Show Job Controls
Bid Cobra

CHAMBERS IH0010 (6342-45-001)

Items: 68

County: CHAMBERS
Length: N/A
Highway: IH0010
District: BEAUMONT
Control Number: 6342-45-001
DBE Goal: N/A
Project: RMC - 634245001
Guaranty: N/A
Time: 365 W
Engineer's Estimate: $232,868.00
Date: 07/10/2019 (6 years ago)
Contract Number: N/A
Type: MBGF/GUARDRAIL REPAIRS
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (2)
E
Engineer's Estimate
$232,868.00
$268,740.00
Over/Under Est: 15.4% $35,872.00
Over/Under Est: 98.19% $228,662.00
Amt Left: 71.74% $192,790.00

Bid Items & Bid Tabulations

68 Total 0 of 68
CHAMBERS  |  IH0010  |  BEAUMONT  |  6342-45-001  |  07/10/2019  |  $232,868.00  |  RMC - 634245001  |  MBGF/GUARDRAIL REPAIRS  |  365 W
Item Code
Description
Unit
Quantity
Engineer's Estimate
ISI CONTRACTING, INC.
WIDGEON CONSTRUCTION, INC.
REMOVING CONC (RIPRAP)
SY 3.000 $10.000 $25.000 $500.000
CONC STR REPAIR (STANDARD)
SF 5.000 $100.000 $100.000 $175.000
CONC STR REPR(REMOVE AND REPLACE CAP)
CY 2.000 $1,900.000 $2,500.000 $2,500.000
RIPRAP (MOW STRIP)(4 IN)
CY 1.000 $800.000 $800.000 $1,500.000
RAIL (TY T402)(HPC)
LF 1.000 $500.000 $1,500.000 $2,500.000
MOBILIZATION (CALLOUT)
EA 13.000 $725.000 $500.000 $1,500.000
MOBILIZATION (EMERGENCY)
EA 1.000 $1,200.000 $1,500.000 $4,500.000
MTL W-BEAM GD FEN (TIM POST)
LF 25.000 $20.000 $20.000 $40.000
MTL THRIE-BEAM GD FEN (TIM POST)
LF 30.000 $72.000 $60.000 $140.000
TERMINAL ANCHOR SECTION
EA 1.000 $200.000 $1.000 $1,000.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 1.000 $2,500.000 $2,500.000 $2,200.000
MTL BEAM GD FEN TRANS (TL2)
EA 1.000 $848.000 $1,100.000 $1,500.000
MTL BEAM GD FEN TRANS (T101)
EA 1.000 $1,200.000 $1,500.000 $1,300.000
MTL W-BEAM GD FEN ADJUSTMENT
LF 25.000 $18.000 $10.000 $35.000
MTL THRIE-BEAM GD FEN ADJUSTMENT
LF 1.000 $27.000 $40.000 $175.000
TRANSITION ADJUSTMENT
EA 1.000 $200.000 $200.000 $300.000
MTL BM GD FEN (LONG SPAN SYSTEM)
LF 5.000 $24.000 $75.000 $95.000
REMOVE METAL BEAM GUARD FENCE
LF 125.000 $3.000 $2.000 $10.000
REMOVE TERMINAL ANCHOR SECTION
EA 1.000 $80.000 $1.000 $250.000
GUARDRAIL END TREATMENT (INSTALL)
EA 1.000 $2,900.000 $3,200.000 $3,500.000
CRASH CUSH ATTEN (REMOVE)
EA 1.000 $840.000 $600.000 $1,200.000
INSTL DEL ASSM (D-SW)SZ 1(FLX)GND
EA 1.000 $17.000 $25.000 $40.000
INSTL DEL ASSM (D-SW)SZ 1(FLX)GND(BI)
EA 1.000 $17.000 $26.000 $40.000
INSTL DEL ASSM (D-SY)SZ 1(FLX)GND
EA 3.000 $16.500 $25.000 $50.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 3.000 $8.000 $14.000 $50.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 3.000 $10.000 $14.000 $50.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 5.000 $8.000 $14.000 $50.000
SPALLING REPAIR (POLYMERIC) (FLEXIBLE)
GAL 1.000 $320.000 $300.000 $2,000.000
REPAIR RAIL ELEMENT (W - BEAM)
LF 2,000.000 $14.750 $18.000 $25.000
REPAIR RAIL ELEMENT (THRIE - BEAM)
LF 15.000 $29.000 $25.000 $165.000
REP RAIL ELMNT(THRIE-BM TRANS TO W -BM)
LF 70.000 $29.000 $25.000 $165.000
REPAIR RAIL ELEMENT (CURVED RAIL)
LF 160.000 $40.000 $39.000 $95.000
REM / REPL TIMBER/STL POST W/O CONC FND
EA 35.000 $34.500 $40.000 $100.000
REM / REPL TIMBER / STL POST W/CONC FND
EA 60.000 $38.000 $45.000 $195.000
REM / REPL STEEL POST W / CONC FND
EA 5.000 $100.000 $90.000 $195.000
REPAIR STEEL POST WITH BASE PLATE
EA 1.000 $175.000 $300.000 $320.000
REALIGN POSTS
EA 210.000 $6.000 $6.000 $45.000
INSTALL BLOCKOUT (TYPE SPECIFIED)
EA 38.000 $8.000 $10.000 $15.000
REMOVE & REPLACE BLOCKOUT
EA 100.000 $8.000 $11.000 $19.500
REPLACE SINGLE GDRAIL TERMINAL RAIL
LF 1,045.000 $19.000 $25.000 $45.000
REPLACE SINGLE GDRAIL TERMINAL POST
EA 50.000 $45.000 $45.000 $120.000
REMOVE GDRAIL END TRT / REPL WITH SGT
EA 2.000 $3,000.000 $3,000.000 $2,900.000
REPL SINGLE GDRAIL TERM IMPACT HEAD
EA 15.000 $1,112.000 $1,100.000 $1,000.000
REM & RESET SGT IMPACT HEAD
EA 22.000 $135.000 $150.000 $495.000
REPLACE SGT CABLE ASSEMBLY
EA 15.000 $103.000 $105.000 $210.000
REPLACE SGT STRUT
EA 10.000 $74.000 $80.000 $195.000
REPLACE SGT OBJECT MARKER
EA 16.000 $30.000 $30.000 $70.000
REPAIR RAIL ELEMENT (CURVED RAIL)(FURN)
LF 12.000 $7.000 $9.000 $75.000
REMOVE AND REPLACE (TRACC)
EA 1.000 $5,000.000 $16,000.000 $14,400.000
REPAIR (TRACC)
EA 1.000 $2,000.000 $2,000.000 $5,000.000
REPAIR (WIDE TRACC)
EA 1.000 $2,000.000 $4,000.000 $5,000.000
REMOVE AND REPLACE (NARROW QUAD)
EA 1.000 $6,000.000 $25,000.000 $28,000.000
REPAIR (CATGR - FRONT SECTION)
EA 1.000 $500.000 $1,200.000 $4,500.000
REPAIR (CATGR - END SECTION)
EA 1.000 $500.000 $1,200.000 $2,500.000
REMOVE AND REPLACE (CATGR)
EA 1.000 $6,250.000 $6,000.000 $9,500.000
REPAIR (QUAD) (N) (BAY)
EA 7.000 $1,025.000 $1,100.000 $2,285.000
REPAIR (QUAD) (W) (BAY)
EA 1.000 $1,500.000 $1,600.000 $4,060.000
REPAIR (GREAT SYS) (BAY)
EA 1.000 $1,500.000 $1,000.000 $1,000.000
REPAIR REACT (CYLINDERS)
EA 1.000 $3,300.000 $3,200.000 $4,500.000
REPAIR REACT (W) (CYLINDERS)
EA 1.000 $3,300.000 $3,200.000 $4,500.000
REPAIR (TRACC) (BAY)
EA 4.000 $750.000 $900.000 $4,444.000
REPAIR (WIDE TRACC) (BAY)
EA 1.000 $1,200.000 $1,600.000 $4,444.000
REMOVE AND REPLACE (TAU II) (N)
EA 1.000 $10,000.000 $21,000.000 $30,000.000
REMOVE AND REPLACE TAU II (W)
EA 1.000 $15,000.000 $30,000.000 $45,000.000
CONC RAIL REPAIR(REMOVE AND REPL RAIL)
LF 1.000 $370.000 $600.000 $850.000
BRIDGE JOINT REPAIR (FULL DEPTH)
LF 1.000 $475.000 $750.000 $2,500.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 1.000 $150.000 $125.000 $1,500.000
TMA (STATIONARY)
DAY 4.000 $9,750.000 $275.000 $900.000
Totals: $232,868.000 $268,740.000 $461,530.000