Job Info for 1024-01-042

County: CHAMBERS Highway: FM 565 Date: 08/05/2020 (4 years ago) Engineer's Estimate: $8,262,079 Control Number: 1024-01-042
Project: STP 2018(850) District: BEAUMONT Time: 0 X Type: RECONSTRUCT AND REALIGN EXISTING ROADWAY

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $8,262,078.83
ANGEL BROTHERS HOLDINGS CORP.   $6,739,978.21 1
-18.42% | -$1,522,100.62
SMITH & COMPANY   $7,744,949.20 2
-6.26% | -$517,129.63
14.91% | $1,004,970.99
TRIPLE B SERVICES LLP   $8,232,717.83 3
-0.36% | -$29,361.00
22.15% | $1,492,739.62
6.30% | $487,768.63
COPASA INC   $8,382,726.90 4
1.46% | $120,648.07
24.37% | $1,642,748.69
1.82% | $150,009.07
TEXAS MATERIALS GROUP, INC.   $9,719,046.70 5
17.63% | $1,456,967.87
44.2% | $2,979,068.49
15.94% | $1,336,319.80
JOHNSON BROS. CORPORATION, A SOUTHLAND COMPANY   $9,723,914.00 6
17.69% | $1,461,835.17
44.27% | $2,983,935.79
0.05% | $4,867.30

Bid Items

Items: 92, 0 filtered
CHAMBERS FM 565  |  BEAUMONT  |  1024-01-042  |  08/05/2020  |  $8,262,079  |  STP 2018(850)  |  RECON AND REALIGN EXIST ROADWAY  |  0 X
Item code Description Unit Quantity Engineer's Estimate ANGEL BROTHERS HOLDINGS CORP. SMITH & COMPANY TRIPLE B SERVICES LLP COPASA INC TEXAS MATERIALS GROUP, INC. JOHNSON BROS. CORPORATION, A SOUTHLAND COMPANY
100 6002 PREPARING ROW STA 86.180 $5,000.000 $1,320.000 $960.000 $8,750.000 $2,507.970 $690.000 $7,300.000
105 6053 REMOV STAB BASE & ASPH PAV (12.5"-19") STA 27.900 $10.000 $2,415.000 $1,206.000 $1,000.000 $1,205.210 $2,750.000 $3,500.000
105 6090 RMV STAB BS & ASPH PAV(11.5"-22") SY 14,466.000 $10.000 $8.700 $6.150 $0.010 $3.080 $10.100 $12.000
106 6001 OBLITERATING ABANDONED ROAD STA 27.900 $1,000.000 $470.000 $799.000 $1.000 $1,957.400 $1,620.000 $650.000
110 6001 EXCAVATION (ROADWAY) CY 16,437.000 $10.000 $12.300 $20.000 $10.000 $6.060 $7.000 $10.000
132 6005 EMBANKMENT (FINAL)(ORD COMP)(TY C) CY 22,155.000 $15.000 $17.250 $17.000 $15.000 $19.870 $23.000 $13.000
134 6004 BACKFILL (TY A OR B) STA 86.180 $100.000 $240.000 $945.000 $20.000 $614.840 $750.000 $600.000
160 6003 FURNISHING AND PLACING TOPSOIL (4") SY 43,476.000 $1.000 $1.500 $1.250 $0.350 $1.580 $2.000 $1.150
164 6009 BROADCAST SEED (TEMP) (WARM) SY 25,894.000 $0.150 $0.350 $0.250 $0.230 $0.230 $0.130 $0.110
164 6011 BROADCAST SEED (TEMP) (COOL) SY 25,894.000 $0.150 $0.350 $0.250 $0.230 $0.230 $0.130 $0.100
164 6027 CELL FBR MLCH SEED(PERM)(URBAN)(CLAY) SY 51,788.000 $0.300 $0.370 $0.300 $0.310 $0.310 $0.300 $0.350
168 6001 VEGETATIVE WATERING MG 1,740.100 $40.000 $15.000 $21.000 $24.000 $14.920 $20.000 $11.000
247 6055 FL BS (CMP IN PLC)(TY D GR 3)(FNAL POS) CY 1,030.000 $83.000 $45.000 $136.000 $23.000 $116.530 $99.000 $70.000
260 6016 LIME (HYD, COM, OR QK(SLURRY)) TON 542.000 $170.000 $184.000 $162.000 $195.000 $186.930 $230.000 $250.000
260 6079 LIME TRT (SUBGRADE)(6") SY 29,357.000 $3.250 $1.750 $4.050 $6.000 $6.270 $4.290 $6.500
400 6005 CEM STABIL BKFL CY 245.000 $70.000 $65.000 $77.000 $38.000 $68.040 $121.000 $250.000
432 6022 RIPRAP (STONE COMMON)(DRY)(6 IN) CY 284.000 $240.000 $177.000 $129.000 $130.000 $172.840 $105.000 $115.000
460 6037 CMP (ALUMINUM 24") LF 56.000 $70.000 $72.000 $87.500 $600.000 $195.950 $81.000 $110.000
462 6016 CONC BOX CULV (7 FT X 5 FT) LF 150.000 $500.000 $553.000 $617.000 $600.000 $743.280 $810.000 $800.000
462 6065 CONC BOX CULV (8 FT X 6 FT)(EXTEND) LF 100.000 $500.000 $640.000 $874.000 $700.000 $839.380 $910.000 $1,400.000
464 6003 RC PIPE (CL III)(18 IN) LF 44.000 $60.000 $58.000 $67.000 $70.000 $114.460 $51.000 $115.000
464 6005 RC PIPE (CL III)(24 IN) LF 496.000 $80.000 $69.000 $67.000 $75.000 $128.540 $91.000 $140.000
464 6007 RC PIPE (CL III)(30 IN) LF 228.000 $95.000 $91.000 $113.000 $100.000 $149.150 $129.000 $180.000
464 6010 RC PIPE (CL III)(48 IN) LF 13.000 $250.000 $180.000 $257.000 $250.000 $691.900 $226.000 $525.000
466 6182 WINGWALL (PW - 1) (HW=7 FT) EA 2.000 $8,000.000 $26,415.000 $15,450.000 $33,000.000 $25,820.740 $27,500.000 $10,000.000
466 6183 WINGWALL (PW - 1) (HW=8 FT) EA 1.000 $8,000.000 $27,850.000 $18,500.000 $36,000.000 $27,709.250 $26,500.000 $15,000.000
467 6363 SET (TY II) (18 IN) (RCP) (6: 1) (P) EA 1.000 $800.000 $1,210.000 $710.000 $2,100.000 $2,391.940 $855.000 $2,200.000
467 6380 SET (TY II) (24 IN) (CMP) (6: 1) (P) EA 2.000 $1,000.000 $1,185.000 $1,088.000 $2,200.000 $2,745.410 $1,010.000 $2,400.000
467 6395 SET (TY II) (24 IN) (RCP) (6: 1) (P) EA 30.000 $1,400.000 $1,250.000 $1,088.000 $1,800.000 $2,650.450 $1,010.000 $4,400.000
467 6423 SET (TY II) (30 IN) (RCP) (6: 1) (P) EA 6.000 $1,600.000 $3,210.000 $2,886.000 $2,000.000 $3,879.560 $2,510.000 $6,100.000
467 6474 SET (TY II) (48 IN) (RCP) (3: 1) (C) EA 2.000 $4,000.000 $3,325.000 $6,304.000 $4,000.000 $6,216.440 $4,510.000 $7,200.000
472 6006 REMOV & RE - LAY PIPE (24 IN) LF 224.000 $50.000 $60.000 $103.000 $90.000 $79.850 $41.000 $160.000
480 6001 CLEAN EXIST CULVERTS EA 4.000 $500.000 $3,630.000 $1,286.000 $1,000.000 $3,001.720 $2,010.000 $1,600.000
496 6007 REMOV STR (PIPE) LF 853.000 $12.000 $13.000 $15.500 $1.000 $36.760 $31.000 $14.000
500 6001 MOBILIZATION LS 1.000 $539,964.690 $265,000.000 $250,000.000 $500,000.000 $500,000.000 $480,025.000 $700,000.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 10.000 $3,000.000 $1,755.000 $3,398.000 $1,850.000 $17,486.660 $2,000.000 $10,000.000
506 6002 ROCK FILTER DAMS (INSTALL) (TY 2) LF 290.000 $40.000 $32.500 $117.000 $115.000 $52.830 $33.000 $35.000
506 6011 ROCK FILTER DAMS (REMOVE) LF 290.000 $10.000 $11.000 $29.000 $5.000 $18.150 $10.000 $9.000
506 6020 CONSTRUCTION EXITS (INSTALL) (TY 1) SY 622.000 $40.000 $27.000 $30.500 $30.000 $61.650 $33.000 $25.000
506 6024 CONSTRUCTION EXITS (REMOVE) SY 622.000 $10.000 $11.000 $7.450 $0.500 $15.640 $10.000 $10.000
506 6038 TEMP SEDMT CONT FENCE (INSTALL) LF 1,000.000 $4.000 $4.300 $4.200 $4.000 $2.940 $2.950 $3.000
506 6039 TEMP SEDMT CONT FENCE (REMOVE) LF 1,000.000 $1.000 $1.100 $0.950 $0.500 $0.880 $1.010 $1.000
506 6041 BIODEG EROSN CONT LOGS (INSTL) (12") LF 1,000.000 $5.000 $5.400 $4.400 $5.000 $8.940 $5.550 $5.000
506 6043 BIODEG EROSN CONT LOGS (REMOVE) LF 1,000.000 $1.000 $1.100 $0.950 $0.500 $1.510 $1.000 $1.000
508 6001 CONSTRUCTING DETOURS SY 1,300.000 $80.000 $55.000 $39.000 $70.000 $49.450 $90.000 $75.000
512 6009 PORT CTB (FUR & INST)(LOW PROF)(TY 1) LF 2,200.000 $60.000 $10.700 $32.500 $22.000 $44.650 $81.000 $45.000
512 6010 PORT CTB (FUR & INST)(LOW PROF)(TY 2) LF 260.000 $70.000 $12.300 $35.000 $22.000 $49.080 $90.000 $38.000
512 6033 PORT CTB (MOVE)(LOW PROF)(TY 1) LF 1,420.000 $5.000 $4.700 $12.000 $10.000 $9.610 $10.500 $8.000
512 6034 PORT CTB (MOVE)(LOW PROF)(TY 2) LF 80.000 $5.000 $7.000 $12.000 $10.000 $9.610 $29.000 $8.000
512 6057 PORT CTB (REMOVE)(LOW PROF)(TY 1) LF 2,200.000 $8.000 $5.850 $17.500 $13.000 $15.310 $15.000 $15.000
512 6058 PORT CTB (REMOVE)(LOW PROF)(TY 2) LF 260.000 $10.000 $6.200 $17.500 $13.000 $15.310 $30.000 $15.000
530 6004 DRIVEWAYS (CONC) SY 400.000 $80.000 $108.000 $97.500 $130.000 $110.200 $126.000 $70.000
530 6005 DRIVEWAYS (ACP) SY 2,742.000 $40.000 $41.500 $51.000 $45.000 $43.600 $55.000 $45.000
530 6016 DRIVEWAYS (BASE) SY 1,422.000 $20.000 $25.000 $32.500 $26.000 $39.040 $26.000 $40.000
644 6001 IN SM RD SN SUP&AM TY10BWG(1)SA(P) EA 12.000 $450.000 $470.000 $406.000 $400.000 $726.000 $440.000 $525.000
644 6004 IN SM RD SN SUP&AM TY10BWG(1)SA(T) EA 12.000 $685.000 $555.000 $499.000 $500.000 $777.850 $520.000 $695.000
644 6007 IN SM RD SN SUP&AM TY10BWG(1)SA(U) EA 1.000 $700.000 $755.000 $720.000 $700.000 $829.710 $710.000 $1,250.000
644 6068 RELOCATE SM RD SN SUP&AM TY 10BWG EA 1.000 $300.000 $355.000 $350.000 $350.000 $414.850 $335.000 $560.000
644 6076 REMOVE SM RD SN SUP&AM EA 19.000 $80.000 $65.000 $101.000 $100.000 $114.830 $125.000 $90.000
658 6048 INSTL OM ASSM (OM-2Z)(FLX)GND EA 10.000 $50.000 $60.000 $84.500 $50.000 $50.350 $56.000 $100.000
662 6004 WK ZN PAV MRK NON-REMOV (W)4"(SLD) LF 37,313.000 $0.200 $0.350 $0.200 $0.200 $0.410 $0.330 $0.190
662 6010 WK ZN PAV MRK NON-REMOV (W)8"(DOT) LF 911.000 $0.300 $1.350 $0.500 $0.500 $0.830 $1.280 $0.350
662 6012 WK ZN PAV MRK NON-REMOV (W)8"(SLD) LF 290.000 $0.300 $1.100 $0.500 $0.500 $0.830 $1.000 $0.600
662 6017 WK ZN PAV MRK NON-REMOV (W)(ARROW) EA 8.000 $50.000 $110.000 $56.500 $55.000 $181.500 $101.000 $55.000
662 6023 WK ZN PAV MRK NON-REMOV (W)(RR XING) EA 1.000 $200.000 $432.000 $103.000 $200.000 $233.360 $410.000 $210.000
662 6032 WK ZN PAV MRK NON-REMOV (Y)4"(BRK) LF 862.000 $0.200 $0.350 $0.250 $0.250 $0.410 $0.340 $0.180
662 6034 WK ZN PAV MRK NON-REMOV (Y)4"(SLD) LF 34,034.000 $0.200 $0.350 $0.200 $0.200 $0.410 $0.330 $0.220
662 6048 WK ZN PAV MRK REMOV (REFL) TY I-C EA 77.000 $0.500 $4.300 $4.100 $4.000 $5.190 $4.100 $3.750
662 6050 WK ZN PAV MRK REMOV (REFL) TY II-A-A EA 463.000 $0.500 $3.800 $4.100 $4.000 $5.190 $3.550 $3.700
662 6109 WK ZN PAV MRK SHT TERM (TAB)TY W EA 45.000 $1.000 $0.850 $0.450 $5.000 $1.220 $2.750 $1.000
662 6111 WK ZN PAV MRK SHT TERM (TAB)TY Y-2 EA 2,036.000 $1.000 $0.850 $0.450 $5.000 $1.150 $2.000 $0.850
666 6029 REFL PAV MRK TY I (W)8"(DOT)(090MIL) LF 911.000 $3.000 $1.600 $1.550 $1.500 $1.140 $1.520 $1.250
666 6035 REFL PAV MRK TY I (W)8"(SLD)(090MIL) LF 290.000 $1.000 $1.350 $1.550 $1.500 $1.040 $1.280 $0.750
666 6302 RE PM W/RET REQ TY I (W)4"(SLD)(090MIL) LF 17,145.000 $0.350 $0.450 $0.500 $0.500 $0.670 $0.410 $0.250
666 6311 RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL) LF 862.000 $0.350 $0.450 $1.050 $1.000 $0.780 $0.410 $0.300
666 6314 RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL) LF 14,218.000 $0.350 $0.450 $0.500 $0.500 $0.670 $0.410 $0.250
668 6076 PREFAB PAV MRK TY C (W) (24") (SLD) LF 178.000 $12.000 $13.000 $13.500 $13.000 $11.930 $12.100 $13.000
668 6077 PREFAB PAV MRK TY C (W) (ARROW) EA 10.000 $200.000 $205.000 $154.000 $150.000 $207.430 $192.000 $215.000
668 6089 PREFAB PAV MRK TY C (W) (RR XING) EA 1.000 $500.000 $650.000 $643.000 $625.000 $466.710 $610.000 $600.000
672 6007 REFL PAV MRKR TY I-C EA 77.000 $4.000 $4.300 $4.100 $4.000 $5.190 $4.050 $3.750
672 6009 REFL PAV MRKR TY II-A-A EA 463.000 $4.000 $4.300 $4.100 $4.000 $5.190 $4.050 $3.750
677 6001 ELIM EXT PAV MRK & MRKS (4") LF 28,787.000 $0.400 $0.400 $0.250 $0.250 $0.360 $0.370 $0.350
760 6001 DITCH CLEANING AND RESHAPING (FOOT) LF 506.000 $5.000 $10.000 $18.000 $10.000 $19.060 $20.000 $6.000
800 6001 NO. OF WORKING DAYS $/D 10,000.000 $312.000 $208.000 $240.000 $246.000 $240.000 $312.000 $250.000
3076 6005 D-GR HMA TY-B PG64-28 TON 17,578.000 $69.280 $75.700 $85.500 $80.000 $82.630 $112.000 $100.000
3076 6066 TACK COAT GAL 4,221.000 $3.000 $2.650 $3.800 $5.000 $5.900 $6.000 $4.000
3077 6022 SP MIXES SP-C SAC-A PG70-22 TON 5,804.000 $87.820 $87.700 $106.000 $105.000 $104.890 $138.000 $140.000
3077 6041 SP MIXES SP-D PG64-22 TON 3,482.000 $76.360 $86.700 $101.000 $103.000 $101.400 $121.000 $140.000
3077 6075 TACK COAT GAL 8,442.000 $3.000 $2.650 $3.800 $6.000 $5.900 $4.300 $4.000
6001 6002 PORTABLE CHANGEABLE MESSAGE SIGN EA 2.000 $10,000.000 $8,100.000 $1,029.000 $15,000.000 $13,222.290 $95.000 $15,000.000
6185 6002 TMA (STATIONARY) DAY 149.000 $200.000 $80.000 $165.000 $275.000 $189.380 $240.000 $200.000
6185 6005 TMA (MOBILE OPERATION) DAY 15.000 $200.000 $740.000 $331.000 $300.000 $489.000 $208.000 $250.000
Totals: $8,262,078.83 $6,739,978.21 $7,744,949.20 $8,232,717.83 $8,382,726.92 $9,719,046.70 $9,723,914.00