWG-POST) TY 2
EA 4.000 $234.000 $226.000 $220.000 $240.000 $236.000 $225.000 $235.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 20.000 $506.000 $530.000 $520.000 $560.000 $550.000 $525.000 $550.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 9.000 $590.000 $640.000 $600.000 $630.000 $670.000 $640.000 $670.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 4.000 $674.000 $730.000 $730.000 $760.000 $765.000 $730.000 $765.000
IN SM RD SN SUP&AM TYS80(1)SA(T-2EXT)
EA 4.000 $775.000 $1,000.000 $950.000 $1,000.000 $1,085.000 $1,000.000 $1,085.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 6.000 $1,000.000 $990.000 $930.000 $980.000 $1,035.000 $1,000.000 $1,050.000
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
EA 6.000 $800.000 $990.000 $1,000.000 $1,100.000 $1,030.000 $1,000.000 $1,050.000
IN SM RD SN SUP&AM TYS80(2)SA(P-EXAL)
EA 1.000 $1,600.000 $1,800.000 $1,480.000 $1,525.000 $1,810.000 $1,800.000 $1,900.000
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 37.000 $260.000 $340.000 $380.000 $400.000 $360.000 $340.000 $360.000
REMOVE SM RD SN SUP&AM
EA 94.000 $87.000 $79.000 $80.000 $90.000 $83.000 $80.000 $80.000
INSTL DEL ASSM (D-SW)SZ 2(WC)GND(BI)
EA 54.000 $80.000 $79.000 $80.000 $90.000 $83.000 $79.000 $80.000
INSTL OM ASSM (OM-3L)(TWT)GND
EA 5.000 $274.000 $300.000 $280.000 $300.000 $312.000 $300.000 $315.000
INSTL OM ASSM (OM-3R)(TWT)GND
EA 5.000 $259.000 $300.000 $280.000 $300.000 $312.000 $300.000 $315.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 24.000 $31.000 $28.000 $25.000 $30.000 $35.000 $34.000 $36.000
INSTL OM ASSM (OM-2Z)(WFLX)GND
EA 106.000 $25.000 $79.000 $75.000 $80.000 $82.000 $79.000 $80.000
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 150,964.000 $0.170 $0.140 $0.100 $0.160 $0.150 $0.110 $0.110
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
LF 5,819.000 $0.170 $0.140 $0.120 $0.160 $0.150 $0.130 $0.130
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 54,308.000 $0.220 $0.140 $0.100 $0.160 $0.150 $0.110 $0.110
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 67,833.000 $0.230 $0.150 $0.010 $1.000 $0.050 $0.850 $1.200
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 216.000 $7.000 $8.000 $9.000 $9.000 $9.350 $1.700 $8.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 5,676.000 $0.280 $0.750 $1.000 $1.000 $1.500 $2.000 $1.200
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 664.000 $0.790 $0.800 $1.000 $0.850 $0.830 $1.050 $1.100
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 401.000 $5.450 $6.600 $6.000 $6.500 $6.900 $6.300 $6.600
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 77,426.000 $0.350 $0.350 $0.420 $0.380 $0.380 $0.440 $0.460
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 5,682.000 $0.220 $0.350 $0.500 $0.380 $0.370 $0.530 $0.550
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 51,750.000 $0.350 $0.350 $0.420 $0.380 $0.380 $0.440 $0.460
PREFAB PAV MRK TY C (W) (ARROW)
EA 8.000 $194.000 $200.000 $185.000 $200.000 $205.000 $195.000 $205.000
PREFAB PAV MRK TY C (W) (WORD)
EA 8.000 $300.000 $300.000 $220.000 $300.000 $315.000 $230.000 $240.000
PREFAB PAV MRK TY C (Y) (4") (SLD)
LF 200.000 $2.000 $3.000 $5.000 $3.000 $3.050 $5.250 $5.500
REFL PAV MRKR TY I-A
EA 58.000 $3.090 $3.600 $4.000 $3.600 $3.800 $4.200 $4.400
REFL PAV MRKR TY I-C
EA 36.000 $3.300 $3.600 $4.000 $3.600 $3.800 $4.200 $4.400
REFL PAV MRKR TY II-A-A
EA 1,051.000 $3.150 $3.600 $3.350 $3.600 $3.800 $3.500 $3.650
ELIM EXT PAV MRK & MRKS (4")
LF 1,800.000 $0.420 $1.100 $1.000 $1.100 $1.100 $1.050 $1.100
PAV SURF PREP FOR MRK (4")
LF 1,800.000 $0.140 $0.120 $1.000 $0.200 $0.110 $1.050 $1.100
SP MIXES SP-B PG64-22
TON 12,203.000 $98.000 $94.000 $99.750 $80.000 $92.880 $105.000 $112.000
SP MIXES SP-D SAC-A PG70-22
TON 15,046.000 $106.000 $103.000 $107.750 $100.000 $108.660 $117.000 $115.000
TACK COAT
GAL 13,678.000 $3.160 $3.300 $0.010 $3.000 $3.650 $3.000 $3.500
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $13,100.000 $12,000.000 $18,500.000 $9,800.000 $12,000.000 $8,000.000 $16,000.000
PREFORMED CENTERLINE RUMBLE STRIP
LF 600.000 $3.410 $11.000 $5.000 $12.000 $11.000 $10.000 $10.000
TMA (STATIONARY)
DAY 70.000 $137.000 $200.000 $150.000 $160.000 $100.000 $470.000 $200.000
TMA (MOBILE OPERATION)
DAY 15.000 $84.000 $100.000 $0.010 $200.000 $100.000 $150.000 $200.000
Totals: $6,306,253.860 $5,923,688.840 $5,966,914.820 $6,004,050.490 $6,233,572.740 $6,876,598.740 $7,444,572.640