Show Job Controls
Bid Cobra

CHAMBERS IH0010 (6395-00-001)

Items: 83

County: CHAMBERS
Length: N/A
Highway: IH0010
District: BEAUMONT
Control Number: 6395-00-001
DBE Goal: N/A
Project: RMC - 639500001
Guaranty: N/A
Time: 365 CALENDAR DAYS
Engineer's Estimate: $699,228.00
Date: 01/06/2023 (3 years ago)
Contract Number: N/A
Type: METAL BEAM GUARD FENCE REPAIR
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Documents:
Bidders (3)
E
Engineer's Estimate
$699,228.00
$359,337.00
Over/Under Est: -48.61% -$339,891.00
Over/Under Est: -44.51% -$311,240.50
Amt Left: 7.97% $28,650.50
Over/Under Est: -24.46% -$171,052.00
Amt Left: 46.99% $168,839.00
Delta: -36.13% -$140,188.50

Bid Items & Bid Tabulations

83 Total 0 of 83
CHAMBERS  |  IH0010  |  BEAUMONT  |  6395-00-001  |  01/06/2023  |  $699,228.00  |  RMC - 639500001  |  METAL BEAM GUARD FENCE REPAIR  |  365 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
RHINO EQUITY, LLC
ROY JORGENSEN ASSOCIATES, INC.
ISI CONTRACTING, INC.
REMOVING CONC (RIPRAP)
SY 15.000 $95.000 $15.000 $50.000 $25.000
CONC STR REPAIR (STANDARD)
SF 25.000 $245.000 $100.000 $300.000 $300.000
RIPRAP (MOW STRIP)(4 IN)
CY 30.000 $800.000 $250.000 $450.000 $650.000
RAIL (TY T402)(HPC)
LF 1.000 $230.000 $100.000 $2,000.000 $200.000
MOBILIZATION (CALLOUT)
EA 30.000 $600.000 $1.000 $1,000.000 $500.000
MOBILIZATION (EMERGENCY)
EA 5.000 $1,510.000 $1,000.000 $1,500.000 $1,500.000
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
LF 120.000 $117.000 $65.000 $165.000 $75.000
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
LF 120.000 $36.000 $30.000 $30.000 $8.000
MTL W-BEAM GD FEN (TIM POST)
LF 100.000 $40.000 $30.000 $27.000 $15.000
MTL THRIE-BEAM GD FEN (TIM POST)
LF 30.000 $160.000 $25.000 $35.000 $49.000
TERMINAL ANCHOR SECTION
EA 5.000 $250.000 $1.000 $300.000 $1.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 1.000 $2,238.000 $200.000 $2,500.000 $2,200.000
MTL BEAM GD FEN TRANS (TL2)
EA 1.000 $1,200.000 $200.000 $850.000 $1,250.000
MTL BEAM GD FEN TRANS (T101)
EA 1.000 $1,875.000 $200.000 $850.000 $1,250.000
MTL W-BEAM GD FEN ADJUSTMENT
LF 30.000 $10.500 $100.000 $12.000 $15.000
MTL THRIE-BEAM GD FEN ADJUSTMENT
LF 50.000 $4.500 $1.000 $12.000 $30.000
TERMINAL ANCHOR SECTION ADJUSTMENT
EA 2.000 $585.000 $1.000 $500.000 $300.000
TRANSITION ADJUSTMENT
EA 5.000 $925.000 $1.000 $500.000 $950.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 2.000 $1,630.000 $750.000 $1,500.000 $2,000.000
MTL BM GD FEN (LONG SPAN SYSTEM)
LF 20.000 $40.000 $1.000 $25.000 $50.000
REMOVE METAL BEAM GUARD FENCE
LF 300.000 $15.000 $1.000 $5.000 $5.000
REMOVE TERMINAL ANCHOR SECTION
EA 5.000 $320.000 $1.000 $400.000 $1.000
GUARDRAIL END TREATMENT (INSTALL)
EA 2.000 $3,400.000 $4,000.000 $3,200.000 $4,000.000
GUARDRAIL END TREATMENT (MOVE & RESET)
EA 3.000 $1,410.000 $1.000 $350.000 $450.000
GUARDRAIL END TREATMENT (REMOVE)
EA 2.000 $310.000 $1.000 $350.000 $200.000
CRASH CUSH ATTEN (DES SOURCE)
EA 1.000 $1,800.000 $1,000.000 $5,000.000 $2,500.000
CRASH CUSH ATTEN (REMOVE)
EA 1.000 $1,400.000 $500.000 $2,250.000 $450.000
INSTL DEL ASSM (D-SW)SZ (BRF)GF1
EA 5.000 $25.000 $10.000 $25.000 $15.000
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
EA 5.000 $60.000 $10.000 $30.000 $15.000
INSTL DEL ASSM (D-SY)SZ (BRF)GF1
EA 5.000 $22.000 $10.000 $25.000 $15.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 5.000 $22.000 $5.000 $100.000 $20.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 5.000 $35.000 $5.000 $100.000 $20.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 5.000 $30.000 $5.000 $100.000 $20.000
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND
EA 5.000 $40.000 $5.000 $80.000 $20.000
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND(BI)
EA 5.000 $100.000 $5.000 $80.000 $20.000
REPAIR RAIL ELEMENT (W - BEAM)
LF 3,500.000 $19.000 $10.000 $17.500 $16.000
REPAIR RAIL ELEMENT (THRIE - BEAM)
LF 15.000 $55.000 $30.000 $30.000 $25.000
REP RAIL ELMNT(THRIE-BM TRANS TO W -BM)
LF 70.000 $40.000 $30.000 $30.000 $40.000
REPAIR RAIL ELEMENT (CURVED RAIL)
LF 50.000 $55.000 $100.000 $50.000 $80.000
REM / REPL TIMBER/STL POST W/O CONC FND
EA 5.000 $60.000 $1,000.000 $100.000 $80.000
REM / REPL TIMBER / STL POST W/CONC FND
EA 60.000 $80.000 $150.000 $75.000 $80.000
REM / REPL STEEL POST W / CONC FND
EA 5.000 $145.000 $80.000 $120.000 $95.000
REPAIR STEEL POST WITH BASE PLATE
EA 1.000 $400.000 $100.000 $500.000 $500.000
REALIGN POSTS
EA 210.000 $55.000 $5.000 $15.000 $5.000
INSTALL BLOCKOUT (TYPE SPECIFIED)
EA 38.000 $80.000 $5.000 $15.000 $25.000
REMOVE & REPLACE BLOCKOUT
EA 100.000 $15.000 $20.000 $20.000 $25.000
REPLACE SINGLE GDRAIL TERMINAL RAIL
LF 1,045.000 $50.000 $40.000 $32.500 $24.000
REPLACE SINGLE GDRAIL TERMINAL POST
EA 50.000 $60.000 $50.000 $300.000 $30.000
REMOVE GDRAIL END TRT / REPL WITH SGT
EA 2.000 $4,800.000 $4,000.000 $5,000.000 $3,000.000
REPL SINGLE GDRAIL TERM IMPACT HEAD
EA 15.000 $1,000.000 $1,250.000 $1,400.000 $1,000.000
REM & RESET SGT IMPACT HEAD
EA 22.000 $180.000 $250.000 $100.000 $150.000
REPLACE SGT CABLE ASSEMBLY
EA 15.000 $80.000 $150.000 $100.000 $100.000
REPLACE SGT STRUT
EA 10.000 $90.000 $100.000 $100.000 $71.000
REPLACE SGT OBJECT MARKER
EA 16.000 $25.000 $100.000 $50.000 $35.000
REPAIR RAIL ELEMENT (CURVED RAIL)(FURN)
LF 12.000 $75.000 $100.000 $50.000 $48.000
REPLACE POSTS (TL-4)
EA 770.000 $240.000 $100.000 $1.000 $85.000
CABLE SPLICE / TURNBUCKLE (TL-4)
EA 10.000 $290.000 $215.000 $400.000 $500.000
REPAIR CONCRETE FOUNDATION (TL-4)
EA 2.000 $200.000 $250.000 $500.000 $23.000
REPR OR REPLC CABLE BARR TERM SEC(TL-4)
EA 20.000 $3,200.000 $500.000 $100.000 $700.000
REPLACE CABLE (TL-4)
LF 1,000.000 $5.000 $2.500 $0.250 $2.500
CHECK / RE-TENSION CABLE
EA 40.000 $500.000 $25.000 $50.000 $200.000
REPLACE POSTS (TL-4)(FURN)
EA 25.000 $200.000 $25.000 $1.000 $92.000
REP OR REPLC CAB BAR TM SEC TL-4(FURN)
EA 5.000 $500.000 $500.000 $100.000 $85.000
REMOVE AND REPLACE (TRACC)
EA 1.000 $7,800.000 $1,000.000 $500.000 $25,000.000
REPAIR (TRACC)
EA 1.000 $3,000.000 $700.000 $1,500.000 $966.000
REPAIR (WIDE TRACC)
EA 1.000 $1,500.000 $700.000 $1,500.000 $966.000
REMOVE AND REPLACE (NARROW QUAD)
EA 1.000 $27,000.000 $7,000.000 $500.000 $28,000.000
REPAIR (CATGR - FRONT SECTION)
EA 1.000 $500.000 $700.000 $500.000 $3,002.000
REPAIR (CATGR - END SECTION)
EA 1.000 $500.000 $700.000 $500.000 $1,529.000
REMOVE AND REPLACE (CATGR)
EA 1.000 $5,000.000 $700.000 $500.000 $8,948.000
REPAIR (QUAD) (N) (BAY)
EA 7.000 $1,500.000 $700.000 $1,200.000 $215.000
REPAIR (QUAD) (W) (BAY)
EA 1.000 $3,000.000 $700.000 $1,500.000 $2,577.000
REPAIR (GREAT SYS) (BAY)
EA 1.000 $500.000 $700.000 $500.000 $322.000
REPAIR REACT (CYLINDERS)
EA 1.000 $2,800.000 $700.000 $2,900.000 $3,113.000
REPAIR REACT (W) (CYLINDERS)
EA 1.000 $1,400.000 $700.000 $500.000 $3,113.000
REPAIR (TRACC) (BAY)
EA 4.000 $650.000 $700.000 $700.000 $483.000
REPAIR (WIDE TRACC) (BAY)
EA 1.000 $270.000 $700.000 $750.000 $966.000
REMOVE AND REPLACE (TAU II) (N)
EA 1.000 $20,000.000 $3,000.000 $20,000.000 $28,000.000
REMOVE AND REPLACE TAU II (W)
EA 1.000 $20,000.000 $7,000.000 $30,000.000 $33,000.000
CONC RAIL REPAIR(REMOVE AND REPL RAIL)
LF 1.000 $300.000 $700.000 $2,000.000 $500.000
BRIDGE JOINT REPAIR (FULL DEPTH)
LF 1.000 $500.000 $700.000 $1,500.000 $1,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 1.000 $130.000 $300.000 $1,250.000 $3,000.000
TMA (STATIONARY)
DAY 4.000 $215.000 $10,000.000 $3,000.000 $15,000.000
Totals: $699,228.000 $359,337.000 $387,987.500 $528,176.000