PREPARING ROW
|
STA
|
2.000
|
$5,000.000
|
$2,500.000
|
$75,000.000
|
$30,000.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
481.000
|
$19.600
|
$7.000
|
$70.000
|
$30.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY C)
|
CY
|
634.000
|
$16.000
|
$35.000
|
$30.000
|
$55.000
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
819.000
|
$0.200
|
$1.300
|
$1.250
|
$2.500
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
819.000
|
$0.200
|
$1.300
|
$1.250
|
$2.500
|
|
|
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
|
SY
|
1,637.000
|
$3.000
|
$1.700
|
$1.550
|
$3.000
|
|
|
VEGETATIVE WATERING
|
MG
|
33.000
|
$20.000
|
$13.500
|
$74.420
|
$250.000
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY C)
|
SY
|
328.000
|
$3.000
|
$6.500
|
$5.750
|
$10.000
|
|
|
PROOF ROLLING
|
HR
|
40.000
|
$100.000
|
$84.000
|
$60.000
|
$125.000
|
|
|
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
|
TON
|
51.000
|
$180.000
|
$190.000
|
$180.000
|
$300.000
|
|
|
LIME TRT (SUBGRADE)(6")
|
SY
|
3,112.000
|
$1.800
|
$5.500
|
$8.000
|
$22.000
|
|
|
D-GR HMA(SQ) TY-B PG64-22
|
TON
|
1,370.000
|
$105.000
|
$100.000
|
$100.000
|
$200.000
|
|
|
D-GR HMA(SQ) TY-D SAC-A PG70-22
|
TON
|
257.000
|
$107.000
|
$150.000
|
$150.000
|
$250.000
|
|
|
TACK COAT
|
GAL
|
374.000
|
$8.000
|
$2.600
|
$2.500
|
$15.000
|
|
|
CEM STABIL BKFL
|
CY
|
92.000
|
$90.000
|
$35.000
|
$110.000
|
$250.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
687.000
|
$28.000
|
$8.000
|
$30.000
|
$45.000
|
|
|
TEMPORARY SPL SHORING (COFFERDAM)
|
SF
|
2,245.000
|
$20.000
|
$2.000
|
$60.000
|
$75.000
|
|
|
PRESTR CONC PIL (18 IN SQ)
|
LF
|
1,873.000
|
$145.000
|
$115.000
|
$147.000
|
$150.000
|
|
|
CL B CONC (FLUME)
|
CY
|
2.200
|
$500.000
|
$1,200.000
|
$1,000.000
|
$1,600.000
|
|
|
CL C CONC (ABUT)
|
CY
|
45.500
|
$1,300.000
|
$700.000
|
$1,400.000
|
$2,600.000
|
|
|
REINF CONC SLAB (BOX BEAM)
|
SF
|
2,569.000
|
$12.000
|
$11.000
|
$30.000
|
$35.000
|
|
|
APPROACH SLAB
|
CY
|
51.600
|
$350.000
|
$730.000
|
$650.000
|
$900.000
|
|
|
SHEAR KEY
|
CY
|
13.300
|
$250.000
|
$590.000
|
$250.000
|
$650.000
|
|
|
RETAINING WALL (SPREAD FOOTING)
|
SF
|
1,260.000
|
$77.000
|
$88.000
|
$110.000
|
$190.000
|
|
|
PRESTR CONC BOX BEAM (4B20)
|
LF
|
447.000
|
$200.000
|
$165.000
|
$210.000
|
$330.000
|
|
|
PRESTR CONC BOX BEAM (5B20)
|
LF
|
149.000
|
$210.000
|
$165.000
|
$250.000
|
$330.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
1.000
|
$600.000
|
$5,000.000
|
$1,500.000
|
$800.000
|
|
|
RIPRAP (STONE COMMON)(DRY)(12 IN)
|
CY
|
227.000
|
$170.000
|
$195.000
|
$180.000
|
$150.000
|
|
|
RIPRAP (STONE COMMON)(DRY)(18 IN)
|
CY
|
190.000
|
$140.000
|
$405.000
|
$180.000
|
$150.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
38.000
|
$520.000
|
$842.000
|
$500.000
|
$650.000
|
|
|
RAIL (TY T223)
|
LF
|
182.000
|
$150.000
|
$190.000
|
$150.000
|
$180.000
|
|
|
ARMOR JOINT (SEALED)
|
LF
|
61.000
|
$120.000
|
$170.000
|
$130.000
|
$150.000
|
|
|
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
|
EA
|
1.000
|
$36,000.000
|
$30,000.000
|
$198,000.000
|
$65,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$148,000.000
|
$159,000.000
|
$230,000.000
|
$275,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
11.000
|
$5,000.000
|
$8,250.000
|
$19,000.000
|
$2,000.000
|
|
|
CONSTRUCTION PERIMETER FENCE
|
LF
|
993.000
|
$5.000
|
$1.000
|
$5.000
|
$8.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
1,480.000
|
$3.000
|
$3.000
|
$2.750
|
$4.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
1,480.000
|
$1.000
|
$0.850
|
$0.750
|
$1.000
|
|
|
ONE-WAY TRAF CONT (PORT TRAF SIG)
|
MO
|
11.000
|
$3,000.000
|
$1,850.000
|
$4,000.000
|
$5,500.000
|
|
|
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
|
LF
|
600.000
|
$10.500
|
$150.000
|
$30.000
|
$90.000
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
600.000
|
$4.500
|
$5.000
|
$5.000
|
$20.000
|
|
|
PORT CTB (REMOVE)(SGL SLP)(TY 1)
|
LF
|
600.000
|
$5.400
|
$16.000
|
$15.000
|
$25.000
|
|
|
RUMBLE STRIPS (CENTERLINE) ASPHALT
|
LF
|
815.000
|
$0.200
|
$3.100
|
$1.000
|
$10.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
525.000
|
$23.000
|
$33.000
|
$30.000
|
$32.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$2,050.000
|
$1,825.000
|
$1,950.000
|
$2,500.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
400.000
|
$4.000
|
$6.000
|
$1.000
|
$5.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$2,700.000
|
$2,750.000
|
$3,500.000
|
$3,500.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
2.000
|
$350.000
|
$305.000
|
$225.000
|
$350.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
2.000
|
$1,950.000
|
$674.000
|
$1,000.000
|
$3,000.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
2.000
|
$900.000
|
$674.000
|
$600.000
|
$3,000.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
2.000
|
$9,000.000
|
$20,000.000
|
$9,150.000
|
$14,000.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
6.000
|
$500.000
|
$360.000
|
$550.000
|
$800.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
2.000
|
$790.000
|
$360.000
|
$650.000
|
$900.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
4.000
|
$110.000
|
$310.000
|
$65.000
|
$150.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
6.000
|
$17.000
|
$16.500
|
$25.000
|
$25.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
14.000
|
$29.000
|
$16.500
|
$45.000
|
$35.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
994.000
|
$0.350
|
$0.550
|
$0.500
|
$3.500
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
2,829.000
|
$1.050
|
$1.550
|
$1.500
|
$2.000
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
24.000
|
$8.050
|
$10.500
|
$10.000
|
$25.000
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
9,600.000
|
$1.000
|
$1.550
|
$1.500
|
$1.300
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
78.000
|
$1.400
|
$8.500
|
$1.000
|
$4.000
|
|
|
PAVEMENT SEALER 4"
|
LF
|
260.000
|
$0.300
|
$0.250
|
$0.200
|
$1.300
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
|
LF
|
2,380.000
|
$0.350
|
$0.550
|
$0.500
|
$1.300
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL)
|
LF
|
1,240.000
|
$0.350
|
$0.550
|
$0.500
|
$1.400
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
|
LF
|
5,754.000
|
$0.300
|
$0.550
|
$0.500
|
$1.300
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
138.000
|
$3.500
|
$5.150
|
$5.000
|
$10.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
6,958.000
|
$0.500
|
$0.550
|
$0.500
|
$0.700
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
9,374.000
|
$0.100
|
$0.050
|
$0.010
|
$0.700
|
|
|
FLOATING TURBIDITY BARRIER(FUR & INST)
|
LF
|
2,017.000
|
$49.000
|
$3.400
|
$20.000
|
$10.000
|
|
|
FLOATING TURBIDITY BARRIER (REMOVE)
|
LF
|
2,017.000
|
$14.000
|
$0.300
|
$10.000
|
$1.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$10,000.000
|
$6,000.000
|
$3,000.000
|
$21,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
32.000
|
$1,000.000
|
$1,500.000
|
$500.000
|
$350.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
2.000
|
$400.000
|
$4,000.000
|
$1,000.000
|
$450.000
|
|
Totals: |
$1,582,874.150
|
$1,598,096.250
|
$2,346,153.950
|
$2,641,170.600
|