Show Job Controls
Bid Cobra

CHAMBERS IH0010 (6499-85-001)

Items: 51

County: CHAMBERS
Length: 0.0100 MILES
Highway: IH0010
District: BEAUMONT
Control Number: 6499-85-001
DBE Goal: 0.0%
Project: RMC - A00220510
Guaranty: $10,000.00
Time: 30 WORKING DAYS
Engineer's Estimate: $509,774.40
Date: 06/23/2026 11:00 AM CDT (26 days ago)
Contract Number: 6262004
Type: BASE REPAIR WITH SEAL COAT AND/OR OVERLAY
Project ID: A00220510
Project Description: BASE REPAIR, MILL AND 2" OVERLAY W/ SP TY C
Mail/Deliver Bids To: N/A
ROBERTO M RODRIGUEZ
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (2)
E
Engineer's Estimate
$509,774.40
$570,461.00
Over/Under Est: 11.9% $60,686.60
Over/Under Est: 16.75% $85,381.01
Amt Left: 4.33% $24,694.41

Bid Items & Bid Tabulations

51 Total 0 of 51
CHAMBERS  |  IH0010  |  BEAUMONT  |  6499-85-001  |  06/23/2026 11:00 AM CDT  |  $509,774.40  |  RMC - A00220510  |  BASE REPAIR WITH SEAL COAT AND/OR OV...  |  30 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
TEXAS MATERIALS GROUP, INC.
CORNERSTONE PAVING AND CONSTRUCTION, L.L.C.
REMOV CONC (MOWSTRIP)
LF 180.000 $10.000 $39.250 $25.000
BACKFILL (TY A OR B)
STA 46.000 $195.000 $232.500 $370.000
BROADCAST SEED (TEMP_WARM)
SY 6,370.000 $0.130 $0.250 $0.800
VEGETATIVE WATERING
TGL 28.000 $6.500 $47.000 $50.000
SP MIXES SP-C SAC-A PG76-22
TON 1,685.000 $153.000 $164.250 $163.000
TACK COAT
GAL 1,531.000 $3.500 $4.250 $5.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
SY 1,653.000 $75.000 $57.500 $86.940
PLANE & TEXT ASPH CONC PAV(0" TO 2")
SY 2,853.000 $3.500 $4.000 $2.800
RIPRAP (MOW STRIP)(4 IN)
CY 12.000 $532.000 $899.250 $800.000
MOBILIZATION
LS 1.000 $38,900.000 $47,325.000 $58,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 2.000 $6,750.000 $678.000 $3,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 30.000 $70.000 $1,292.500 $80.000
TMA (STATIONARY)
DAY 28.000 $190.000 $337.000 $275.000
TMA (MOBILE OPERATION)
DAY 2.000 $190.000 $777.000 $275.000
DRIVEWAYS (BASE)
SY 10.000 $35.000 $233.000 $250.000
MTL W-BEAM GD FEN (TIM POST)
LF 180.000 $26.000 $32.250 $40.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 2.000 $2,230.000 $2,220.000 $1,800.000
REMOVE METAL BEAM GUARD FENCE
LF 180.000 $2.500 $2.750 $5.000
GUARDRAIL END TREATMENT (INSTALL)
EA 2.000 $3,090.000 $3,540.500 $3,500.000
GUARDRAIL END TREATMENT (REMOVE)
EA 2.000 $235.000 $281.000 $400.000
REPLC DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 7.000 $50.000 $47.500 $250.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 370.000 $1.500 $4.000 $1.000
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 2,347.000 $0.980 $1.000 $1.000
REFL PAV MRK TY I (W)12"(SLD)(090MIL)
LF 32.000 $3.000 $3.000 $2.750
REFL PAV MRK TY I (W)18"(SLD)(090MIL)
LF 158.000 $1.000 $9.250 $8.250
REF PAV MRK TY I(W)36"(YLD TRI)(090MIL)
EA 10.000 $38.000 $39.250 $35.000
PAVEMENT SLER 6"
LF 2,600.000 $0.200 $0.250 $0.250
PAVEMENT SLER 8"
LF 963.000 $0.200 $0.500 $0.400
PAVEMENT SLER 12"
LF 32.000 $0.200 $0.500 $0.550
PAVEMENT SLER 18"
LF 32.000 $0.200 $0.750 $0.600
REFL PAV MRK TY I (W)6"(BRK)(090MIL)
LF 1,270.000 $0.650 $1.000 $0.900
REFL PAV MRK TY I (W)6"(SLD)(090MIL)
LF 6,759.000 $0.460 $1.000 $0.850
REFL PAV MRK TY I (Y)6"(SLD)(090MIL)
LF 5,160.000 $0.500 $1.000 $0.850
PREFAB PM TY C (W)(24")(SLD)
LF 22.000 $14.000 $20.750 $18.500
PREFAB PM TY C (W)(ARROW)
EA 8.000 $191.000 $281.000 $250.000
PREFAB PM TY C (W)(DBL ARROW)
EA 2.000 $360.000 $337.250 $300.000
PREFAB PM TY C (W)(UTURN ARROW)
EA 2.000 $345.000 $337.250 $300.000
PREFAB PM TY C (W)(WORD)
EA 5.000 $250.000 $365.000 $325.000
REFL PAV MRKR TY II-C-R
EA 205.000 $4.000 $7.750 $7.000
ELIM EXT PM & MRKS (6")
LF 882.000 $0.400 $0.500 $0.450
ELIM EXT PM & MRKS (8")
LF 400.000 $1.070 $0.750 $0.650
ELIM EXT PM & MRKS (12")
LF 32.000 $1.400 $1.000 $1.000
ELIM EXT PM & MRKS (18")
LF 158.000 $1.400 $1.500 $1.250
ELIM EXT PM & MRKS (ARROW)
EA 8.000 $1.400 $39.250 $35.000
ELIM EXT PM & MRKS (WORD)
EA 5.000 $1.400 $61.750 $55.000
PAV SURF PREP FOR MRK (6")
LF 882.000 $0.100 $0.250 $0.020
PAV SURF PREP FOR MRK (8")
LF 400.000 $0.100 $0.250 $0.060
PAV SURF PREP FOR MRK (12")
LF 40.000 $0.500 $0.250 $0.080
PAV SURF PREP FOR MRK (18")
LF 163.000 $0.500 $0.250 $0.100
PAV SURF PREP FOR MRK (ARROW)
EA 8.000 $0.500 $11.250 $10.000
PAV SURF PREP FOR MRK (WORD)
EA 5.000 $0.500 $16.750 $15.000
Totals: $509,774.400 $570,461.000 $595,155.410